Topic summary

New Delhi–Jaipur main line

New Delhi–Jaipur main line
28
Palam Vihar Halt
32
Gurgaon
36
Basai Dhankot
SH 15A
42
Garhi HansaruSultanpur Kailawas 49
SH 15A
KMP ExpresswayKMP Expressway
50
Patli Farrukh Nagar 53
53
Taj Nagar
56
Jataula Jori Sampka
62
Pataudi Road
66
Inchhapuri
SH 26
73
Khalilpur
76
Kumbhawas Mundhalia Dabri
NH352-IN.svgNH 352
to Rewari–Rohtak line
SH 26
to Bathinda–Rewari line
83
Rewari
to Bikaner–Rewari lineto Merta Road–Rewari line
NH11-IN.svgNH 11
SH 15
86
Rewari Anaj Mandi
91
Karnawas
NH48-IN.svgNH 48
98
Bawal
105
Majri Nangal
111
Ajaraka
117
Khanpur Ahir
123
Harsauli
131
Khairtal
138
Ghatla
144
Parisal
SH 14
to Alwar–Kathgodam line
158
Alwar
SH 14
NH248A-IN.svgNH 248A
164
Mahwa
SH 25
175
Malakhera
185
Dhigawara
SH 25
192
Rajgarh
SH 25A
198
Surergoth
204
Baswa
210
Gulana
to Bandikui–Bharatpur Branch line
216
Bandikui
SH 25
222
Arnia
228
Kolvagram
235
Bhan Kari
Banganga River
NH21-IN.svgNH 21
245/0
DausaSH 2
10
Baniyana NH148-IN.svgNH 148
20
Nangal Rajwatan Bhandana 253
31
Araniya Kalan Salempura Jatwara 257
36
Deedwana Banskho 265
NH148-IN.svgNH 148Jhir 267
44
Lalsot Bassi 274
NH23-IN.svgNH 23Kanauta 283
49
Binauri Khatipura 290
56
Mandawari Getor Jagatpura 296
NH23-IN.svgNH 23NH248-IN.svgNH 248
70
Pipali Jaipur Gandhinagar 301
75
Bamanwas to Jaipur–Sawai Madhopur line
83
Khuntla Jaipur Metro Pink Line
89
Udai Kalan Jaipur 307
SH 25 to Merta Road–Rewari line
SH 1 to Jaipur–Ahmedabad line
NH23-IN.svgNH 23
97
Gangapur City
on Mathura–Vadodara section
Sources:Google Maps, New Delhi Shakurbasti EMU via Safdarjung,
Delhi Sarai Rohilla Jaipur AC Double Decker Express,
Tilak Bridge Bulandshahr MEMU,
Garhi Harsaru Farrukh Nagar DEMU,

The New Delhi–Jaipur main line connects New Delhi, the capital of India with Jaipur, the capital of Rajasthan. Further it is linked with the Jaipur–Ahmedabad main line and the Mumbai–Ahmedabad main line.

There are about 30 trains connecting Delhi to Jaipur, fastest one, CDG – AII Vande Bharat taking 3 hours 32 minutes. and ADI – SJ Rajdhani taking 3 hours 50 minutes.

The route also faces delays in normal running during winter period because of fog. Throughout the route, there are two parallel railway lines running, helping in swift movement of trains without any delays.