Platform gap fillers were tried on the platforms of Lo Wu station on the East Rail line in 2009 due to the difficulty of installing platform screen doors on the curved nature of the platforms. They were planned to be installed at other stations along the line along with signal upgrades. However, during the trial period, MTR found that the time taken for the gap filler to fully extend took 15-20 seconds and so greatly increased dwell times of trains. It was decided unsuitable for service. After the trial period ended in October 2009, the platform gap fillers were not used until it was finally removed during a platform-strengthening maintenance operation. Plans to install it on other stations of the East Rail line were also abandoned.