North–South Line (Jakarta MRT)
   HOME

TheInfoList



OR:

The North–South line is a rapid transit line of the
Jakarta MRT The Jakarta Mass Rapid Transit ( ''Jakarta'') or Jakarta MRT (, stylized as ''mrt jakarta'') is a rapid transit system in Jakarta, the capital city of Indonesia. The system is operated by PT Mass Rapid Transit Jakarta (Perseroda), a municipall ...
. Coloured dark red on the map, the line is currently long and serves 13 stations. It is the first and only operational line of the Jakarta MRT. The line is the second rail transit system to be operated in the country, after Palembang LRT.


History


Planning

The origins of the line and its development came in 1995, when the provincial government set up an idea to build the MRT system ( subway), A giant Japanese company,
Itochu is a Japanese corporation based in Umeda, Kita-ku, Osaka and Aoyama, Minato, Tokyo, Aoyama, Minato, Tokyo. It is one of the largest Japanese ''sogo shosha'' (general trading and investment companies) distinguished by the strength of its textil ...
, was certainly a candidate for the tender. Three months later, when then Governor of DKI Jakarta (at that time),
Soerjadi Soedirdja Soerjadi Soedirdja (11 October 1938 – 3 August 2021) was an Indonesian politician and military general. He was Governor of Jakarta from 1992 to 1997 and also Minister of Home Affairs from 1999 to 2001. Career Governor of Jakarta During his le ...
, announced the formation of a consortium to build the system. In the same year, an international consortium was formed to prepare a feasibility study for the first line of the MRT system and the consortium was named Indonesian Japanese European Group (IJEG). The plan would have involved a 14 km route between
Blok M Blok M is a business and shopping quarter located in Kebayoran Baru, South Jakarta, Indonesia. It runs east from Iskandarsyah street to Bulungan street in the west. North from Falatehan street to Melawai street in the south. The development is si ...
and Jakarta Kota Station, fully built underground. The following year, the wide and comfortable pedestrian paths in
Singapore Singapore, officially the Republic of Singapore, is an island country and city-state in Southeast Asia. The country's territory comprises one main island, 63 satellite islands and islets, and one outlying islet. It is about one degree ...
were related to the construction of subway stations and this was planned to be completed and operational in 2000. Unfortunately, in 1998, it never happened due to the 1998 riots.


Development

The development of the first line began when then President
Susilo Bambang Yudhoyono Susilo Bambang Yudhoyono (born 9 September 1949), commonly referred to as SBY, is an Indonesian politician and retired Indonesian Army, army general who served as the sixth president of Indonesia from 2004 to 2014 and the second president of Ind ...
designated the system as a national project. On 28 November 2006, the first loan agreement was signed with the
Japan International Cooperation Agency The Japan International Cooperation Agency (), also known as JICA'','' is a governmental agency that delivers the bulk of Official Development Assistance (ODA) for the government of Japan. It is chartered with assisting economic and social gr ...
(JICA, then
Japan Bank for International Cooperation The , JBIC, is a Japanese public financial institution and export credit agency that was created on October 1, 1999, through the merger of the Japan Export-Import Bank (JEXIM) and the Overseas Economic Cooperation Fund (OECF). JBIC became the ...
or JBIC) for the project. The agreement included study funding and construction work funding for the first line of the system.


Phase 1

A total of eight contracts were awarded. *CP 101 (Construction of Lebak Bulus Depot, Lebak Bulus station and related elevated works) awarded to
Tokyu Corporation The , a contraction of and formerly until 2 September 2019, is a Japanese ''keiretsu'' or conglomerate headquartered in Shibuya, Tokyo. While a multinational corporation, its main operation is , a wholly-owned subsidiary operating railways i ...
- Wijaya Karya consortium. *CP 102 (Construction of Cipete Raya and Fatmawati stations and related elevated works) awarded to Tokyu Corporation - Wijaya Karya consortium. *CP 103 (Construction of Haji Nawi, Blok A, Block M and ASEAN stations and related elevated works) awarded to
Obayashi Corporation is one of five major Japanese construction companies along with Shimizu Corporation, Takenaka Corporation, Kajima Corporation, and Taisei Corporation. It is listed on the Tokyo Stock Exchange and is one of the Nikkei 225 corporations. Its h ...
-
Shimizu Corporation is an architecture, architectural, civil engineering and General contractor, general contracting firm. It has annual sales of approximately US$15 billion and has been widely recognized as one of the top 5 contractors in Japan and among the top 2 ...
- PT Jaya Konstruksi JV. *CP 104 (Construction of Senayan and Istora stations and related tunnelling works) awarded to Shimizu Corporation - Obayashi Corporation - PT Wijaya Karya - PT Jaya Konstruksi JV. *CP 105 (Construction of Bendungan Hilir and Senayan stations and related tunnelling works) awarded to Shimizu Corporation - Obayashi Corporation - PT Wijaya Karya - PT Jaya Konstruksi JV. *CP 106 (Construction of Dukuh Atas and Bundaran HI stations and related tunnelling works) awarded to Sumitomo Mitsui Construction - PT Hutama Karya consortium. *CP 107 (Construction of railway systems and trackworks) awarded to Metro One consortium (namely Mitsui & Co.Toyo Engineering Corporation
Kobe Steel Kobe Steel, Ltd. (株式会社神戸製鋼所, ''Kabushiki gaisha Kōbe Seikō-sho'') is a major Japanese steel manufacturer headquartered in Chūō-ku, Kobe. Kobelco is the unified brand name of the Kobe Steel Group. Kobe Steel has the low ...
, Ltd – Inti Karya Persada Tehnik). *CP 108 (Construction of rolling stock) awarded to
Sumitomo Corporation is one of the largest worldwide '' sōgō shōsha'' general trading companies, and is a diversified corporation. The company was incorporated in 1919 and is a member company of the Sumitomo Group. It is listed on three Japanese stock exchange ...
-
Nippon Sharyo , formed in 1896, is a major rolling stock, Heavy equipment, heavy equipment, Diesel generator, generator, Special-purpose entity, special purpose vehicle and bridge manufacturer based in Nagoya, Japan. In 1996, it abbreviated its ...
consortium. On 1 June 2013, the first three civil contracts for the underground section were signed. Three civil engineering contracts for the elevated section were signed in the third quarter of 2013. Construction work began in October 2013. Tunnelling was completed on 23 February 2017, meeting the target completion date. By October 2017, the construction of both elevated and underground line sections were completed. Ahead of its official opening, a limited public trial run was conducted from 12 March 2019 to 23 March 2019. The official opening ceremony was held on 24 March 2019 by President
Joko Widodo Joko Widodo (; born 21 June 1961), often known mononymously as Jokowi, is an Indonesian politician, engineer, and businessman who served as the seventh president of Indonesia from 2014 to 2024. Previously a member of the Indonesian Democratic ...
.


Phase 2

A total of eight contracts were put up. *CP 200 (Construction of underground
electrical substation A substation is a part of an electrical generation, transmission, and distribution system. Substations transform voltage from high to low, or the reverse, or perform any of several other important functions. Between the generating station an ...
near Monas station) awarded to PT Trocon Indah Perkasa. *CP 201 (Construction of Thamrin and Monas stations and related tunnelling works) awarded to Shimizu Corporation - PT Adhi Karya JV. *CP 202 (Construction of Harmoni, Sawah Besar and Mangga Besar stations and related tunnelling works) awarded to Shimizu Corporation - PT Adhi Karya JV. *CP 203 (Construction of Glodok and Kota stations and related tunnelling works) awarded to Sumitomo Mitsui Construction Company - PT Hutama Karya JO. *CP 204 (Construction of depot at Ancol Barat). *CP 205 (Construction of railway systems and trackworks) awarded to
Sojitz is a '' sogo shosha'' (general trading company) based in Tokyo, Japan. It is engaged in a wide range of businesses globally, including buying, selling, importing, and exporting goods, manufacturing and selling products, providing services, and p ...
-Larsen and Toubro Limited JV. *CP 206 (Construction of 14 sets of rolling stock). *CP 207 (Installation of Automatic Fare Collection system). Groundbreaking for Phase 2 was initially planned to begin on 19 December 2018. However, due to land acquisition issues, it was pushed back to January 2019. On 30 January 2019, President Director of PT MRT Jakarta, William Sabandar announced that the groundbreaking ceremony is delayed again as the State Secretariat had yet to issue a land-use permit for the area near Medan Merdeka. The groundbreaking ceremony for Phase 2 was finally held on 24 March 2019 and advanced works began in June 2019 near the future Monas station. Site works for contract CP201 were originally planned to begin in March 2020. However, due to the
COVID-19 pandemic The COVID-19 pandemic (also known as the coronavirus pandemic and COVID pandemic), caused by severe acute respiratory syndrome coronavirus 2 (SARS-CoV-2), began with an disease outbreak, outbreak of COVID-19 in Wuhan, China, in December ...
, it was pushed back by three months to June 2020. Site works for contract CP203 began in September 2021. Site works for CP202 began in August 2022, after multiple delays in securing a bidder. Phase 2A will commence operations in 2028, and Phase 2B will follow suit four years later.


Funding

Phase 1 was funded through soft loans by the JBIC, which now has merged to JICA. The loan tenor is 30 years and a grace period of 10 years. The first payment is made 10 years after signing the agreement. Payments last up to 30 years afterward with an interest rate of 0.25% per annum. Meanwhile, phase II is funded by a loan with a similar scheme by JICA but with a tenor of 40 years. The first payment is made 10 years after signing the agreement. The interest charged is 0.1% on the first stage of payment. This funding also includes part of the funding for phase I due to budget shortfalls, one of which is used to implement updated government regulations on preventing the impact of earthquakes. The debt payment burden is divided into 49% by the Jakarta Provincial Government and 51% by the Directorate General of Railways.


Network


Route

The North–South line connects the Lebak Bulus region in South Jakarta with Ancol in North Jakarta. For now, only the section between Lebak Bulus Station and Bundaran Hotel Indonesia Station is operational. This line serves 13 stations with 7 elevated stations and 6 underground stations. The elevated structure stretches for approximately from Lebak Bulus Station to ASEAN Station. The underground line stretches for approximately from Senayan Station to Bundaran HI Station. The transition between elevated and underground lines is located between ASEAN Station and Senayan Station. This line is planned to intersect with the East–West Line at Thamrin Station.


Stations

The stations on the north–south line are generally uniformly designed. With the exception of Blok M station, all stations have two tracks. The stations also have a number of supporting facilities, such as free
WiFi Wi-Fi () is a family of wireless network protocols based on the IEEE 802.11 family of standards, which are commonly used for Wireless LAN, local area networking of devices and Internet access, allowing nearby digital devices to exchange data by ...
and disabled-friendly toilets. In the concourse area, there are ATMs and various retail kiosks. In addition, there is also a nursing room and a prayer room. Each station is equipped with a flood barrier, so it is ensured that all stations are flood-free. It is also planned that each station will be connected to a
transit-oriented development In urban planning, transit-oriented development (TOD) is a type of Real estate development, urban development that maximizes the amount of Residential area, residential, business and leisure space within Pedestrian, walking distance of public t ...
area. One of them is the Dukuh Atas Station, which is connected to the
KRL Commuterline KRL Commuterline, commonly known as Greater Jakarta Commuter rail, Jakarta Commuter rail, and KRL Commuter Line Jabodetabek is a commuter rail system for Jabodetabek, Greater Jakarta in Indonesia. It was previously known as KRL Jabodetabek. It ...
and Soekarno–Hatta Airport Rail Link through the
Dukuh Atas TOD Dukuh Atas TOD ( or ''KBT Dukuh Atas'') is a transit-oriented development area between Central Jakarta and South Jakarta, Indonesia. This is built as part of constructing several other transit oriented development across Jakarta to facilitate com ...
. In addition, there are transit-oriented areas at Istora Senayan Station, Blok M, ASEAN, Fatmawati, and Lebak Bulus. The development of the TODs can take the form of building public facilities and housing around the station, as well as improving access to other modes of transportation.


List of stations


Rolling stock

The North–South line of the Jakarta MRT uses a fleet made by the
Nippon Sharyo , formed in 1896, is a major rolling stock, Heavy equipment, heavy equipment, Diesel generator, generator, Special-purpose entity, special purpose vehicle and bridge manufacturer based in Nagoya, Japan. In 1996, it abbreviated its ...
consortium from Japan which and known as "Ratangga". The fleet consists of 16 trains, each with six carriages. Each carriage has four doors on either side, except for the first and last carriages which have driver's cabins. Work on building the trains started in 2015 and they began to be delivered to Indonesia in 2018. The trains began to fully operate in conjunction with the inauguration of the line on March 24, 2019. An additional fourteen sets (under Contract Package CP 206) will be added to the trains for the second phase leading to Ancol.


Incidents

* On November 3, 2017, an MRT line barrier fell. The incident occurred at around 22.00 at the intersection between Jalan Panglima Polim and Jalan Wijaya II. This incident resulted in a motorcyclist being injured and hitting a car. This incident was caused by an unbalanced crane when lifting a parapet wall. The parapet concrete that was lifted then fell from the construction site on the flyover. It was found out after the investigation, the contractor did not follow the appropriate lifting method with the crane arm being too long and the lack of supervision from the supervisor. In addition, the lack of traffic security at the time of the incident was the cause of the victims. The Corporate Secretary of PT MRT Jakarta, Tubagus Hikmatullah said that traffic security has been carried out on some roads. However, the concrete barrier fell outside the safe area of traffic restrictions because it was first caught by the crane before it actually fell onto the road. * On May 30, 2024, an iron beam held by tower crane machine from construction project of the new building of Kejaksaan Agung RI (English: Attorney General's Office of Indonesia) fell onto the tracks when a trainset was passing near Blok M station, causing fire sparks and power outage of the trainset. The service of the entire North–South Line was temporarily halted to evacuate the iron beam and check the condition of tracks and signaling. No human victims were reported and all passengers of each operating trainset were evacuated to the nearest station. The investigation reported that the crane machine suddenly lost power and lost grip of the beam due to electromagnetic induction caused by the trainset passing nearby, thus the beam was pulled onto the tracks by electromagnetic force. PT Hutama Karya (Corp) which was responsible for the construction project apologised for the accident and agreed with PT MRT Jakarta to increase safe area of the crane to at least 8 meters from the MRT area, up from previously-agreed 6 meters. The North–South Line returned back to normal service the next day.


Footnotes