Topic summary

NLEX Connector

NLEX Connector

NLEX Connector (North Luzon Expressway Connector) is a 7.7-kilometer (4.8 mi), four-lane elevated expressway in Metro Manila, Philippines. It connects the NLEX Harbor Link to the Metro Manila Skyway, which connects further to the North and South Luzon Expressways. The highway traverses parallel to the PNR Metro Commuter Line. It has five interchanges, four of which are currently operational. Alongside NLEX Harbor Link, trucks are allowed to use it.

Construction began in 2019, and the connector was partially opened in March 2023. Its remaining section up to Santa Mesa is under construction and expected to be completed in 2026.