Topic summary
Madrid–Málaga high-speed rail line

Los Mochos Junction
5.8
Río Guadalquivir
7.7
La Marota
8.8
La Marota
11.6
Guadalmazar
25.6
34.6
37.8
Arroyo del Salado
43.5
Río Cabra
50.2
Ingeniero
54.9
Río Genil
61.4
75.3
Río Yeguas
89.2
93.1
Sierra Humilladero Tunnel
96.6
97.7
100.4
Guadalhorce River
106.6
Gobantes Tunnel
110.8
118.4
Arroyo Piedras
121.4
Alora
122.5
Arroyo Espinazo
123.4
Arroyo Jevar
125.0
Alora
126.5
El Espartal Tunnel
128.2
Tevilla Tunnel
130.4
Gibralmora Tunnel
133.3
Cártama Tunnel
135.4
viaduct
149.5
152.8
Málaga tunnel
154.5
km
The Madrid–Málaga high-speed rail line is a standard gaugeHigh-speed rail line of 512 km (318 mi) in length that links the city of Madrid with the city of Málaga in Spain. The line was inaugurated on 24 December 2007. At the time the service opened, Renfe Operadora was running 22 trains daily between Madrid and Málaga.