Malankara Dam
   HOME

TheInfoList



OR:

Malankara dam is a
gravity dam A gravity dam is a dam constructed from concrete or stone masonry and designed to hold back water by using only the weight of the material and its resistance against the foundation. Gravity dams are designed so that each section of the dam is ...
constructed across
Muvattupuzha Muvattupuzha () is a Municipalities of Kerala, municipalityhttps://lsgkerala.gov.in/system/files/2017-10/localbodies.pdf in the Ernakulam district of Kerala, India. It is located east of the district headquarters in Thrikkakara and a ...
river for irrigation purposes. The dam is constructed to make use of the tail water from the Moolamattom power house. The project is run under the Muvattupuzha Valley Irrigation Project and
KSEB Kerala State Electricity Board (KSEB) is an Indian public sector undertaking under the Government of Kerala that generates, transmits and distributes electricity in the state. Established in 1957, the agency comes under the authority of the Po ...
. The artificial lake covers an area of around 11 square km.


Tourism

Constructed across the
Thodupuzha Thodupuzha () is a municipality and taluk in the Idukki district of Kerala, India. It is located west of the district headquarters in Painavu and about north of the state capital Thiruvananthapuram. As per the 2011 Indian census, Thodupu ...
river which is a tributary to the Muvattupuzha river, for the purpose of irrigation, this reservoir is also a tourism spot. This artificial lake is located near to the Thodupuzha – Moolamattom Road (State Highway 33) covering an area of around 11 square km. The reservoir is ideal for boating and fishing. Unlike the
Idukki Idukki (ഇടുക്കി; ) is one of the 14 districts in the Indian state of Kerala in the southwest of the country. It is the largest district in Kerala and lies amid the Cardamom Hills of Western Ghats in Kerala. Idukki district co ...
and Cheruthoni dams, the Malankara dam is open to tourists round the year. Also a park is under construction nearby to the reservoir covering an adjacent 15
acre The acre ( ) is a Unit of measurement, unit of land area used in the Imperial units, British imperial and the United States customary units#Area, United States customary systems. It is traditionally defined as the area of one Chain (unit), ch ...
island.


Hydro Electric Project

The Hydro electric project utilizes the tail race water from the Moolamattom Power house which is stored by the dam. Three generators are installed with 3.5 Megawatt capacity each and a total of 10.5 Megawatt. The prime movers are Kaplan type turbines. The project was carried out by Public limited companies like SILK and TELK. Water at 25 Cubic meter/Second flows through a penstock which is 17.5 meter long and 3 meter in diameter to the power house. 44 million units of electricity is produced annually.


See also

Muttom, Thodupuzha


References

{{Dams in Kerala Dams in Idukki district Year of establishment missing Tourism in Kerala Tourism in Idukki district Tourist attractions in Idukki district