TVA Kingston Fossil Plant Coal Fly Ash Slurry Spill
   HOME
*



picture info

TVA Kingston Fossil Plant Coal Fly Ash Slurry Spill
The Kingston Fossil Plant coal fly ash slurry spill was an environmental and industrial disaster that occurred on Monday December 22, 2008, when a dike ruptured at a coal ash pond at the Tennessee Valley Authority's Kingston Fossil Plant in Roane County, Tennessee, releasing of coal fly ash slurry. The coal-fired power plant, located across the Clinch River from the city of Kingston, used a series of ponds to store and dewater the fly ash, a byproduct of coal combustion. The spill released a slurry of fly ash and water, which traveled across the Emory River and its Swan Pond embayment, onto the opposite shore, covering up to of the surrounding land. The spill damaged multiple homes and flowed into nearby waterways including the Emory River and Clinch River, both tributaries of the Tennessee River. It was the largest industrial spill in United States history. The initial spill, which resulted in millions of dollars worth of property damages and rendered many proper ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  




Kingston Fossil Plant
Kingston Fossil Plant, commonly known as Kingston Steam Plant, is a 1.4-gigawatt (1,398 MW) coal-fired power plant located in Roane County, just outside Kingston, Tennessee on the shore of Watts Bar Lake. It is operated by the Tennessee Valley Authority. The plant is known for the Kingston Fossil Plant fly ash spill which occurred in December 2008. History Construction of the Kingston Fossil Plant began on April 30, 1951. It was the largest coal-fired power plant in the world when completed in 1955. It was built primarily to provide electricity for the nearby Oak Ridge National Laboratory. A dedication ceremony for the plant took place on November 17, 1955. The plant is a popular site for birdwatchers, as many waterfowl come to the settling and treatment ponds nearby. The plant has nine generating units: Units 1–4, rated at 175 MW each (launched into service in 1954), and Units 5–9, rated at 200 MW each (launched in 1955). Combined, the plant has a total capacity of 1,700 M ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  



MORE