HOME
*



picture info

Track Centre
The track spacing is the distance between the track centres of double-track railway lines. There are standard distances derived from the standard loading gauge in a country. For high-speed trains and in tighter curves that distance needs to be increased. The track spacing is also called the ''center-to-center'' spacing to differentiate it from the ''edge-to-center'' spacing of a railway. These two values may be different depending on how signal masts are added to the overall track geometry. Description The distance between the track centres makes a difference in cost and performance of a double-track line. The track centres can be as narrow and as cheap as possible, but maintenance must be done on the side. Signals for bi-directional working cannot be mounted between the tracks so must be mounted on the 'wrong' side of the line or on expensive signal bridges. Track centres are usually wider on high-speed lines, as pressure waves knock each other as high-speed trains pass. Th ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Double-track Railway
A double-track railway usually involves running one track in each direction, compared to a single-track railway where trains in both directions share the same track. Overview In the earliest days of railways in the United Kingdom, most lines were built as double-track because of the difficulty of co-ordinating operations before the invention of the telegraph. The lines also tended to be busy enough to be beyond the capacity of a single track. In the early days the Board of Trade did not consider any single-track railway line to be complete. In the earliest days of railways in the United States most lines were built as single-track for reasons of cost, and very inefficient timetable working systems were used to prevent head-on collisions on single lines. This improved with the development of the telegraph and the train order system. Operation Handedness In any given country, rail traffic generally runs to one side of a double-track line, not always the same side as ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

New South Wales
) , nickname = , image_map = New South Wales in Australia.svg , map_caption = Location of New South Wales in AustraliaCoordinates: , subdivision_type = Country , subdivision_name = Australia , established_title = Before federation , established_date = Colony of New South Wales , established_title2 = Establishment , established_date2 = 26 January 1788 , established_title3 = Responsible government , established_date3 = 6 June 1856 , established_title4 = Federation , established_date4 = 1 January 1901 , named_for = Wales , demonym = , capital = Sydney , largest_city = capital , coordinates = , admin_center = 128 local government areas , admin_center_type = Administration , leader_title1 = Monarch , leader_name1 = Charles III , leader_title2 = Governor , leader_name2 = Margaret Beazley , leader_title3 = Premier , leader_name3 = Dominic Perrottet (Liberal) , national_representation = Parliament of Australia , national_representation_type1 = Senat ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  




2020 Wallan Derailment
On 20 February 2020, a NSW TrainLink XPT passenger train derailed while passing through a turnout at Wallan, Victoria, Australia. Of the 162 total on board, there were two fatalities and 61 passengers were injured, eight of whom sustained serious injuries. The service was running from Sydney to Melbourne and was passing through Wallan. The interim report into the accident indicated that the train had entered the turnout, with a specified speed limit of , at more than . An investigation into the accident is ongoing. Background On 3 February 2020 a vehicle had struck overhead wiring at Wallan, leading to a fire in a signalling hut which caused extensive damage to wiring and affecting signalling on the North East line between Donnybrook and Kilmore East. Trains were signalled through the affected section using Caution Orders. On 6 February, this was changed to using Train Orders, a manual safe-working system. The points at the Wallan Loop were set to the straight ahead positi ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Nuremberg–Erfurt High-speed Railway
The Nuremberg–Erfurt high-speed railway is a German high-speed railway, between Nuremberg and Erfurt. The line is listed in Germany's federal transport plan as ''Verkehrsprojekt Deutsche Einheit Nr.'' ("German Unity transport project no") ''8.1'' and is a section of the high-speed route between Berlin and Munich and a section of the line connecting Italy and Scandinavia in the European Union's Trans-European Rail network. It consists of an upgraded line between Nuremberg and Ebensfeld and a new line between Ebensfeld and Erfurt. The journey time between Erfurt and Nuremberg will be reduced to approximately one hour and 20 minutes after completion. The planning began in 1991 and construction started in April 1996. Three years later construction was stopped by the new SPD-Green coalition government formed after the 1998 election and only recommenced in 2002. The new line was opened at the timetable change on 10 December 2017. The timing of the final commissioning of the upgr ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Erfurt–Leipzig/Halle High-speed Railway
The Erfurt–Leipzig/Halle high-speed railway is a -long high-speed line in Germany between Erfurt and Leipzig and Halle. It is listed in Germany's Federal Transport Plan (''Bundesverkehrswegeplan'') as " German Unity Rail Project no 8.2" (''Verkehrsprojekt Deutsche Einheit Schiene'', VDE 8.2) and is a section of the Munich–Berlin high-speed route, part of the Line 1 of Trans-European Transport Networks (TEN-T) and on the east–west axis between Dresden and Frankfurt. To the north, it connects with the previously completed Berlin-Halle and Leipzig railways (VDE 8.3) and to in the south with the Nuremberg-Erfurt high-speed railway (VDE 8.1), which was opened in December 2017. The travel time from Munich to Berlin has been reduced to about four hours. The design speed is largely , reduced to on the branch to Halle. of the -long high-speed line is located in three tunnels; the six viaducts of the route together are more than long. With a length of approxim ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

San'yō Shinkansen
The is a line of the Japanese Shinkansen high-speed rail network, connecting Shin-Osaka in Osaka with Hakata Station in Fukuoka, the two largest cities in western Japan. Operated by the West Japan Railway Company (JR West), it is a westward continuation of the Tōkaidō Shinkansen and also serves other major cities in between on Honshu and Kyushu islands such as Kobe, Himeji, Okayama, Hiroshima, and Kitakyushu. The Kyushu Shinkansen continues south of Hakata to Kagoshima. The San'yō Shinkansen connects Hakata with Osaka in two and a half hours, with trains operating at a maximum operating speed of for most of the journey Some '' Nozomi'' trains operate continuously on San'yō and Tōkaidō Shinkansen lines, connecting Tokyo and Hakata in five hours. Rolling stock As of March 2020, the following types are used on San'yō Shinkansen services. * 500 series: '' Kodama'' services * 700–7000 series: ''Hikari'' / '' Kodama'' services * N700 series: '' Nozomi'' / ''Hikari'' / '' Ko ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Tōkaidō Shinkansen
The is a Japanese high-speed rail line that is part of the nationwide Shinkansen network. Along with the Sanyo Shinkansen, it forms a continuous high-speed railway through the Taiheiyō Belt, also known as the Tokaido corridor. Opened in 1964, running between Tokyo and Shin-Ōsaka, it is Japan's first high-speed rail line. Along with being the world's oldest high-speed rail line, it is also one of the most heavily used. Since 1987 it has been operated by the Central Japan Railway Company (JR Central), prior to that by Japanese National Railways (JNR). It is also called the Kyoto Express due to other previous services for this high-speed train and operating from Tokyo to Kyoto. There are three types of services on the line: from fastest to slowest, they are the limited-stop '' Nozomi'', the semi-fast ''Hikari'', and the all-stop '' Kodama''. Many ''Nozomi'' and ''Hikari'' trains continue onward to the San'yō Shinkansen, going as far as Fukuoka's Hakata Station. The line was ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


LGV Rhône-Alpes
The LGV Rhône-Alpes (French: ''Ligne à Grande Vitesse''; English: high-speed line) is a French high-speed rail line situated in the Auvergne-Rhône-Alpes region which extends the LGV Sud-Est southwards. Opened to service in 1994, the line bypasses the built-up Lyon area towards the east; in addition it serves Lyon-Saint-Exupéry TGV station (known until June 2000 as Satolas TGV station). Beyond Valence TGV station the line is continued by the LGV Méditerranée. LGVs Rhône-Alpes, Sud-Est and Méditerranée, when completed, received their official nickname, the ''City To Coast (C2C) Highway'' ("Ville à la Mer"). The line was constructed in two sections, north and south. The first section was opened in time for the 1992 Winter Olympics in Albertville. Route The line crosses four departments from north to south: Ain, Rhône, Isère and Drôme. The route of the new line represents a total length of 115 km; 42 km from Montanay to Saint-Quentin-Fallavier, and 73 k ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  




Australian Rail Track Corporation
The Australian Rail Track Corporation (ARTC) is an Australian Government-owned statutory corporation. It operates one of the largest rail networks in the nation spanning 8,500km across five states, 39 worksites and more than 50 First Nations. ARTC continues to expand the network through major infrastructure projects including Inland Rail, which is a new 1,700km freight line between Melbourne and Brisbane via regional Victoria, NSW and Queensland that will complete Australia’s national freight network and better connect producers to markets. History In November 1996, the Australian Government announced a major rail reform package that included the sale of government-owned train operators Australian National and National Rail, and the establishment of ARTC to manage the sections of the interstate rail network which had been controlled by the two former organisations. ARTC was incorporated in February 1998, with operations starting in July 1998 when the lines managed by Austra ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Liverpool And Manchester Railway
The Liverpool and Manchester Railway (L&MR) was the first inter-city railway in the world. It opened on 15 September 1830 between the Lancashire towns of Liverpool and Manchester in England. It was also the first railway to rely exclusively on locomotives driven by steam power, with no horse-drawn traffic permitted at any time; the first to be entirely double track throughout its length; the first to have a true signalling system; the first to be fully timetabled; and the first to carry mail. Trains were hauled by company steam locomotives between the two towns, though private wagons and carriages were allowed. Cable haulage of freight trains was down the steeply-graded Wapping Tunnel to Liverpool Docks from Edge Hill junction. The railway was primarily built to provide faster transport of raw materials, finished goods and passengers between the Port of Liverpool and the cotton mills and factories of Manchester and surrounding towns. Designed and built by George Stephen ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]