Santo Antônio Dam
   HOME

TheInfoList



OR:

The Santo Antônio Dam is a
hydroelectric dam Hydroelectricity, or hydroelectric power, is Electricity generation, electricity generated from hydropower (water power). Hydropower supplies 15% of the world's electricity, almost 4,210 TWh in 2023, which is more than all other Renewable energ ...
on the
Madeira River The Madeira River ( ) is a major waterway in South America. It is estimated to be in length, while the Madeira-Mamoré is estimated near or in length depending on the measuring party and their methods. The Madeira is the biggest tributary of ...
southwest of
Porto Velho Porto Velho (, ''Old Port'') is the capital (political), capital of the Brazilian States of Brazil, state of Rondônia, in the upper Amazon River basin. The population is 460,434 people (as of the Brazilian Institute of Geography and Statistics, ...
in the state of Rondônia,
Brazil Brazil, officially the Federative Republic of Brazil, is the largest country in South America. It is the world's List of countries and dependencies by area, fifth-largest country by area and the List of countries and dependencies by population ...
. The dam's
run-of-the-river Run-of-river hydroelectricity (ROR) or run-of-the-river hydroelectricity is a type of hydroelectric generation plant whereby little or no water storage is provided. Run-of-the-river power plants may have no water storage at all or a limited amou ...
hydroelectric power station has 50 turbines, each rated at 71.6 MW resulting in a total
installed capacity Nameplate capacity, also known as the rated capacity, nominal capacity, installed capacity, maximum effect or gross capacity,Rio Madeira HVDC system. The dam is part of a planned four power plant Madeira river hydroelectric complex, which will consist of two dams in Brazil (Santo Antônio and 3,750 MW Jirau Dam about 100 km upstream), a third on the border of Brazil and Bolivia (Guayaramerin), and a fourth station inside Bolivia (Cachuela Esperanza). Santo Antonio and Jirau Dam are operating, while the smaller upstream dams are still in the planning stages. In part due to the 2001-2002 power shortage in Brazil, construction of both dams was accelerated in 2009. The total estimated cost of the two facilities currently under construction is $15.6 billion ($7 billion for Santo Antônio), including about $10 billion for the civil engineering and power plants, and $5 billion for ship locks, transmission lines, and environmental re-mediation. The Madeira river hydroelectric complex is part of the
Initiative for the Integration of the Regional Infrastructure of South America The Initiative for the Integration of the Regional Infrastructure of South America (IIRSA) is a development plan to link South America's economies through new transportation, energy, and telecommunications projects. IIRSA investments are expected t ...
, an effort by South American governments to integrate the continent's infrastructure with new investments in transportation, energy, and communication.


Design

The Santo Antônio Dam is designed as a run-of-the-river hydroelectric dam, power plant, and factory. The dam itself is tall and long, creating a reservoir with a surface area of , of which is the previously existing river channel. The dam's power plant consists of 50 Kaplan-bulb turbines, each capable of 71.6MW (total installed capacity of 3,580 MW) divided into four sets. The original project called for 44 turbines, but this was expanded in 2013. The power plant have a maximum discharge of . The dam have two
spillway A spillway is a structure used to provide the controlled release of water downstream from a dam or levee, typically into the riverbed of the dammed river itself. In the United Kingdom, they may be known as overflow channels. Spillways ensure tha ...
s; one on the main section and an auxiliary on the southern abutment. Both spillways have a combined maximum discharge of to control reservoir levels. The dam also supports two
fish ladder A fish ladder, also known as a fishway, fish pass, fish steps, or fish cannon, is a structure on or around artificial and natural barriers (such as dams, locks and waterfalls) to facilitate diadromous fishes' natural migration as well as mov ...
s and a shipping lock.


Impacts

Brazilian law requires water impoundments to undergo a very thorough approval process to ensure that each project meets environmental, social, political safety criteria. However, critics of the Jirau and Santo Antonio dam claim that many legal criteria were rubber-stamped before all questions from impacted groups had been addressed. The dam's social impacts received the majority of substantive criticism (see below). However, environmental groups noted that the fast track approval for the Madeira dams sets a dangerous precedent. Brazilian law allows for expedited licensing for eco-friendly projects described by the Worldwatch institute as "kindler, gentler dams with smaller reservoirs, designed to lessen social and environmental impacts." The Worldwatch institute insists that no project should "fast-track the licensing of new dams in Amazonia and allow projects to circumvent Brazil's tough environmental laws".


Social

The most frequent objection is that the dam builders failed to adequately consult with indigenous peoples, as required by law. The Brazilian government indigenous protection foundation
FUNAI is a Japanese consumer electronics company headquartered in Daitō, Osaka. Currently, it is in liquidation. Apart from producing its own branded electronic products, it was also an OEM providing assembled televisions and video players/recor ...
predicts that there may be un-contacted indigenous populations in the region that will be affected by the Madeira complex. Most of the affected populations are nearest to the Jirau dam. Other issues related with traditional Amazonian fishermen and little peasants, who are suffering with constant floodings, which, according to them, is caused by the dam.


Environmental

Because both the Jirau and Santo Antonio dams are run-of-the-river projects, neither dam impounds a large reservoir. Both dams also feature significant environmental re-mediation efforts. As a consequence, there has not been strong environmental opposition to the implementation of the Madeira river complex. However, critics point out that if the fish ladders fail, "several valuable migratory fish species could suffer near-extinction as a result of the Madeira dams." The strictly protected Serra dos Três Irmãos Ecological Station was reduced in size from to in September 2011 to allow for the dam's reservoir.


Opportunities for Bolivia

Bolivia has been a
landlocked country A landlocked country is a country that has no territory connected to an ocean or whose coastlines lie solely on endorheic basins. Currently, there are 44 landlocked countries, two of them doubly landlocked (Liechtenstein and Uzbekistan), and t ...
since it lost its coastline to
Chile Chile, officially the Republic of Chile, is a country in western South America. It is the southernmost country in the world and the closest to Antarctica, stretching along a narrow strip of land between the Andes, Andes Mountains and the Paci ...
in the
war of the pacific The War of the Pacific (), also known by War of the Pacific#Etymology, multiple other names, was a war between Chile and a Treaty of Defensive Alliance (Bolivia–Peru), Bolivian–Peruvian alliance from 1879 to 1884. Fought over Atacama Desert ...
in 1884. Many Bolivians feel a deep and lasting bitterness due to this loss, and the Bolivian military continues to build and maintain an open ocean navy in
Lake Titicaca Lake Titicaca (; ; ) is a large freshwater lake in the Andes mountains on the border of Bolivia and Peru. It is often called the highest navigable lake in the world. Titicaca is the largest lake in South America, both in terms of the volume of ...
, awaiting an eventual recovery of access to the sea. The Madeira river complex presents an opportunity for Bolivia because all of the hydroelectric dams would feature
ship locks A lock is a device used for raising and lowering boats, ships and other watercraft between stretches of water of different levels on river and canal waterways. The distinguishing feature of a lock is a chamber in a permanently fixed position i ...
capable of raising and lowering oceangoing vessels. If the project is completed, "more than 4,000 km of waterways upstream from the dams in Brazil, Bolivia, and
Peru Peru, officially the Republic of Peru, is a country in western South America. It is bordered in the north by Ecuador and Colombia, in the east by Brazil, in the southeast by Bolivia, in the south by Chile, and in the south and west by the Pac ...
would become navigable." Hence, if the project is completed, both Bolivian commercial vessels and the Bolivian navy would have access to the open ocean, and lucrative sea lanes, for the first time in 120 years.


See also

*
List of power stations in Brazil The following page lists the power stations in Brazil. Coal Gas and oil fired Gas turbines Internal combustion engines Nuclear Hydroelectric Solar Wind See also * Electricity sector in Brazil * Energy policy ...

Jirau and Santo Antônio: tales of an Amazonian war (video documentary)


References

{{DEFAULTSORT:Santo Antonio Dam Dams completed in 2012 Energy infrastructure completed in 2012 Dams in Rondônia Hydroelectric power stations in Brazil Run-of-the-river power stations Dams with fish ladders