The N Line, also known as the North Metro Rail Line during construction, is a commuter rail line which is part of the
commuter and light rail system owned by the
Regional Transportation District
The Regional Transportation District, more commonly referred to as RTD, is the regional agency operating public transit services in all or a portion of eight out of the twelve counties in the Denver–Aurora combined statistical area in the U.S. ...
(RTD) in the
Denver metropolitan area
Denver is the central city of a conurbation region in the U.S. state of Colorado. The conurbation includes one continuous region consisting of the six central counties of Adams, Arapahoe, Broomfield, Denver, Douglas, and Jefferson. The Denver regi ...
in
Colorado
Colorado is a U.S. state, state in the Western United States. It is one of the Mountain states, sharing the Four Corners region with Arizona, New Mexico, and Utah. It is also bordered by Wyoming to the north, Nebraska to the northeast, Kansas ...
. The first from downtown Denver to 124th Avenue in
Thornton opened as part of the
FasTracks
FasTracks is a multibillion-dollar public transportation expansion plan under construction in metropolitan Denver, Colorado, United States. Developed by the Regional Transportation District (RTD), the plan consists of new commuter rail, light r ...
expansion plan on September 21, 2020.
When fully built out, the line will be long and pass through Denver,
Commerce City,
Northglenn, and
Thornton. The N Line features Colorado's longest bridge at called the Skyway Bridge.
While other RTD commuter lines are operated by Denver Transit Partners for RTD, this is the only line operated by RTD itself.
History
The possibilities and studies for a rail line in the North
Metropolitan Denver have existed since the opening of the Light Rail
Central Corridor in 1994. In the 2004 election year voters approved the North Metro Corridor as part of the RTD FasTracks expansion plan. In September 2006 the
Environmental Impact Statement
An environmental impact statement (EIS), under United States environmental law, is a document required by the 1969 National Environmental Policy Act (NEPA) for certain actions "significantly affecting the quality of the human environment". An E ...
(EIS) was started, with completion in late 2010, and gaining approval by the Federal Transit Administration in April 2011. A preexisting railroad right-of-way for the line was purchased in 2009. The contract to build the North Metro Rail line to 124th Avenue was awarded to Graham, Balfour Beatty, Hamon Constructors (GBBH) in November 2013 with notice to proceed in December 2013. The GBBH contract included an option that when funding is available RTD can exercise the option to build the line to 162nd Avenue.
Groundbreaking of the N Line's construction occurred on March 20, 2014 with an expected completion date in 2018. The GBBH joint Venture is operating under the name Regional Rail Partners (RRP). By August 2018, construction on the line was 85% complete, but the estimated completion had slipped to late 2020 or early 2021;
the start of revenue service had again been delayed several months by September 2019. Despite slowdowns caused by the
COVID-19 pandemic
The COVID-19 pandemic (also known as the coronavirus pandemic and COVID pandemic), caused by severe acute respiratory syndrome coronavirus 2 (SARS-CoV-2), began with an disease outbreak, outbreak of COVID-19 in Wuhan, China, in December ...
, the line opened on September 21, 2020.
Route
The N Line's southern terminus is at
Union Station
A union station, union terminal, joint station, or joint-use station is a railway station at which the tracks and facilities are shared by two or more separate railway company, railway companies, allowing passengers to connect conveniently bet ...
in
Denver
Denver ( ) is a List of municipalities in Colorado#Consolidated city and county, consolidated city and county, the List of capitals in the United States, capital and List of municipalities in Colorado, most populous city of the U.S. state of ...
. It runs mostly on a preexisting railroad right-of-way to its northern terminus at Eastlake/124th station.
A notable exception to using the existing railroad right-of-way is the RTD designated "Skyway Bridge" whose path takes it over and past several obstacles: it crosses the
BNSF Railway
BNSF Railway is the largest freight railroad in the United States. One of six North American Class I railroads, BNSF has 36,000 employees, of track in 28 states, and over 8,000 locomotives. It has three Transcontinental railroad, transcontine ...
railroad tracks, Brighton Boulevard, a
Union Pacific Railroad
The Union Pacific Railroad is a Railroad classes, Class I freight-hauling railroad that operates 8,300 locomotives over routes in 23 U.S. states west of Chicago and New Orleans. Union Pacific is the second largest railroad in the United Stat ...
spur track, the Farmers Reservoir and Irrigation Company (FRICO) Ditch, the Metro Waste Water Plant and
Suncor
Suncor Energy Inc. () is a Canadian integrated energy company based in Calgary, Alberta. It specializes in production of synthetic crude from oil sands. In the 2020 Forbes Global 2000, Suncor Energy was ranked as the 48th-largest public compan ...
oil processing site,
Sand Creek, and
Interstate 270.
The N line route leaves Union Station following the Union Pacific / BNSF corridor, near
Coors Field
Coors Field is a baseball stadium in downtown Denver, Colorado. It is the ballpark of Major League Baseball's Colorado Rockies. Opened in 1995 Major League Baseball season, 1995, the park is located in Denver's LoDo, Lower Downtown neighborhood, ...
it crosses over the rail yards and twice the
South Platte River
The South Platte River is one of the two principal tributaries of the Platte River. Flowing through the U.S. states of Colorado and Nebraska, it is itself a major river of the American Midwestern United States, Midwest and the American Sou ...
continuing northeast into the
48th & Brighton/National Western Center station located near the
National Western Stock Show complex. The northeasterly line near
Riverside Cemetery then enters the Skyway Bridge to begin a northern path returning to grade level near the Commerce City/72nd station following again the former rail right of way into the station. From there it passes under
Interstate 76 and
Colorado State Highway 224, then again over the South Platte River following a slightly northwest path north until the Original Thornton/88th station. Then, on a slight northeast path, the line near 100th Avenue curves northwest into the Thornton Crossroads/104th station. On a northwest path the line continues until near East 112th Avenue where in travels north into the Northglenn/112th station. On a northward path the line arrives at Eastlake/124th station, the site of a historic grain elevator and
Eastlake, Colorado.
Stations
FasTracks
In 2004 Colorado voters approved
FasTracks
FasTracks is a multibillion-dollar public transportation expansion plan under construction in metropolitan Denver, Colorado, United States. Developed by the Regional Transportation District (RTD), the plan consists of new commuter rail, light r ...
, a multibillion-dollar
public transport
Public transport (also known as public transit, mass transit, or simply transit) are forms of transport available to the general public. It typically uses a fixed schedule, route and charges a fixed fare. There is no rigid definition of whic ...
ation expansion plan. In 2009 RTD paid $117 million ($ adjusted for inflation) to purchase the right-of-way from
Union Pacific
The Union Pacific Railroad is a Class I freight-hauling railroad that operates 8,300 locomotives over routes in 23 U.S. states west of Chicago and New Orleans. Union Pacific is the second largest railroad in the United States after BNSF, ...
in preparation for the build-out of the North Metro rail line. Budgeting issues set back FasTracks plans, including those for the N Line. Construction of the line was able to proceed when RTD partnered with a private firm to build the line in 2 stages. The first stage will build the line to the 124th Avenue Station with an opening in 2020, while the second stage to North Thornton/Hwy 7 station will commence when projected ridership makes economic sense.
References
{{Colorado public transit
RTD commuter rail
Transportation in Adams County, Colorado
Railway services introduced in 2020
Railway lines opened in 2020
2020 establishments in Colorado