A predetermined motion time system (PMTS) is frequently used to perform labor minute costing in order to set piece-rates, wage-rates or incentives in labor oriented industries by quantifying the amount of time required to perform specific tasks under defined conditions. Today the PMTS is mainly used in work measurement for shorter cycles in labour oriented industries such as apparel and footwear. This topic comes under wider
industrial and production engineering
Industrial and production engineering (IPE) is an interdisciplinary engineering discipline that includes manufacturing technology, engineering sciences, management science, and optimization of complex Process (engineering), processes, systems, or o ...
.
One of such a system is known as "work factor" and more popular
methods-time measurement
Methods-Time Measurement (MTM) is a predetermined motion time system that is used primarily in industrial settings to analyze the methods used to perform any manual operation or task and, as a product of that analysis, to set the standard time in w ...
(MTM), released in 1948 exist today in several variations and used in some commercial applications.
New legislation in developed markets following sustainability issues, Living Wage movement and the
2013 disaster in Rana Plaza, Bangladesh have brought labor costing and standards back to the focus of activists and global fashion retailers.
Occupational safety and health
Occupational safety and health (OSH) or occupational health and safety (OHS) is a multidisciplinary field concerned with the safety, health, and welfare of people at work (i.e., while performing duties required by one's occupation). OSH is re ...
(OSH, OHS),
ergonomics
Ergonomics, also known as human factors or human factors engineering (HFE), is the application of Psychology, psychological and Physiology, physiological principles to the engineering and design of products, processes, and systems. Primary goa ...
, skills development and job satisfaction are some of the other factors influenced by
Labor Standards Act (Japan).
Predetermined motion time standard, predetermined time standards, and predetermined time systems (PTS) are other terms that describe same concept by different authors. Main outcome of PMTS application is quantifying labor inputs in terms of SMV (Standard Minute Value) or SAM (Stranded Allocated Minute).
TMU
Most predetermined motion time systems (MTM and MOST) use time measurement units (TMU) instead of seconds for measuring time. One TMU is defined to be 0.00001
hour
An hour (symbol: h; also abbreviated hr) is a unit of time historically reckoned as of a day and defined contemporarily as exactly 3,600 seconds ( SI). There are 60 minutes in an hour, and 24 hours in a day.
The hour was initially establis ...
s, or 0.036
second
The second (symbol: s) is a unit of time derived from the division of the day first into 24 hours, then to 60 minutes, and finally to 60 seconds each (24 × 60 × 60 = 86400). The current and formal definition in the International System of U ...
s according to MTM100 and 0.0000083 hours, or 0.030 seconds according to BS100. These smaller units allow for more accurate calculations without the use of decimals. In the most in-depth PMT systems, motions observed will be on the level of individual TMUs, like toss (3 TMUs in MiniMOST) and simple pick-up (2 TMUs in MTM-1). More general systems simplify things by grouping individual elements, and thus have larger time values – for example, a bend and arise (61 TMUs in MTM-2) and one or two steps (30 TMUs in BasicMOST). Systems with even less detail work with TMU values in the hundreds, like climbing 10 rungs on a ladder (300 TMUs in MaxiMOST) or passing through a door (100 TMUs in MaxiMOST).
The choice of which variation of a certain PMTS to use is dependent on the need for accuracy in contrast to the need for quick analysis, as well as the length of the operation, the distances involved in the operation, and the repetitiveness of the operation. Longer operations often take place on a larger spatial scale, and tend to be less repetitive, so these issues are often treated as one. For longer, less repetitive operations, statistical analysis demonstrates that the accuracy of less detailed systems will generally approach the accuracy of more detailed systems. Thus, in order to reduce the time required for analysis, less detailed systems (like MTM-B and MaxiMOST) are usually used when possible. Conversely, very short, repetitive processes are commonly analyzed with more exact methods like MTM-1 and MiniMOST because of the need for accuracy.
ILO and Manchester University research on GSD, MODAPTS & SewEasy
Manchester University researchers including Doug Miller, has gone deep into uses of PMTS in apparel labour costing in "Towards Sustainable Labour Costing in UK Fashion Retail". Doug says "...work measurement for arriving at a standard time should normally make provision for relaxation, contingency and special allowances." According to the International Labour Organization (ILO), as of 1992 there were some 200 different PTS systems.
Canadian Apparel Federation, CAF
As the supply chain delays or disruptions keep many apparel executives on edge at regular intervals, especially with the ever shortening life cycle of
fast fashion
Fast fashion is the business model of replicating recent catwalk trends and High fashion, high-fashion designs, mass production, mass-producing them at a low cost, and bringing them to retail quickly while demand is at its highest. The term ''fast ...
CAF explored how PMTS weigh in their fashion value chain by conducting series of programs including an awareness WEBINAR on SewEasy PMTS software systems, based on MTM standard.
Fair Wear Foundation, FWF
Fair Wear Foundation, a non-profit whose mission is to see a world where the garment industry supports workers in realizing their rights to safe, dignified, properly paid employment used the SewEasy PMTS approach to formulate the country wise, living wage adjustment known as labour minute costing calculators.
[https://www.fairwear.org/resources-and-tools/labour-minute-costing-calculators, bench-marked upon MTM.]
See also
Closely related manufacturing improvement methodologies:
*
Toyota Production System
The Toyota Production System (TPS) is an integrated socio-technical system, developed by Toyota, that comprises its management philosophy and practices. The TPS is a management system that organizes manufacturing and logistics for the automobile ...
*
Theory of constraints
The theory of constraints (TOC) is a management paradigm that views any manageable system as being limited in achieving more of its goals by a very small number of constraints. There is always at least one constraint, and TOC uses a focusing p ...
*
Time and motion study
A time and motion study (or time–motion study) is a business efficiency technique combining the ''time study'' work of Frederick Winslow Taylor with the ''motion study'' work of Frank and Lillian Gilbreth (the same couple as is best known t ...
*
Value-stream mapping
Modern concepts and related terminology:
*
Production levelling
*
Takt time
*
Direct labor cost
Notes
References
*Zandin, Kjell B (2003). ''MOST Work Measurement Systems''.
New York
New York most commonly refers to:
* New York (state), a state in the northeastern United States
* New York City, the most populous city in the United States, located in the state of New York
New York may also refer to:
Places United Kingdom
* ...
: Marcel Dekker.
*Miller, Doug, Towards Sustainable Labour Costing in UK Fashion Retail (February 5, 2013). Available at SSRN: {{doi, 10.2139/ssrn.2212100
Time and motion study
Clothing industry