Topic summary
Hamgyong Line

Sentetsu Hoeryeong Colliery Line
623.6
585.5
Sentetsu Musan Line
573.0
branch to Gangdeok Line
Sentetsu Gangdeok Line
opened 1 Dec 1941
Sentetsu Gilhye Line
397.2
321.1
312.5
281.0
Sentetsu Chaho Line
267.1
263.8
Sentetsu Cheolsan Line
241.3
Sentetsu Bukcheong Line
141.9
139.3
123.9
54.4
42.0
Sentetsu Pyeongwon line to Pyongyang
20.0
0.0
Sentetsu Gyeongwon Line to Gyeongseong
The Hamgyeong line was a railway line of the Chosen Government Railway (Sentetsu) in Japanese-occupied Korea, running from Wonsan to Sangsambong. Construction began in 1914, and was completed in 1928. The line is now entirely within North Korea; the Korean State Railway has divided it between the Kangwŏn Line (Wonsan−Kowon section), the P'yŏngra Line (Kowon−Cheongjin section), the Kangdŏk Line (−Suseong), and the Hambuk Line (Chongjin−Sangsambong section).