The Pagidipalli–Nallapadu section is an
electrified
Electrification is the process of powering by electricity and, in many contexts, the introduction of such power by changing over from an earlier power source.
The broad meaning of the term, such as in the history of technology, economic histor ...
single track railway section in
Guntur railway division
Guntur Railway Division is one of the three divisions of the South Coast Railway zone of Indian Railways. The division was sanctioned in 1995–96 and was fully operational on 1 April 2003, with its headquarters at Guntur. The ''Rail Vikas Bhava ...
of
South Central Railway
The South Central Railway (abbreviated SCR) is one of the 19 zones of Indian Railways. The jurisdiction of the zone is spread over the states of Telangana, Maharashtra, Karnataka, Andhra Pradesh. It has three divisions under its administrat ...
.
History
The Guntur–Macherla section was opened in 1930. A new railway line from Bibinagar to was started in 1974 and foundation stone was laid by then Prime minister of India
Indira Gandhi on 7 April 1974 and opened for traffic in 1989 there by making connectivity between and .
Route
This route starts from (near
Bibinagar) and passes through
Nalgonda
Nalgonda is a city and municipality in the Indian state of Telangana. It is the headquarters of the Nalgonda district, as well as the headquarters of the Nalgonda mandal in the Nalgonda revenue division. It is located about from the sta ...
,
Miryalaguda, ,
Piduguralla, and joins
Nallapadu near .
References
{{DEFAULTSORT:Pagidipalli-Nallapadu section
5 ft 6 in gauge railways in India
Rail transport in Andhra Pradesh
Railway lines opened in 1930
1930 establishments in India