Topic summary
Brussels Metro line 3

Line 3 is an expansion of the Brussels Metro, currently under construction as of July 2023. It will run from Albert, through the existing premetro (underground tram) tunnel, and eventually terminate at Bordet.
Topic summary

Line 3 is an expansion of the Brussels Metro, currently under construction as of July 2023. It will run from Albert, through the existing premetro (underground tram) tunnel, and eventually terminate at Bordet.