Weißig–Böhla Railway
   HOME

TheInfoList



OR:

The Weißig–Böhla railway is a two-track, electrified main line in the German state of
Saxony Saxony, officially the Free State of Saxony, is a landlocked state of Germany, bordering the states of Brandenburg, Saxony-Anhalt, Thuringia, and Bavaria, as well as the countries of Poland and the Czech Republic. Its capital is Dresden, and ...
. It passes through an area near
Großenhain Großenhain (; also written as Grossenhain; , ) is a Große Kreisstadt (German for major district town) in the district of Meissen, Saxony, Germany. It was originally known as Hayne. The current name simply means "big Hayne". History Großenhain ...
called the ''Großenhainer Pflege'' and connects the Leipzig–Dresden and Berlin–Dresden railways, running between Leckwitz junction near Weißig and Kottewitz junction near Böhla. Its official opening took place after two years of construction on 3 December 2010 and the operations of regular trains started at the timetable change on 12 December 2010. The project was built part of the second stage of German Unity Transport Project (''Verkehrsprojekts Deutsche Einheit'') No. 9, which also includes the upgrade of the line between
Riesa Riesa (; ) is a town in the district of Meißen in Saxony, Germany. It is located on the river Elbe, approximately northwest of Dresden. History The name ''Riesa'' is derived from Slavic ''Riezowe''. This name, romanised as "Rezoa", appears f ...
and Röderau junction and between Dresden-Neustadt and Coswig. As part of the project, long-distance services between Leipzig and Dresden will be able to run at up to speed of up to 200 km/h over large parts of the line. When the project is finished a travel time of 45 minutes will be possible between the two cities.


Route

At the beginning of the line in Leckwitz near Weißig, it separates at grade from the Leipzig-Dresden railway line, which at this point has four tracks, each suitable for operations at 130 km/h (2,500 m radius). From there, the line runs for 7.425 kilometres north of Strießen, Priestewitz and Kottewitz through the Großenhainer Pflege. North of Priestewitz the line crosses the
Großenhain–Priestewitz railway The Großenhain–Priestewitz railway is a single-track electrified main line in the German state of Saxony, which was originally built by the Großenhain Branch Railway Company (''Zweig-Eisenbahngesellschaft zu Großenhain''). It runs from Groà ...
and east of Kottewitz it connects at a grade-separated junction with the Dresden–
Elsterwerda Elsterwerda (; Lower Sorbian: ''Wikow'') is a town in the Elbe-Elster district, in southwestern Brandenburg, Germany. It is situated on the Black Elster river, 48 km northwest of Dresden, and 11 km southeast of Bad Liebenwerda. Histor ...
(Berlin–Dresden) line, which is designed for speeds of 200 km/h (6,000/7,000 m radius). The track running from Dresden to Leipzig is carried on a 160 m long
flying junction A flying junction or flyover is a railway junction at which one or more diverging or converging tracks in a multiple-track route cross other tracks on the route by bridge to avoid conflict with other train movements. A more technical term is "gr ...
over the Berlin–Dresden line. In its course, the line also crosses national highway 101 and has a total of six railway bridges. The embankments have a height of up to 9 m.


History

Prior to
German reunification German reunification () was the process of re-establishing Germany as a single sovereign state, which began on 9 November 1989 and culminated on 3 October 1990 with the dissolution of the East Germany, German Democratic Republic and the int ...
, there were proposals for a connection between the two lines. The Federal Transport Infrastructure Plan (''Bundesverkehrswegeplan'') of 1992 initially provided for an upgrade of both the Berlin–Dresden and the Dresden–Leipzig railways for high speed. As part of the preliminary design of 1992/1993, it was planned that the line from Leipzig to Dresden would run to the south of Riesa and cross the existing line at Medessen and connect to the route from Berlin at Böhla. After optimisation, the section of new line starting at Riesa was discarded. Instead, there would be now only be the 13 km long section between Böhla and Radebeul on the Berlin–Dresden railway to be upgraded for high speeds and a new link to be built with the Leipzig–Dresden railway. This would allow about 370 million
marks Marks may refer to: Business * Mark's, a Canadian retail chain * Marks & Spencer, a British retail chain * Collective trade marks A collective trademark, collective trade mark, or collective mark is a trademark owned by an organization (such ...
to be saved, the effects on nature and landscape would be significantly reduced and fast and slow traffic would be separated. (13-page brochure) According to information provided by
Deutsche Bahn (, ; abbreviated as DB or DB AG ) is the national railway company of Germany, and a state-owned enterprise under the control of the German government. Headquartered in the Bahntower in Berlin, it is a joint-stock company ( AG). DB was fou ...
in 2008, the connecting curve would be the most economical solution to segregate long-distance and regional traffic by concentrating long-distance transport on the fast line to the Dresden node, while the slower traffic would remain on the existing line. Furthermore, it would separate long-distance and S-Bahn traffic between Dresden-Neustadt and Coswig. An investigation of the link between the two lines was commissioned on 8 January 1993. In March 1993, the preliminary design for a link between Neumedessen (Leipzig–Dresden railway) and Böhla (Berlin–Dresden railway), including the Kockelsberg Tunnel, was confirmed. With planning expected to be completed in December 1995, it would be possible for the project to be implemented between mid-1998 and early 2000. The project would allow fast and slow traffic to be segregated on its approach to the Dresden railway mode. Since this section of the Berlin–Dresden railway was not used for regional services, it would in future be used only for long-distance passenger and fast freight traffic. In addition, the segregation of traffic would relieve the Coswig railway node of long-distance rail transport and permit the intensification of the regular-interval S-Bahn services to Meissen.


Planning

The joint planning process for the Riesa southern bypass and the connecting curve did not initially proceed. In March 1995 the Riesa southern bypass was removed from the plan. In May 1995, documents prepared for the regional planning process for the connection provided for a new section of line to be straightened in the area of the Kockelsberge (hills). Originally the construction of the whole of the VDE no. 9 project was delayed until 1999 due to the absence of funding, but funds were provided for the construction of the connecting curve. Tenders were originally called in 2001, but initially archaeological excavations had to be carried out before construction could start. Tenders were called again in 2008, with completion in 2011 specified. Overall, the project comprised five construction lots. The plan involved the building of 17 bridges and culverts and 7 km embankment. The line speed was set as 160 km/h with provision for a further upgrade to 200 km/h. (2 page data sheet) Currently, the route is only protected by
Punktförmige Zugbeeinflussung PZB or Indusi is an intermittent cab signalling system and train protection system used in Germany, Austria, Slovenia, Croatia, Romania, Israel, Serbia, on two lines in Hungary, on the Tyne and Wear Metro in the United Kingdom, UK, and formerly ...
(PZB) train control.


Construction and opening

Before the start of the actual construction, excavations were carried out in 2002 under the direction of the State Office of Archaeology. The remains of ancient settlements were protected along the planned route. Jewelry from the Roman Iron Age were found along with shards and wooden posts that suggested the floor plans of former houses. The actual start of construction on the first construction lot occurred in 2008. The project was divided into two sub-sections: *phase 1 included the construction of Leckwitz junction (around March–December 2009) and the establishment of new rail infrastructure (between September 2009 and May 2010); *phase 2 included the establishment of Kottewitz junction (between December 2009 and December 2010), the establishment of
electronic interlocking In railway signalling, an interlocking is an arrangement of signal apparatus that prevents conflicting movements through an arrangement of tracks such as junction (rail), junctions or crossings. In North America, a set of signalling appliances a ...
s in Weißig and Böhla and land restoration. The railway embankment was largely completed over a length of around 5.5 km by early December 2009. The construction of the last section, including the connection to the Berlin–Dresden line, was carried out during a full closure of the Großenhain–Radebeul-Naundorf section for one year from mid-December 2009. The line was opened on 3 December 2010 and full services were commenced at the timetable change on 12 December 2010.


Cost

The total cost of the line, including the planning costs, amounted to €89.3 million. About €3 million of this was spent by December 2008 for land acquisition and the selection of the site for the flying junction.


Technology

Leckwitz junction is controlled from the ESTW-Z class electronic control centre at Priestewitz and an ESTW-A electronic control centre in Weißig. A second dispatcher's workstation was activated in the Priestewitz electronic control centre. The points at the junction with the Berlin–Dresden railway is controlled by the Kottewitz ESTW-A electronic control centre, which is in the Böhla station area. The
cant CANT may refer to: *CANT, a solo project from Grizzly Bear bass guitarist and producer, Chris Taylor. *Cantieri Aeronautici e Navali Triestini CANT (''Cantieri Aeronautici e Navali Triestini'', the Trieste Shipbuilding and Naval Aeronautics; also ...
is up to 100 mm.


References


External links

* {{DEFAULTSORT:Weissig-Boehla railway Railway lines in Saxony Railway lines opened in 2010 2010 establishments in Germany Buildings and structures in Meissen (district)