Ride Description
After the 4 person boats are loaded, they slide off the loading conveyor into the channel, where they make a gradual left-hand turn into the first tunnel, which crosses under the lift hill. After emerging from the tunnel, boats turn right and meander along, before turning right into the second tunnel. After emerging, boats make a left-hand turn, followed by a 180 degree turnaround onto the lift hill. As the boats ascend, the familiar click-clack of the anti-slide back device is heard. At the top, boats descend the drop, passing through anReferences