The Millennium Line is the second line of the
SkyTrain rapid transit system in the
Metro Vancouver
The Metro Vancouver Regional District (MVRD), or simply Metro Vancouver, is a Canadian political subdivision and Corporation, corporate entity representing the metropolitan area of Greater Vancouver, designated by provincial legislation as o ...
region of
British Columbia
British Columbia is the westernmost Provinces and territories of Canada, province of Canada. Situated in the Pacific Northwest between the Pacific Ocean and the Rocky Mountains, the province has a diverse geography, with rugged landscapes that ...
, Canada. The line is owned and operated by BC Rapid Transit Company, a subsidiary of
TransLink, and links the cities of
Vancouver
Vancouver is a major city in Western Canada, located in the Lower Mainland region of British Columbia. As the List of cities in British Columbia, most populous city in the province, the 2021 Canadian census recorded 662,248 people in the cit ...
,
Burnaby
Burnaby is a city in the Lower Mainland region of British Columbia, Canada. Located in the centre of the Burrard Peninsula, it neighbours the City of Vancouver to the west, the District of North Vancouver across the confluence of the Burrard In ...
,
Coquitlam
Coquitlam ( ) is a city in the Lower Mainland of British Columbia, Canada. Mainly suburban, Coquitlam is the List of cities in British Columbia, sixth-largest city in the province, with an estimated population of 174,248 in 2024, and one of th ...
and
Port Moody. The line was opened in 2002 and was named in recognition of the
new millennium.
Route
The Millennium Line operates from VCC–Clark station in Vancouver to Lafarge Lake–Douglas station in Coquitlam. The line is elevated to
Burquitlam station, where it then goes through a bored tunnel to the city of
Port Moody. In Port Moody, the line runs at grade level, rising to cross railway tracks. From
Coquitlam Central station
Coquitlam Central station is an Intermodal passenger transport, intermodal rapid transit station in Metro Vancouver served by both the Millennium Line—part of the SkyTrain (Vancouver), SkyTrain system—and the region's West Coast Express commut ...
, the line is elevated to the terminus at Lafarge Lake–Douglas station.
When the
Evergreen Extension opened in late 2016, eastbound trains crossed the westbound tracks to access the new northernmost platform (Platform 3) at Lougheed Town Centre station. Trains then operated left-track running to a crossover junction just before Burquitlam Station, where trains crossed back to right-track running. Westbound Millennium Line trains crossed over to left-hand running just south of Burquitlam station, which allowed them to access westbound Platform 2 at Lougheed Town Centre station. This unusual service design allowed same-platform interchange for
Expo Line passengers arriving at Lougheed Town Centre and continuing west towards
VCC–Clark station on the Millennium Line.
On June 25, 2018, service patterns were changed to eliminate all left-track running. This change meant passengers arriving westbound at Lougheed on the Expo Line who wished to continue towards VCC–Clark could either change platforms at Lougheed or remain on their Expo Line train until its terminus at the next station,
Production Way–University, where they could make a same-platform transfer to a westbound Millennium Line train. For passengers arriving eastbound at Lougheed, transfers between eastbound Millennium and Expo Line trains were now same-platform. TransLink stated the change to traditional right-track running would provide faster and more reliable trips for passengers as the many track changes the initial service pattern required had resulted in delays.
History
Early proposals
When the Expo Line was opened in 1985, an extension to
Lougheed Mall in east
Burnaby
Burnaby is a city in the Lower Mainland region of British Columbia, Canada. Located in the centre of the Burrard Peninsula, it neighbours the City of Vancouver to the west, the District of North Vancouver across the confluence of the Burrard In ...
was proposed. The most likely junction point for the spur to Lougheed Mall would have been from
Royal Oak station, up Edmonds Street to Lougheed Mall, although early SkyTrain route maps also suggested an extension northeast from
New Westminster
New Westminster (colloquially known as New West) is a city in the Lower Mainland region of British Columbia, Canada, and a member municipality of the Metro Vancouver Regional District. It was founded by Major-General Richard Moody as the cap ...
. Neither plan was realized, although the extension of Expo Line tracks to
Columbia Station in 1989 and the completion of the
SkyBridge to
Surrey
Surrey () is a Ceremonial counties of England, ceremonial county in South East England. It is bordered by Greater London to the northeast, Kent to the east, East Sussex, East and West Sussex to the south, and Hampshire and Berkshire to the wes ...
in 1990 resulted in a short spur east of Columbia station, which was later incorporated into the new Millennium Line.
Phase I: Columbia to Commercial Drive (2002)

In 1995, the British Columbia government announced that an entirely new line, a street-level light rail line, would be built along Broadway and Lougheed Highway to Lougheed Mall (served by
Lougheed Town Centre station), as the first phase of the "T"-Line (one of three Intermediate Capacity Transit System lines) outlined in the Metro Vancouver's Livable Region Strategic Plan that extended into
Coquitlam
Coquitlam ( ) is a city in the Lower Mainland of British Columbia, Canada. Mainly suburban, Coquitlam is the List of cities in British Columbia, sixth-largest city in the province, with an estimated population of 174,248 in 2024, and one of th ...
. An 18-month review of rapid transit was scheduled and started in January 1998 but was cut short by the government's announcement of its choice of Bombardier's technology in June 1998.
This meant that the first phase of the line would have to connect to the existing Expo Line to use its maintenance yard. Connecting the two lines at
Broadway station was deemed impracticable, so the lines were connected in New Westminster. Switches to the Millennium Line were installed on the Expo Line just east of Columbia station. Expo Line service was reduced to a single track over the Skybridge during the installation of these switches. The main contractor for the project was SAR Transit, a joint venture of SC Infrastructure, Agra Monenco, and
Rizzani de Eccher Inc.
The Millennium Line opened for revenue service on January 7, 2002 (a preview for SkyTrain passengers took place on the prior two days), with trains operating between
Waterfront station on the Expo Line and
Braid station in eastern New Westminster.
For the second phase, service was extended to Commercial Drive station (since merged with Broadway station to form
Commercial–Broadway) on August 31, 2002 (with full integration with the bus network occurring on September 3, 2002).
Lake City Way and extension to VCC–Clark (2003–2006)
Lake City Way station, located between Sperling–Burnaby Lake and Production Way–University stations, opened on November 21, 2003. Three years later, the line was extended to its present terminus,
VCC–Clark station, on January 6, 2006. The Millennium Line was now completed at a cost of $1.2billion, $40million under budget.
In 2007, the non-interlined portion of the Millennium Line served an average of 70,000 passengers per day. Of these, 14,000 passengers arrived on trains travelling from Expo Line stations west of Columbia station, and 7,000 transferred from the Surrey section of the Expo Line. In 2009, it was estimated that ridership had grown to at least 80,000 passengers per day.
Initially, the Millennium Line service followed the Expo Line from Waterfront to Columbia stations, then looped back into Vancouver via the new route, passing through
Commercial–Broadway again at a different platform, and terminating at VCC–Clark station. After a reconfiguration on October 22, 2016, in preparation for the opening of the
Evergreen Extension, the Millennium Line ran between VCC–Clark station in the west to Lougheed Town Centre station in the east. Transfers to the Expo Line were now made possible at
Production Way–University and
Lougheed Town Centre stations.
Braid
A braid (also referred to as a plait; ) is a complex structure or pattern formed by interlacing three or more strands of flexible material such as textile yarns, wire, or hair.
The simplest and most common version is a flat, solid, three-strand ...
and
Sapperton stations were reassigned to the Expo Line.
Phase II: Evergreen Extension (2016)
The second phase of the Millennium Line was to be an extension from Lougheed Mall to Coquitlam (then known as the Port Moody–Coquitlam (PMC) Line), which would have provided a "one-seat ride" from Coquitlam to VCC–Clark station. A short spur and switches to the PMC Line were installed to the east of Lougheed Town Centre station and a third platform was roughed-in in anticipation of the extension. Phase II was placed on hold following a change in provincial government.
A SkyTrain extension from Lougheed Town Centre station to Coquitlam Town Centre was proposed when the original Millennium Line was built and the necessary junction tracks for such an extension were built at the station during its initial construction. At one point prior to 2008, the mode planned for the extension was changed to
light rail
Light rail (or light rail transit, abbreviated to LRT) is a form of passenger urban rail transit that uses rolling stock derived from tram technology National Conference of the Transportation Research Board while also having some features from ...
instead of SkyTrain, which meant that the junction tracks would have remained unused. However, in February 2008, plans reverted to the use of SkyTrain technology for the extension, to facilitate higher ridership, shorten travel times and to integrate seamlessly with the existing SkyTrain network. As a result, the junction tracks and roughed-in third platform at Lougheed Town Centre station were used as part of the Evergreen Extension.
Construction of the Evergreen Extension began in 2013 and was completed in late 2016. The extension opened for revenue service on December 2, 2016.
Expansion plans
Broadway extension
On March 16, 2018, the provincial government approved the construction of the "Broadway Subway Project", an initiative which will extend the Millennium Line west to Arbutus Street and add six new stations. The extension will be long, all but of which will be underground, and cost an estimated $2.83billion. Originally scheduled for a 2025 opening, the expected opening was pushed back to early 2026 in November 2022.
The delay was caused by a labour dispute involving concrete workers which started in June 2022.
On May 24, 2024, the province revealed that the project would be delayed further, to late 2027.
While six new stations are confirmed for the Broadway extension, one will become part of the existing
Broadway–City Hall Canada Line station, which is scheduled to be upgraded as part of the project:
*
Great Northern Way–Emily Carr station, at Great Northern Way and Thornton Street adjacent to the
Emily Carr University
*
Mount Pleasant station, at Main Street and East Broadway
* Broadway–City Hall station, at Cambie Street and West Broadway. The existing Broadway–City Hall station on the Canada Line, originally designed with a "knock-out" panel to accommodate a connection to a future Millennium Line extension, will be upgraded and connected to the extension. An adjacent development was required by the City of Vancouver to provide space for an additional entrance to the Millennium Line portion of the station.
*
Oak–VGH station, at Laurel Street and West Broadway near Vancouver General Hospital (VGH)
*
South Granville station, at Granville Street and West Broadway
*
Arbutus station, at Arbutus Street and West Broadway. The
99 B-Line bus route, which follows much of the extension's route, will be truncated to terminate at this station.
Construction
Preliminary work on the extension began on February 19, 2019, with the installation of trolley poles and wires on 12th Avenue between Arbutus and Granville Streets that were required in order to reroute
trolley buses off of
Broadway for the duration of the construction of the subway. On June 22, 2020, trolleybuses were removed from Broadway. The provincial government initially had a plan to have a contractor selected by April 2020 to allow for construction to begin later that year. On July 17, 2020, the provincial Ministry of Transportation announced that
Acciona Infrastructure, a Spanish conglomerate, and
Ghella, an Italian company, would be in charge of construction. Demolition of buildings, to make room for station entrances and construction staging areas, began in February 2021.
Major construction on the extension began on May 13, 2021.
"Traffic decks" began to be installed over Mount Pleasant, Broadway–City Hall, Oak–VGH, South Granville, and Arbutus stations, to avoid closing Broadway while station construction takes place underneath. Construction of the elevated guideway at the eastern end of the extension began on December 13, 2021. This guideway is the only above-ground portion of the extension and connects the existing
VCC–Clark station to a tunnel portal adjacent to the
Emily Carr University of Art and Design.
The
tunnel boring machines for the project were delivered to Vancouver between April and June 2022. Two identical machines, each in diameter and in length, would dig about of tunnel per day, at a depth of below the surface. The two machines were named Elsie and Phyllis, honouring two influential Vancouver residents:
aeronautical engineer Elsie MacGill and
mountaineer Phyllis Munday. Elsie began tunnelling the eastbound tunnel from
Great Northern Way–Emily Carr station in October 2022, with Phyllis beginning work on the westbound tunnel in late November. Both machines had reached Broadway–City Hall station by May 26, 2023, and
South Granville station by February 8, 2024. Phyllis completed boring at
Arbutus station on March 20, 2024, and the tunnel boring phase was fully completed when Elsie reached Arbutus on April 26, 2024.
University of British Columbia extension
On January 14, 2008, the Government of British Columbia announced a commitment to the expansion of the Millennium Line to the
University of British Columbia
The University of British Columbia (UBC) is a Public university, public research university with campuses near University of British Columbia Vancouver, Vancouver and University of British Columbia Okanagan, Kelowna, in British Columbia, Canada ...
(UBC) by 2020 as part of a $14-billion transit spending package to address
global warming
Present-day climate change includes both global warming—the ongoing increase in global average temperature—and its wider effects on Earth's climate system. Climate change in a broader sense also includes previous long-term changes ...
. It was not clear what route the new line would take, but it was hinted that there would be less use of
cut-and-cover tunnelling to minimize disruption to businesses along Broadway and avoid
the same problems seen during the Canada Line construction along
Cambie Street. This expansion failed to materialize.
On February 15, 2019, the TransLink Mayors' Council again approved an extension of the line to the UBC campus, although funding for this continuation past Arbutus Street had not yet been secured. In 2022, TransLink unveiled a proposed route for the extension: the line would continue west under Broadway, with stations at Macdonald and Alma Streets. It would then deviate slightly north to a station serving the redevelopment at the
Jericho Lands. In the
University Endowment Lands, the line would either take an elevated route following University Boulevard, or a tunnelled route underneath the
University Golf Club
The University Golf Club is a public golf club located in Pacific Spirit Regional Park near the city of Vancouver, Vancouver, British Columbia, Canada and the University of British Columbia. It is owned and operated by Musqueam Capital Corporatio ...
, to get to UBC at a station under the University Boulevard bus loop. The station locations at Macdonald Street, Alma Street, and the Jericho Lands were approved by the Vancouver City Council in March 2022.
Port Coquitlam extension
When the
Evergreen Extension was built, the first few metres of track and a track switch to allow for an eventual eastward extension to
Port Coquitlam
Port Coquitlam ( ) is a city in British Columbia, Canada. It is one of 21 municipalities comprising Metro Vancouver. Located east of Vancouver, it is on the north bank of the confluence of the Fraser River and the Pitt River. Coquitlam borders ...
were built at
Coquitlam Central station
Coquitlam Central station is an Intermodal passenger transport, intermodal rapid transit station in Metro Vancouver served by both the Millennium Line—part of the SkyTrain (Vancouver), SkyTrain system—and the region's West Coast Express commut ...
. This would create two branches where trains would alternate between going east to Lafarge Lake–Douglas station or to Port Coquitlam. A feasibility study was conducted, started during early 2020 and running for about six months. Port Coquitlam mayor Brad West, the Port Coquitlam city council, and the
Coquitlam City Council all voiced support for the extension. However, no funding had been secured nor a formal plan created.
Stations
See also
*
SkyTrain (Vancouver) rolling stock
Notes
References
External links
TransLink– The organization that owns SkyTrain
{{TransLink Services
Railway lines opened in 2002
2002 establishments in British Columbia
Transport in Burnaby
Transport in Coquitlam
Rapid transit lines in Canada
650 V DC railway electrification