GWR 5600 Class
   HOME
*



picture info

GWR 5600 Class
The GWR 5600 Class is a class of 0-6-2T steam locomotive built between 1924 and 1928. They were designed by Charles Collett for the Great Western Railway (GWR), and were introduced into traffic in 1924. After the 1923 grouping, Swindon inherited a large and variable collection of locomotives from historic Welsh railway companies, which did not fit into their standardisation programme. GWR boiler inspectors arrived en masse and either condemned the original locomotives or had them rebuilt. The systematic destruction of many examples of locomotives, most still in serviceable condition, followed, but various were worked alongside 5600 Class. Two hundred GWR 5600 Class replacement locomotives were built and remained in service until withdrawn by British Railways between 1962 and 1965. Nine of the class have survived into preservation. Background: Welsh 0-6-2T types The railways of South Wales seem to have had a particular liking for the 0-6-2T type. This was because the nature ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  




Frederick Warne & Co
Frederick Warne & Co. is a British publisher founded in 1865. It is known for children's books, particularly those of Beatrix Potter, and for its Observer's Books. Warne is an imprint of Penguin Random House, a subsidiary of German media conglomerate Bertelsmann. History Frederick Warne & Co. was founded in July 1865 by London bookseller and publisher, Frederick Warne. The business was one successor to Routledge, Warne, Routledge (thus from 1858), the publishing partnership of Warne with his brother-in-law George Routledge and the eldest of Routledge's sons. The other successor was George Routledge & Sons.Imminent termination of the partnership and succession by Routledge was reported in "Literary Gossip", ''The London Review'', 17 June 1865, p. 646. "On the 30th of the present month the partnership hitherto subsisting between Mr. George Routledge, Mr. F. Warne, and Mr. R. W. Routledge, will terminate. After that date, business will be carried on by the Mess ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


Alexandra (Newport And South Wales) Docks And Railway
The Alexandra (Newport and South Wales) Docks and Railway (ADR) was a company formed in 1882 from the former Newport Dock Company of 1865. There was considerable demand for dock accommodation in Newport, South Wales, chiefly for the export or coastal transport of iron ore and coal. The Newport Dock Company had built an earlier dock that was now outgrown. Changing demand, particularly for blending coal, created a need to bring coal to Newport from the Taff and Cynon valleys, and the Pontypridd, Caerphilly and Newport Railway was formed to build the line; nominally independent, it shared many directors and major shareholders. It opened in 1884, and was absorbed by the ADR in 1897. Prior to 1914 the Alexandra Docks were superlative in the world in terms of water area within the docks and ability to handle large vessels. The decline of the mineral extractive industries of South Wales resulted in a corresponding decline of activity by the ADR and its successor owners. However it i ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Locomotives Of The Great Western Railway
The first Locomotives of the Great Western Railway (GWR) were specified by Isambard Kingdom Brunel but Daniel Gooch was soon appointed as the railway's Locomotive Superintendent. He designed several different broad gauge types for the growing railway, such as the Firefly and later Iron Duke Class 2-2-2s. In 1864 Gooch was succeeded by Joseph Armstrong who brought his standard gauge experience to the workshops at Swindon. To replace some of the earlier locomotives, he put broad gauge wheels on his standard gauge locomotives and from this time on all locomotives were given numbers, including the broad gauge ones that had previously carried just names. Joseph Armstrong's early death in 1877 meant that the next phase of motive power design was the responsibility of William Dean, his assistant and successor. Dean went on to develop express 4-4-0 types, but the familiar 4-6-0s of later years were initially introduced by the next engineer, George Jackson Churchward. He was also res ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Taff Vale Railway O2 Class
The Taff Vale Railway O2 class was a class of 0-6-2T steam tank locomotives designed by Tom Hurry Riches and introduced to the Taff Vale Railway in 1899. Numbering Withdrawal and disposal All were withdrawn from traffic between 1926 and 1928. One locomotive, GWR 426 (TVR 85) was sold to the National Coal Board and used at their Philadelphia Colliery, numbered 52. It was subsequently saved for preservation, and is based at the Keighley and Worth Valley Railway The Keighley & Worth Valley Railway is a heritage railway line in the Worth Valley, West Yorkshire, England, which runs from Keighley to Oxenhope. It connects to the National Rail network at Keighley railway station. History Inception .... It was restored to original Taff Vale condition in 2000, although the paintwork didn't receive any lining out, and ran on a regular basis until 2009 when its boiler ticket expired. Due to its popularity and good condition, it received a further overhaul which was completed ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Taff Vale Railway O1 Class
The Taff Vale Railway (TVR) O1 class was a class consisting of fourteen 0-6-2T steam tank locomotives, designed by Tom Hurry Riches, which were introduced to the TVR during the period 1894-1897. Numbering Withdrawal and disposal All were withdrawn from traffic between 1925 and 1931. Locomotive 28 Locomotive No. 28 is the last surviving Welsh-built standard gauge locomotive. It began its TVR career working the mineral and coal trains from collieries to port. By 1922 when the Great Western Railway had taken control, it had run 483,189 miles, and by 1923 was given a major overhaul, receiving a new boiler from the West Yard Works. Absorbed into the GWR fleet, No. 28 was renumbered No. 450, and given a GWR-style cover over its safety valve, its external design was unchanged. It was withdrawn from service on 30 October 1926, but was found to be in good mechanical condition and sold to the Government in 1927, for use on the Woolmer Military Instructional Railway, later called the ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Taper Boiler
A fire-tube boiler is a type of boiler in which hot gases pass from a fire through one or more tubes running through a sealed container of water. The heat of the gases is transferred through the walls of the tubes by thermal conduction, heating the water and ultimately creating steam. The fire-tube boiler developed as the third of the four major historical types of boilers: low-pressure tank or "haystack" boilers, flued boilers with one or two large flues, fire-tube boilers with many small tubes, and high-pressure water-tube boilers. Their advantage over flued boilers with a single large flue is that the many small tubes offer far greater heating surface area for the same overall boiler volume. The general construction is as a tank of water penetrated by tubes that carry the hot flue gases from the fire. The tank is usually cylindrical for the most part—being the strongest practical shape for a pressurized container—and this cylindrical tank may be either horizontal or verti ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


Remanufacturing
Remanufacturing is "the rebuilding of a product to specifications of the original manufactured product using a combination of reused, repaired and new parts". It requires the repair or replacement of worn out or obsolete components and modules. Parts subject to degradation affecting the performance or the expected life of the whole are replaced. Remanufacturing is a form of a product recovery process that differs from other recovery processes in its completeness: a remanufactured machine should match the same customer expectation as new machines. In 1995, the United States Environmental Protection Agency (EPA) implemented the Comprehensive Procurement Guideline (CPG) program to promote waste reduction and resource conservation through the use of materials recovered from solid waste, and to ensure that the materials collected in recycling programs will be used again in the manufacture of new products. The EPA is required to designate products that are or can be made with recovered ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Taff Vale Railway
The Taff Vale Railway (TVR) was a standard gauge railway in South Wales, built by the Taff Vale Railway Company to serve the iron and coal industries around Merthyr Tydfil and to connect them with docks in Cardiff. It was opened in stages in 1840 and 1841. In the railway's first years, the coal mining industries expanded considerably and branches were soon opened in the Rhondda valleys and the Cynon Valley. The conveyance of coal for export and for transport away from South Wales began to dominate and the docks in Cardiff and the approach railway became extremely congested. Alternatives were sought and competing railway companies were encouraged to enter the trade. In the following decades further branch lines were built and the TVR used " motor cars" (steam railway passenger coaches) from 1903 to encourage local passenger travel. From 1922 the TVR was a constituent of the new Great Western Railway (GWR) at the grouping of the railways, imposing its own character ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Rhymney Railway
The Rhymney Railway was a railway company in South Wales, founded to transport minerals and materials to and from collieries and ironworks in the Rhymney Valley of South Wales, and to docks in Cardiff. It opened a main line in 1858, and a limited passenger service was operated in addition. The first line was dependent on the cooperation of the parallel Taff Vale Railway (TVR) for part of the transit, and this relationship was uneasy; the Rhymney Railway built an independent line to Cardiff in 1871. Better relations were created with the London and North Western Railway (LNWR), and later the Great Western Railway (GWR), and two important joint lines with the GWR were built: the Taff Bargoed line (1876) and the Quakers Yard and Merthyr Joint line (1882). Although the Rhymney Railway network was never large, it was remarkably profitable, and paid excellent dividends for most of its life. Dependent on mineral traffic for its own success, it declined in the 1970s, but the main line ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Rhondda And Swansea Bay Railway
The Rhondda and Swansea Bay Railway was a Welsh railway company formed to connect the upper end of the Rhondda Fawr with Swansea, with the chief objective of transporting coal and other minerals to Swansea docks. It was incorporated in 1882, but at first the connection to Swansea from Briton Ferry was refused. The construction required the formation of the Rhondda Tunnel, nearly long through difficult geological conditions, but the line opened from Treherbert through the tunnel to Port Talbot and Aberavon in 1890. Authorisation to extend to Swansea, and also Neath, was secured and those lines opened in 1894 (goods) and 1895. The line suffered operational challenges and was never greatly profitable, but it arranged for the Great Western Railway to operate the line and guarantee good dividends from 1906. The GWR incorporated the line's infrastructure in widening its own lines at Court Sart and at Swansea docks. As it was heavily dependent on coal mining activity, the line decline ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Port Talbot Railway And Docks Company
The Port Talbot Railway and Docks Company (PTR&D) was formed in 1894 to secure the means of bringing minerals, chiefly coal, to the harbour in South Wales. It took over the docks at Port Talbot that had been operated by the Port Talbot Company. It opened its main line in 1897 and reached a connection with the Great Western Railway Garw Valley line the following year. A branch line to collieries near Tonmawr also opened in 1898. The lines were extremely steeply graded and operation was difficult and expensive, but the company was successful. Passenger operation on the main line started in 1898, but this was never a principal part of the business. For some time most of the passenger train service was operated by a railmotor that was the largest ever to work in the United Kingdom. Also in 1898 the Ogmore Valleys Extension (OVE) line, a part of the PTR&D, was opened. It had been projected as a defensive measure against competitive incursion, and it led from Margam Junction towards Tond ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Neath And Brecon Railway
The Dulas Valley Mineral Railway was incorporated in 1862 to bring coal from the Onllwyn area north-east of Neath to the quays there, and in the following year was reconstituted as the Neath and Brecon Railway. The line was opened as far as Onllwyn in 1863. The directors allowed a contractor John Dickson a free hand in building the line and when he became bankrupt the company was in a desperate financial situation. Nevertheless, the line was completed to Brecon in 1867, and an offshoot to connect with the Swansea Vale Railway, giving better access to Swansea, was ready in 1873. The larger Midland Railway acquired rights over the line and ran a heavy mineral train service for many years, although the remote and difficult course of the line was expensive to operate. After the 1922 "Grouping" of the railways, a pooling agreement led to the diversion of the heavy traffic to routes that were easier to work over, and the line reverted to a quiet and remote rural line. The passenger se ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]