Phase two (2021–2024): Anfield Road End redevelopment
The second phase of Anfield's redevelopment was to redevelop the Anfield Road stand. The club received initial outline planning permission in 2014 for the redevelopment, with seating to be increased by 4,825, giving Anfield a total capacity of 58,000. However, in August 2019, Liverpool allowed the planning permission associated with the original 2014 designs to lapse, confirming their intention to submit "ambitious new plans" for the Anfield Road End redevelopment which are believed to increase the capacity further to take the overall capacity of Anfield above 60,000. The redevelopment focused on the upper tier of the stand, with the lower tier remaining unchanged. Construction work was completed behind the existing stand and then connected to the lower tier, which was expected to be in the 2022 off-season. Anfield's capacity was not expected to be affected throughout the duration of the works.