Ouvrage Kobenbusch
   HOME
*



picture info

Ouvrage Kobenbusch
Ouvrage du Kobenbusch is a ''gros ouvrage'' of the Maginot Line, located in the Fortified Sector of Thionville in the Cattenom Forest. It possesses seven combat blocks and two entrance blocks, one for ammunition and the other for men. It is located between ''petit ouvrage'' Bois-Karre and ''petit ouvrage'' Oberheid, and was named for the surrounding Kobenbusch Forest. The position saw little action during World War II. Its deep passages have been flooded by the construction of a cooling water lake for a nearby nuclear power plant, but its surface features are being developed with an interpretive path through the surrounding forest. Design and construction The Kobenbusch position forms the point of the Cattenom salient, where the east-west defensive line turns to the south. The site was surveyed by CORF (''Commission d'Organisation des Régions Fortifiées''), the Maginot Line's design and construction agency, in 1930. Work by the contractor Verdun-Fortifications began in 19 ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Maginot Line
The Maginot Line (french: Ligne Maginot, ), named after the French Minister of War André Maginot, is a line of concrete fortifications, obstacles and weapon installations built by France in the 1930s to deter invasion by Germany and force them to move around the fortifications. The Maginot Line was impervious to most forms of attack. In consequence, the Germans invaded through the Low Countries in 1940, passing it to the north. The line, which was supposed to be fully extended further towards the west to avoid such an occurrence, was finally scaled back in response to demands from Belgium. Indeed, Belgium feared it would be sacrificed in the event of another German invasion. The line has since become a metaphor for expensive efforts that offer a false sense of security. Constructed on the French side of its borders with Italy, Switzerland, Germany, Luxembourg and Belgium, the line did not extend to the English Channel. French strategy therefore envisioned a move into Belgium ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  




JM Cloche
The JM cloche is an element of the Maginot Line. It is a non-retractable non-rotating cupola of steel alloy like GFM cloches, but are armed with twin heavy machine guns, as opposed to the lighter automatic rifles associated with the GFM. There are 179 JM cloches on the Maginot Line. JM is an acronym for ''Jumelage de Mitrailleuses'' (twin machine guns). While the MAC 31 heavy machine guns were of the same caliber (7.5mm) as those in GFM cloches, they had a longer practical range and a maximum range of , with a 500 round per minute rate of fire.Mary, Tome 2, page 109 Description The JM cloche closely resembles the GFM cloche in size and construction. It exists in three versions, all designed Model 1930: small, large and two-man. JM cloches had a single firing port, which was flanked on either side by trapezoidal observation ports. The blank rear was frequently backed by a concrete-covered embankment, which provided additional cover and reduced the prominence of the cloche. AM ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Atlantic Wall
The Atlantic Wall (german: link=no, Atlantikwall) was an extensive system of coastal defences and fortifications built by Nazi Germany between 1942 and 1944 along the coast of continental Europe and Scandinavia as a defence against an anticipated Allied invasion of Nazi-occupied Europe from the United Kingdom, during World War II. The manning and operation of the Atlantic Wall was administratively overseen by the German Army, with some support from ''Luftwaffe'' ground forces. The ''Kriegsmarine'' (German Navy) maintained a separate coastal defence network, organised into a number of sea defence zones. Hitler ordered the construction of the fortifications in 1942 through his Führer Directive No. 40. More than half a million French workers were drafted to build it. The wall was frequently mentioned in Nazi propaganda, where its size and strength were usually exaggerated. The fortifications included colossal coastal guns, batteries, mortars, and artillery, and thousands o ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Siegfried Line
The Siegfried Line, known in German as the ''Westwall'', was a German defensive line built during the 1930s (started 1936) opposite the French Maginot Line. It stretched more than ; from Kleve on the border with the Netherlands, along the western border of Nazi Germany, to the town of Weil am Rhein on the border with Switzerland – and featured more than 18,000 bunkers, tunnels and tank traps. From September 1944 to March 1945 the Siegfried Line was subjected to a large-scale Allied offensive. Name The official name for the German defensive line construction program before and during the Second World War that collectively came to be known as the "Westwall" (and "Siegfried Line", or sometimes "West Wall", in English) changed several times during the late 1930s reflecting areas of progress. * Border Watch programme (pioneering programme) for the most advanced positions (1938) * Limes Programme (1938) * Western Air Defense Zone (1938) * Aachen–Saar Programme (1939) * Ge ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


List Of Maginot Line Ouvrages
Here is the list of all ''ouvrages'' of the Maginot Line, organized by sector and type of fortification. ''Ouvrage'' translates as "works" in English: published documents in both English and French refer to these fortifications in this manner, rather than as "forts". An ''ouvrage'' typically consists of a series of concrete-encased strongpoints, linked by tunnels. For a list of the ''ouvrages'' of the Alpine Line, or Little Maginot Line, see List of Alpine Line ouvrages. Belgian border Fortified Sector of Flanders Fortified Sector of Lille Fortified Sector of the Escaut Ouvrage * Ouvrage d'Eth Casemates * Casemate de Tallandier * Casemate de Jeanlain * Casemate de Notre Dame d'Amour * Casemate du Mont des Bruyères * Casemate de la Ferme des Rosières * Casemate de Marlières * Casemate de Haute Rive * Casemate de Drève St Antoine * Casemate de Lièvre Ouest * Casemate de Lièvre Est * Casemate de Trieux d'Escaupont Ouest * Casemate de Trieux d'Escaup ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Ouvrage Galgenberg
Ouvrage Galgenberg forms a portion of the Fortified Sector of Thionville of the Maginot Line. It is situated in the Cattenom Forest, near the ''gros ouvrage'' Kobenbusch and ''petit ouvrage'' Oberheid. The ''ouvrage'' was tasked with controlling the Moselle Valley and as such was called the "Guardian of the Moselle." Galgenberg did not see significant action in 1940 or 1944. After a period of reserve duty in the 1950s and 1960s, it was deactivated. It is now a museum. Design and construction The Galgenberg site was surveyed by the Commission d'Organisation des Régions Fortifiées (CORF), the Maginot Line's design and construction agency, in 1930. Work began the next year,Mary, Tome 3, p. 95 and the position became operational in 1935,Kaufmann 2006, p. 25 at a cost of 48 million francs. The contractor was Verdun-Fortifications.Mary, Tome 1, p. 52 The site occupies the heights of the Galgenberg. ''Ouvrage'' Sentzich is close by the side of the Galgenberg ''massif'', ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


Ouvrage Sentzich
Ouvrage Sentzich is part of the Fortified Sector of Thionville of the Maginot Line. The ''petit ouvrage'' for infantry is located to the south of ''gros ouvrage'' Galgenberg, on the edge of the main road to Luxembourg near the village of Sentzich. ''Gros ouvrage'' Métrich is to the east. As a small work, it was not considered for use after World War II and was abandoned. It is secured, but is not open to the public. Design and construction The Sentzich site was approved by CORF (''Commission d'Organisation des Régions Fortifiées''), the Maginot Line's design and construction agency, in February 1930 and construction by contractor Verdun-Fortifications started the same year. The construction cost was 7.5 million francs.Mary, Tome 1, p. 52 Description The single infantry block possessed two firing chambers and one machine gun turret. The north chamber was equipped for a machine gun/ 37 mm anti-tank gun combination (JM/AC37), and was surmounted by an automatic rifle cloch ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Électricité De France
Électricité de France S.A. (literally ''Electricity of France''), commonly known as EDF, is a French multinational electric utility company, largely owned by the French state. Headquartered in Paris, with €71.2 billion in revenues in 2016, EDF operates a diverse portfolio of at least 120 gigawatts of generation capacity in Europe, South America, North America, Asia, the Middle East, and Africa. In 2009, EDF was the world's largest producer of electricity. Its 56 active nuclear reactors (in France) are spread out over 18 sites (nuclear power plants). They comprise 32 reactors of 900 MWe, 20 reactors of 1,300 MWe, and 4 reactors of 1,450 MWe, all PWRs. EDF was created on 8 April 1946 by the 1945 parliament, from the merging of various divided actors. EDF led France's post-war energy growth, with a unique focus on civil nuclear energy, through reconstruction and further industrialization within the Trente Glorieuse, being a fleuron of France's new industrial landscape ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Saar (river)
The Saar (; french: Sarre ) is a river in northeastern France and western Germany, and a right tributary of the Moselle. It rises in the Vosges mountains on the border of Alsace and Lorraine and flows northwards into the Moselle near Trier. It has two headstreams (the ''Sarre Rouge'' and ''Sarre Blanche'', which join in Lorquin), that both start near Mont Donon, the highest peak of the northern Vosges. After (129 kilometres; 80 miles in France and on the French-German border, and 117 kilometres; 73 miles in Germany) the Saar flows into the Moselle at Konz (Rhineland-Palatinate) between Trier and the Luxembourg border. It has a catchment area of . The Saar flows through the following departments of France, states of Germany and towns: * Moselle (F): Abreschviller (Sarre Rouge), Lorquin, Sarrebourg, Fénétrange *Bas-Rhin (F): Sarre-Union * Moselle (F): Sarralbe, Sarreguemines *Saarland (D): Saarbrücken, Völklingen, Wadgassen, Bous, Saarlouis, Dillingen, Merz ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Meuse (river)
The Meuse ( , , , ; wa, Moûze ) or Maas ( , ; li, Maos or ) is a major European river, rising in France and flowing through Belgium and the Netherlands before draining into the North Sea from the Rhine–Meuse–Scheldt delta. It has a total length of . History From 1301 the upper Meuse roughly marked the western border of the Holy Roman Empire with the Kingdom of France, after Count Henry III of Bar had to receive the western part of the County of Bar (''Barrois mouvant'') as a French fief from the hands of King Philip IV. In 1408, a Burgundian army led by John the Fearless went to the aid of John III against the citizens of Liège, who were in open revolt. After the battle which saw the men from Liège defeated, John ordered the drowning in the Meuse of suspicious burghers and noblemen in Liège. The border remained stable until the annexation of the Three Bishoprics Metz, Toul and Verdun by King Henry II in 1552 and the occupation of the Duchy of Lorraine by the ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  




LG Cloche
The LG cloche was a defensive element common to many Maginot Line ''ouvrages''. The fixed cupola was deeply embedded into the concrete on top of a combat block, with only the top surface visible. The opening permitted the ejection of grenades from the interior of the cloche, providing a means of close defense against enemy troops on top of the bunker. 75 units were installed in the Maginot Line. LG refers to ''Lance-Grenade'' (grenade launcher). Unlike other cloches such as the GFM or the JM, the LG cloche was effectively "blind", possessing a single shuttered orifice in diameter in its flat crown. It had no observation ports at all, as it did not project appreciably above the surrounding surface. The LG cloche came in three models: a small version, high, a large version, and a cloche for two persons, tall. All were in diameter. LG cloches were usually found in the vicinity of an entrance block. The LG cloche was armed with a grenade launcher that could fire at an angle f ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]