Topic summary

ICE 3M

Extracted from the Wikipedia article ICE 3.

Operations

As in Belgium, licensing procedures for France took five years to be completed. In Switzerland, licensing took only six months. Trial runs were completed in late 2005 and the same two problems were encountered as in Belgium: loose gravel damage and possible side-effects of the brakes. ICE 3Ms were allowed on the LGV Est and started service there on 20 June 2007, mixed with TGVs. Since December 2007, DB operates ICE 3M trains from Frankfurt central station to Paris Est, initially with five daily runs between both cities. The six trains for running into France (designated ICE-3 MF, indicating multisystem France) were modified at Bombardier's Hennigsdorf plant and were extensively tested on Siemens' test site in Wegberg-Wildenrath before the modified trains re-entered commercial service. Despite this, the "French" subset of six class 406 trains have suffered from reliability problems, so that some Paris–Frankfurt services are operated instead by French TGVs (currently TGV 2N2 'Euroduplex' as of 2015) under the "Alleo" joint venture between DB and SNCF.