Topic summary

Drammen Line

Drammen Line
0.27
Oslo Central
1854
3,632
1.40
Nationaltheatret
1980
2.29
Elisenberg
(1980)
(0.00)
Oslo West
(1.58)
Filipstad
1989
(1.90)
Skarpsno
1882
3.00
freight line to Skøyen
3.38
Skøyen
1872
4.31
Bestun
1884
County boundary
6.02
Lysaker
1872
2011
7.30
Myra
1931
7.96
Stabekk
1884
8.74
Strand
1931
9.74
Høvik
1874
10.40
Ramstad
1931
11.27
Blommenholm
1910
13.19
Sandvika
1872
planned
2005
14.42
Jong
1959
14.84
Slependen
1873
Billingstad tunnel
372
16.72
Billingstad
1919
Åstad tunnel
106
Solhaug tunnel
253
Solstad tunnel
19.25
Hvalstad
1872
Hvalstad tunnel
Hvalstad tunnel
144
20.32
Vakås
1957
21.37
Høn
1930
Asker tunnel
410
23.16
Asker
1872
10,723
Lier
1973
Brakerøya
1873
546
Holmen Port
451
Tollbukaia
Drammen
1866

The Drammen Line (Norwegian: Drammenbanen) is a 52.86-kilometre (32.85 mi) railway line between Oslo and Drammen, Norway, which was opened on 7 October 1872. It serves all trains west of Oslo Central Station and is owned by Bane NOR.

The line opened as a 1,067 mm (3 ft 6 in) narrow gauge railway, and was rebuilt to standard gauge between 1913 and 1922. In 1922, it became the first line on the national network to be electrified. The Lieråsen Tunnel shortened the line in 1973, and in 1980 the Oslo Tunnel was built, allowing the line to connect to the new Oslo Central Station. The Asker Line runs parallel to the Drammen Line, mostly in tunnels.

At Drammen, the Vestfold Line branches off to the south while the Bergen Line and the Sørlandet Line continue together to Hokksund along the Randsfjorden Line. The entire line has double track due to the heavy traffic on the line. The longest Norwegian railway bridge is just before Drammen where the line crosses the Drammen river. That bridge is 454 metres long.