Topic summary

Great Western Main Line

Great Western Main Line
0
London Paddington
Paddington Goods
Royal Oak ()
Mileage Yard Goods & Coal
Subway Junction
Westbourne Park ()
Portobello Junction
Notting Hill Sidings
Kensal Green Gasworks siding
West London Junction
Old Oak Common Goods
Old Oak West Junction
Willesden & Acton Brick Co. siding
4¼
Acton Main Line
5¾
Ealing Broadway
6½
West Ealing
7¼
Hanwell
9
Southall
11
Hayes & Harlington
14
West Drayton
14¾
Iver
16¼
Langley
18½
Slough
21
Burnham
22½
Taplow
24¼
Maidenhead
31
Twyford
Reading East Junction
36
Reading
38¾
Tilehurst
41½
Pangbourne
44¾
Goring & Streatley
Moulsford
48½
Cholsey
53
Didcot Parkway
Didcot Railway Centre
Steventon
Wantage Road
Challow
Uffington
77¼
Swindon
Dauntsey
Christian Malford Halt
94
Chippenham
Thingley Junction
Corsham
Box (Mill Lane) Halt
Box
Bathford Halt
Bathampton Junction
Bathampton
Hampton Row Halt
107
Bath Spa
108
Oldfield Park
Twerton-on-Avon
Twerton Tunnel
Saltford Tunnel
Saltford
113¾
Keynsham
St Anne's Park No 3 Tunnel
St Anne's Park No 2 Tunnel
St Anne's Park
North Somerset Junction
116½
Bristol Temple Meads
Bristol West Junction
Temple Meads Goods

The Great Western Main Line (GWML) is a main linerailway in England that runs between London Paddington and Bristol Temple Meads. It connects to other main lines such as those from Reading to Penzance and Swindon to Swansea. The GWML is presently a part of the national rail system managed by Network Rail, while the majority of passenger services upon it are provided by the current Great Western Railway franchise.

The GWML was built by the original Great Western Railway company between 1838 and 1841, as a dual track line in the 7 ft (2,134 mm) broad gauge. The broad gauge remained in use until 1892, after which standard gauge track has been exclusively used. Between 1877 and 1932, many sections of the GWML were widened to four tracks. During 1908, Automatic Train Control (ATC) was introduced as a safety measure. In 1948, the Great Western Railway, and thus the GWML, was merged into the Western Region of British Railways.

During the 1970s, the GWML was upgraded to support higher line speeds, as a result of which many sections permitted 125 mph (201 km/h) operations, enabling the newly introduced InterCity 125 high speed train (HST) to make faster journeys. British Rail proposed widespread electrification of the line in the late 1970s, although this was not speedily implemented. During the mid-1990s, a stretch of the GWML between London Paddington and Hayes & Harlington was electrified using 25 kV AC overhead lines for the Heathrow Express. Further, although not total, electrification was carried out during the 2010s; this permitted the replacement of diesel-powered trains such as the InterCity 125 and Class 180 with electric and bi-mode train sets such as the Hitachi Super Express high speed trains, specifically the Class 800 and Class 802. Due to budget overruns, the British government deferred electrification of the section through Bath Spa from Royal Wootton Bassett to Bristol in 2016.

The route includes dozens of listed buildings and structures, including tunnel portals, bridges and viaducts, stations, and associated hotels. Presently, the GWML is electrified between London Paddington and Royal Wootton Bassett. In the long term, Network Rail plans to install European Rail Traffic Management System (ERTMS) in-cab signalling across the entire line.