Sokolovská Pánev
   HOME

TheInfoList



OR:

Florenc () is a major interchange station on the
Prague Metro The Prague Metro () is the rapid transit network of Prague, Czech Republic. Founded in 1974, the system consists of three lines (Line A (Prague Metro), A, Line B (Prague Metro), B and Line C (Prague Metro), C) serving 61 stationsCounting the thre ...
system, located beneath the busy Florenc intersection. It serves as a transfer point between Line B and Line C, each with its own platform and structural design. The station opened in 1974 for Line C (then known as ''Sokolovská'' until 1990), and in 1985 for Line B.


Line B station

The Line B station is a three-aisle, column-type structure with an elevated central nave. It lies 39 meters underground, deeper than the Line C platform. It features 23 pairs of cross-passages and was constructed between 1977 and 1985 at a cost of 560 million
Czechoslovak crown The Czechoslovak koruna (in Czech and Slovak: ''koruna československá'', at times ''koruna česko-slovenská''; ''koruna'' means ''crown'') was the currency of Czechoslovakia from 10 April 1919 to 14 March 1939, and from 1 November 1945 to 7 ...
s. It initially served as the terminus of Line B until the 1990 extension. The interior is clad in ceramic tiles in brown and beige tones. The transfer tunnel to Line C departs from the eastern end of the central nave and consists of two connected escalator tunnels. It connects perpendicularly to the Line C platform via a deep four-flight escalator. Although a western exit to Na Poříčí street was planned, it was never completed. The station was made accessible in 2006 with two elevators: one from the bridge in the transfer corridor, and the other from the corridor to the surface at Na Florenci and Na Poříčí streets. A ventilation shaft for Line B is located near the bus terminal next to the Wilsonova flyover.


2002 Flooding

In 2002, Florenc was flooded during the major Vltava River flood. Two metro trains of type 81-71 stored at the station could not be evacuated and were later rebuilt into 81-71M units at Škoda Transportation in Plzeň. During renovations in 2002–2003, the station's original cylindrical light fixtures were removed and replaced with copper suspended ceilings.


Line C station

Opened in 1974, the Line C station is a cut-and-cover structure with no internal columns and a ceiling of prefabricated concrete beams. A concourse above the platform connects both exits. The platform is clad in marble and granite from Liberec, and escalators lead down to the transfer corridor to Line B. The platform lies at a depth of 9.35 meters. There are two exits: * A southern exit by stairs to the Florenc bus terminal. * A northern exit via a three-flight escalator, built in 1985, leading to a shared vestibule with Line B. The connecting corridor features slate and red phyllite from Železný Brod. Construction lasted from 1969 to 1974 and cost 210 million crowns. The station served as the northern terminus of Line C until the 1984 extension to Nádraží Holešovice. The old bus terminal was partially demolished during construction. A diaphragm wall method was used (10,570 m² of panels), with a roof slab built on top, followed by excavation of 130,100 m³ of material. The station used 29,400 m³ of concrete. The tunnel boring machine ''Pavel'' was turned around at the station, and the transfer corridor to Line B was built under the platform. Until 1978, no sidings existed north of the station. Trains reversed via a crossover before the station, and the track bed uses ballast—unusual in the Prague Metro.


Vestibules

Florenc has two main vestibules: * The northern vestibule is a five-level structure located in
Karlín Karlín () is a cadastral area of Prague, part of Prague 8 municipal district, formerly an independent town (which became part of Prague in 1922). It is bordered by the river Vltava and Holešovice to the north, Vítkov hill and Žižkov to t ...
. Several buildings were demolished for its construction in the 1980s. It includes a supermarket and connects to tram stops. After the 2002 flood, it was modified for mobile flood barriers. * The southern vestibule is subsurface and connects to the Florenc bus terminal and nearby streets in Karlín.


Inter-line connection

A single-track tunnel connects Lines B and C for depot transfers. The tunnel runs from Line B (before Florenc westbound) to Line C (after Florenc southeast-bound), allowing trains to transfer without reversing. Before the 1994 opening of the Line B depot at Zličín, trains were often towed to the Kačerov depot on Line C. Part of the lower tunnel was used for reversing Line B trains when Florenc was a terminus. The tunnel runs under the site of the modern
Hilton Hotel Hilton Hotels & Resorts (formerly known as Hilton Hotels) is a global brand of full-service hotels and resorts and the flagship brand of American multinational hospitality company Hilton Worldwide. The original company was founded by Conrad Hi ...
.


See also

* Florenc bus station


External links


Dopravní podnik Praha (Official website)


Prague Metro stations Railway stations opened in 1974 Railway stations opened in 1985 1974 establishments in Czechoslovakia 1985 establishments in Czechoslovakia


References

{{Authority control Prague Metro stations Railway stations in the Czech Republic opened in 1974