Phénix (French for
phoenix) was a small-scale (gross 264/net 233 MW
e) prototype
fast breeder reactor
A breeder reactor is a nuclear reactor that generates more fissile material than it consumes. These reactors can be Nuclear fuel, fueled with more-commonly available isotopes of uranium and Isotopes of thorium, thorium, such as uranium-238 and t ...
, located at the
Marcoule nuclear site, near
Orange, France. It was a
pool-type liquid-metal fast breeder reactor cooled with liquid
sodium
Sodium is a chemical element; it has Symbol (chemistry), symbol Na (from Neo-Latin ) and atomic number 11. It is a soft, silvery-white, highly reactive metal. Sodium is an alkali metal, being in group 1 element, group 1 of the peri ...
. It generated 590 MW of thermal power, and had a breeding ratio of 1.16 (16% more
plutonium
Plutonium is a chemical element; it has symbol Pu and atomic number 94. It is a silvery-gray actinide metal that tarnishes when exposed to air, and forms a dull coating when oxidized. The element normally exhibits six allotropes and four ...
produced than consumed), but normally had to be stopped for refueling operations every two months. Phénix continued operating after the closure of the subsequent full-scale prototype
Superphénix in 1997. After 2004, its main use was investigation of
transmutation of
nuclear waste
Radioactive waste is a type of hazardous waste that contains radioactive material. It is a result of many activities, including nuclear medicine, nuclear research, nuclear power generation, nuclear decommissioning, rare-earth mining, and nuclear ...
while also generating some electricity. Phénix was shut down in 2009.
[''PHENIX''](_blank)
The
decommissioning project started in 2005. Between 2009 and 2011, the non-nuclear equipment and turbine hall were dismantled. The decommissioning license was expected for 2015.
[''Phenix Nuclear Power Plant Dismantling Start''](_blank)
CEA, 9 Jan 2015 Finalising of the decommissioning process is expected between 2031 and 2043.
[''Demantelement de la centrale Phenix''](_blank)
CEA, 14 March 2013 (French)
History

Construction of Phénix began in November 1968. The first connection to the French national electricity grid was in December 1973.
[
Plans for a French fast reactor date as far back as 1958's '' Rapsodie'', and followed up in 1964 for a larger design with a power output of 1 GWe. Construction of the Rapsodie facility started in 1962 and went critical on 28 January 1967. It did not have power producing systems, but its 22 MW of thermal output (MWth) would translate to perhaps 9 MW of electrical output (MWe). Experiments on core configurations were carried out in the ''Masurca'' facility starting in 1966, and design of a larger power-producing facility was already well underway.
During the 1960s, interest in ]nuclear power
Nuclear power is the use of nuclear reactions to produce electricity. Nuclear power can be obtained from nuclear fission, nuclear decay and nuclear fusion reactions. Presently, the vast majority of electricity from nuclear power is produced by ...
was reaching a crescendo. For France, with little uranium
Uranium is a chemical element; it has chemical symbol, symbol U and atomic number 92. It is a silvery-grey metal in the actinide series of the periodic table. A uranium atom has 92 protons and 92 electrons, of which 6 are valence electrons. Ura ...
supply of their own, large scale generation would be subject to supply constraints, especially given that nuclear power was experiencing a boom in construction that suggested the available supply would be limited even on a worldwide basis. In France's plans, breeders would serve the twin purposes of producing fuel for their conventional light water reactor fleet, as well as producing that fuel from the waste fuel from those reactors, thereby reducing the amount of nuclear waste
Radioactive waste is a type of hazardous waste that contains radioactive material. It is a result of many activities, including nuclear medicine, nuclear research, nuclear power generation, nuclear decommissioning, rare-earth mining, and nuclear ...
they would have to dispose of. Only a small number of breeders, estimated to be around 20, would be required to fuel the fleet of about 200 light water reactors.
France began construction of the Phénix demonstration plant in November 1968, only a year after Rapsodie went critical. It was fueled with 931 kg of highly enriched plutonium, around 77% Pu-239. The fuel load is capable of running for about 90 days maximum, but in practice it normally ran for two month periods. Due to its design, refueling required the reactor to be shut down. As a result, it had a low capacity factor
The net capacity factor is the unitless ratio of actual electrical energy output over a given period of time to the theoretical maximum electrical energy output over that period. The theoretical maximum energy output of a given installation is def ...
(CF), on the order of 65%. As a prototype plant, a high CF was not a design goal, although any practical design would have to improve this. Phénix demonstrated a breeding ratio of 1.16, meaning it produced 16% more fuel than it consumed, while also producing 233 MWe in normal operation.
Phénix ran without problems through the 1970s and '80s, but in the early 1990s it began to demonstrate a number of unexplained behaviours, including large power transients. This had serious safety implications, and the reactor was repeatedly shut down, spending most of the period from 1991 to 1994 being studied while offline. The long offline period required it to be recertified, so the plant also underwent a significant refurbishment between 1994 and 2002. It was finally recertified in June 2003, but only at a reduced power of 130 MWe.
References
External links
Summary of key parameters
moved. IArchive has it -->
Phénix FBR
(drawing)
{{DEFAULTSORT:Phenix
Former nuclear power stations in France
Nuclear technology in France
Liquid metal fast reactors