Łódź Fabryczna Railway Station
   HOME

TheInfoList



OR:

Łódź Fabryczna is the largest and most modern
railway station Rail transport (also known as train transport) is a means of transport that transfers passengers and goods on wheeled vehicles running on rails, which are incorporated in tracks. In contrast to road transport, where the vehicles run on a pre ...
in the city of
Łódź Łódź, also rendered in English as Lodz, is a city in central Poland and a former industrial centre. It is the capital of Łódź Voivodeship, and is located approximately south-west of Warsaw. The city's coat of arms is an example of canti ...
,
Poland Poland, officially the Republic of Poland, is a country in Central Europe. It is divided into 16 administrative provinces called voivodeships, covering an area of . Poland has a population of over 38 million and is the fifth-most populous ...
. It was originally constructed at the initiative of industrialist
Karl Wilhelm Scheibler Karl Wilhelm Scheibler ( pl, Karol Scheibler, 1 September 1820 – 13 April 1881) was a German-born Polish industrialist, businessman and textile manufacturer. Biography Scheibler was born in Montjoie (today Monschau) in the Prussian Provinc ...
in 1865. In the old Polish classification of stations it was placed under the B category. The station is located in the centre of Łódź. Trains depart frequently via
Koluszki Koluszki is a town, and a major railway junction, in central Poland, in Łódź Voivodeship, about 20 km east of Łódź with a population of 12,776 (2020). The junction in Koluszki serves trains that go from Warsaw to Łódź, Wrocław, Cz ...
to ,
Kraków Kraków (), or Cracow, is the second-largest and one of the oldest cities in Poland. Situated on the Vistula River in Lesser Poland Voivodeship, the city dates back to the seventh century. Kraków was the official capital of Poland until 1596 ...
,
Częstochowa Częstochowa ( , ; german: Tschenstochau, Czenstochau; la, Czanstochova) is a city in southern Poland on the Warta River with 214,342 inhabitants, making it the thirteenth-largest city in Poland. It is situated in the Silesian Voivodeship (admin ...
, and
Tomaszów Mazowiecki Tomaszów Mazowiecki (, yi, טאָמעשעוו or ''Tomashuv'') is a city in central Poland with 60,529 inhabitants (2021). The fourth most populous city in the Łódź Voivodeship and the second with free public transport. In Tomaszów Mazowiec ...
. It was closed on 16 October 2011 as a part of a major redevelopment project to build a new railway station and transport interchange and reopened on 11 December 2016.


History

Building of the Łódź – Koluszki railway line began on 1 September 1865 when the area was part of
Congress Poland Congress Poland, Congress Kingdom of Poland, or Russian Poland, formally known as the Kingdom of Poland, was a polity created in 1815 by the Congress of Vienna as a semi-autonomous Polish state, a successor to Napoleon's Duchy of Warsaw. It w ...
. Authorization for the construction was obtained from Alexander II in July 1865. The new line linked Łódź with the
Warsaw–Vienna railway The Warsaw-Vienna Railway ( pl, Kolej Warszawsko-Wiedeńska, german: Warschau-Wiener Eisenbahn) was a railway system which operated since 1845 in Congress Poland, then part of the Russian Empire. The main component of its network was a line 327.6 ...
which was finished in 1848. Rails were laid simultaneously from Łódź and from Koluszki. The single-gauge railway line of the factory and Lodz was supposed to serve primarily
freight transport Freight transport, also referred as ''Freight Forwarding'', is the physical process of transporting commodities and merchandise goods and cargo. The term shipping originally referred to transport by sea but in American English, it has been e ...
, in particular for coal and raw materials for the production of machinery. Its hasty launch on 19 November 1865, provided only this function. According to the decisions of the town authorities, two station tracks ended blindly before the Dzika street (presently Sienkiewicza street), where the composition of the coal was established. Passengers of the first goods-passenger trains, launched on 1 June 1866, probably used a provisional barrack between Widzewska St. (now Kilinskiego St.) and Dzika street (the presence of Sienkiewicz St.), however, it was not possible to unambiguously confirm it. the DZFL board's report for 1866 states that the station building in Lodz, as well as other buildings on the line, were finished and put into flight in December of the same year. However, in previous studies, the year 1868 or later years appears as the date of construction of the station. Construction of the railway was the beginning of the creation of the Łódź Circle Line. The track extended almost to ulica Sienkiewicza (Sienkiewicz Street). In 1868 a new station was built designed by the Warsaw-based architect Adolf Schimmelpfennig. The partly two-storey building did not differ from the typical
industrial architecture Industrial architecture is the design and construction of buildings serving industry. Such buildings rose in importance with the Industrial Revolution, starting in Britain, and were some of the pioneering structures of modern architecture. File: ...
of railway stations of that period. In addition to the station at the station, brick buildings were erected: a
warehouse A warehouse is a building for storing goods. Warehouses are used by manufacturers, importers, exporters, wholesalers, transport businesses, customs, etc. They are usually large plain buildings in industrial parks on the outskirts of cities ...
, a
steam engine A steam engine is a heat engine that performs mechanical work using steam as its working fluid. The steam engine uses the force produced by steam pressure to push a piston back and forth inside a cylinder. This pushing force can be trans ...
, a pressure tower, a ramp, a landing, a one-story house and a wooden shed for wagons. Quite accurate plan of the city of Rudolf Micinski, made on the basis of measurements carried out since 1869 and dated on 1873, even shows the course of the tracks: from the main track at the height of Targowa Street outlet left a single-track track, ending with the main track before Dzika Street (nowadays Sienkiewicza Street). In the area of Wodna Street, went to the right ending in front of Widzewska street (nowadays Kilinskiego Street), a track leading to the
engine house __NOTOC__ An engine house is a building or other structure that holds one or more engines. It is often practical to bring engines together for common maintenance, as when train locomotives are brought together. Types of engine houses include: * m ...
, the station and the square next to it. A new station has already been marked on the plan, and in the place of the existing pre-race car park at Kilinskiego St. two small warehouses (one of them is a salt warehouse, another, third warehouse was established in 1871 or 1872 to separate arrivals and sentries). In addition, the plan showed the building of the water station and probably a small engine resemble two machines, but they were not marked leading to a non-runway. A small building, probably residential, is on the set at the exit of Targowa Street. In 1874, the building of the engine house was extended to create two additional positions, and the station was begun to be expanded with a fourth class waiting room. In the years 1875–1876, in order to pass a small steel bridge over the Kielskie street, a small viaduct was built (this is sometimes referred to as a tunnel, this viaduct did not allow the carriage of trucks), which is why in 1912 it was enlarged. It was a typical pedestrian tunnel under the embankment of the Trajmwajowa street. In addition, about 800m of additional tracks were laid, two checkpoints for the
turnstile A turnstile (also called a turnpike, gateline, baffle gate, automated gate, turn gate in some regions) is a form of gate which allows one person to pass at a time. A turnstile can be configured to enforce one-way human traffic. In addition, a t ...
s were erected, a new coal yard and wagons' weight, a cargo ramp and for station employees, a 16-family residential building was erected on Targowa street 1a. In the years 1877–1878, in the area of Zagajnikowa Street (nowadays Kopcinskiego), it was found to the south, along the edge of the copse, a lateral track to the plants of Karl Scheibler, and at the crossing there was a house of the guard, marked on the north side of the tracks. Subsequent plans of the city from the 1880s seemed to ignore the dynamic changes taking place at the station where there was already a large, though only two-wheeled
steam locomotive A steam locomotive is a locomotive that provides the force to move itself and other vehicles by means of the expansion of steam. It is fuelled by burning combustible material (usually coal, oil or, rarely, wood) to heat water in the locomot ...
to six locomotives, adjacent to it a mechanical workshop from Kuznia, erected also in 1880, a three-track, a wooden carriage hall with a 'Vogele' shifter in front of the gates, numerous freight warehouses and exchange offices in the open squares. The station was extended in 1930. In June 2012 the station was demolished to make way for the building of a new station below ground level.


Rebuilding

The modernization of the Łódź – Warsaw line includes building a new station below ground level, just north of the site of the former Łódź Fabryczna station. A ramp, leading to a new tunnel, begins immediately after Łódź Widzew station, and the tunnel itself starts near the site of Łódź Niciarniana station. Initially it was planned to change the name of the station to Łódź-Central or Central, but according to the latest plans, the station name will not change because it is too well associated with the current station. The station was originally envisaged to service new
high-speed trains High-speed rail (HSR) is a type of rail system that runs significantly faster than traditional rail, using an integrated system of specialised rolling stock and dedicated tracks. While there is no single standard that applies worldwide, lines ...
that were to run on a new high-speed line, the 'Y' line, intended to link
Warsaw Warsaw ( pl, Warszawa, ), officially the Capital City of Warsaw,, abbreviation: ''m.st. Warszawa'' is the capital and largest city of Poland. The metropolis stands on the River Vistula in east-central Poland, and its population is officia ...
''via''
Łódź Łódź, also rendered in English as Lodz, is a city in central Poland and a former industrial centre. It is the capital of Łódź Voivodeship, and is located approximately south-west of Warsaw. The city's coat of arms is an example of canti ...
and
Kalisz (The oldest city of Poland) , image_skyline = , image_caption = ''Top:'' Town Hall, Former "Calisia" Piano Factory''Middle:'' Courthouse, "Gołębnik" tenement''Bottom:'' Aerial view of the Kalisz Old Town , image_flag = POL Kalisz flag.svg ...
to
Wrocław Wrocław (; german: Breslau, or . ; Silesian German: ''Brassel'') is a city in southwestern Poland and the largest city in the historical region of Silesia. It lies on the banks of the River Oder in the Silesian Lowlands of Central Europe, rou ...
and
Poznań Poznań () is a city on the River Warta in west-central Poland, within the Greater Poland region. The city is an important cultural and business centre, and one of Poland's most populous regions with many regional customs such as Saint John ...
. Due to the latest estimated cost of 10 billion Euro, the high-speed line was put on hold by
Sławomir Nowak Sławomir Ryszard Nowak (born 11 December 1974 in Gdańsk) is a Polish politician and a state official in Ukraine. He was elected to the Sejm on 25 September 2005, getting 9,061 votes in 25 Gdańsk district as a candidate from the Civic Platfor ...
, the Ministry of Transport, Construction and Marine Economy at the time of the decision. Moving Łódź Fabryczna below ground releases land for development near the city centre. A modern transport interchange is envisaged between PKP trains, MPK Łódź trams, buses and PKS coaches. The railway line is to be extended in a new cross-city twin-track tunnel to
Łódź Kaliska railway station Łódź Kaliska is one of the two main railway stations in the central Polish city of Łódź. It is located west of the center of the city, in the district of Polesie, and it consists of six platforms. The first complex of the station, designed b ...
. In November 2010
PKP PLK PKP Polskie Linie Kolejowe S.A. is the Polish railway infrastructure manager, responsible for maintenance of rail tracks, conducting the trains across the country, scheduling train timetables, and management of railway land. The company was found ...
announced a list of five consortia that had been invited by the railway infrastructure manager to tender to build the underground station. Work was to be completed in 2014. In 2013 the estimated cost of the project was given as ranging from 1.7 to 1.9 billion PLN and the completion date was unknown. Reconstruction works finished in December 2016 and the station has reopened. The main architect of the new station and multimodal hub is Ewelina Oskroba, an architect specializing in stations and transportation. The new station has been designed to be passenger-friendly, with the possibility to accommodate large numbers of travellers commuting between the train station, bus station, tramways and public parking. Although the station is underground, it was designed since the beginning to have plenty of daylight. The station allows a fluid connection between the different sides of the city and does not create any barrier. One of the initial requests was to allow the construction of eight-storey office buildings over the future station.


Gallery

File:New Łódź Fabryczna station, main entrance, oct 2016.jpg, Łódź Fabryczna in 2016 File:Building new Łódź Fabryczna Station in November 2016 02.jpg, Aerial view of the station in 2016 File:Łódź Fabryczna - perony (7).JPG, Interior File:Łódź Fabryczna - hol dworca (2).JPG, Main hall File:Lodz Fabryczna nova (7).jpg, Platforms inside the station


See also

*
Rail transport in Poland The Polish railways network consists of around of track as of 2019, of which is electrified. National electrification system is 3 kV DC. Poland is a member of the International Union of Railways (UIC), its UIC Country Code is 51. Rail ...
*
Transport in Poland Transport in Poland involves air, water, road and rail transportation. The country has a large network of municipal public transport, such as buses, trams and the metro. As a country located at the 'cross-roads' of Europe, Poland, with its highly ...
*
Polish State Railways (''PKP S.A.''; en, Polish State Railways, Inc.) is the dominant railway operator in Poland. The company was founded when the former state-owned enterprise was divided into several units based on the need for separation between infrastructure ...
*
List of busiest railway stations in Poland This is a list of the busiest railway stations in Poland sorted by the average number of passengers boarding daily in 2019, statistics and data are collected by the . List Stations with daily riderships above 4,500 passengers are shown. Refe ...


References


External links

* {{DEFAULTSORT:Lodz Fabryczna Fabryczna Railway stations opened in 1866 Railway stations served by Przewozy Regionalne InterRegio 1866 establishments in the Russian Empire Railway stations served by Łódzka Kolej Aglomeracyjna