Rublyovo-Arkhangelskaya line (Russian: Рублёво-Архангельская линия) (Line 17, Graphite line) is a line of the Moscow Metro. The first section of the line, between Delovoy Tsentr and Bulvar Generala Karbysheva, was opened on 5 September 2026. This first section incorporated two stations, Delovoy Tsentr and Shelepikha, which were originally part of Bolshaya Koltsevaya line. The construction began in 2021 and is planned to end after 2028, opening in three phases. Originally, Phase 1 was scheduled to be completed by 2026–2027 constructing the section from Delovoy Tsentr to Lipovaya Roscha, and phase two is scheduled to open after 2028 expanding the line from Lipovaya Roshcha to Novorizhskaya station. In the future, it will be connected with the Biryulyovskaya line and will extend up to the city of Krasnogorsk in 2030.