The Kandadji Dam, is a large multipurpose dam under construction on the
Niger River The Niger River ( ; ) is the main river of West Africa, extending about . Its drainage basin is in area. Its source is in the Guinea Highlands in south-eastern Guinea near the Sierra Leone border. It runs in a crescent shape through ...
. The site is situated near the small town of ''Kandadji'',
Tillabéri Department Tillabéri is a Departments of Niger, department of the Tillabéri Region in Niger. Its capital lies at the city of Tillabéri, and contains the Communes of Niger, Communes of Ayorou (as of 2001 the largest town in Department), Anzourou, Dessa, ...
,
Tillabéri Region Tillabéri (var. ''Tillabéry'') is one of the eight Regions of Niger; the capital of the Region is Tillabéri. Tillabéri Region was created in 1992, when Niamey Region was split, with Niamey and its immediate hinterland becoming a new ''capital ...
,
Niger ) , official_languages = , languages_type = National languagesNiamey Niamey () is the capital and largest city of Niger. Niamey lies on the Niger River, primarily situated on the east bank. Niamey's population was counted as 1,026,848 as of the 2012 census. As of 2017, population projections show the capital di ...
. It is being built by the ''Haut Commissariat à l'Aménagement de la Vallée du Niger'' (High Commission for Niger Valley), a public body under the Primer Minister's Office. The dam will generate hydropower and is control the flow of the Niger River, holding water during the dry season to maintain a minimum flow and making downstream irrigation possible. The project is formally named the ''Kandadji Programme for Ecosystem Regeneration and Niger River Development'' (''Programme Kandadji de Régénération des Ecosystèmes et de Mise en Valeur du Fleuve Niger'').


History

The project was first proposed in the 1970s, when a larger dam had been considered. In 1998 the African Development Bank approved funding for a feasibility study that was conducted by the German consulting firm Lahmeyer. Under the study, an environmental and social diagnosis and an initial environmental and social assessment were conducted. The findings were presented in 2002. In August 2002 the government decided by Decree to go ahead with the project, which was from that time called the Kandadji Ecosystems Regeneration and Niger Valley Development Programme. Subsequently, a detailed assessment of environmental and social impact, including a Population Resettlement Plan and a Local Development Plan, was conducted. The Local Development Plan was designed to facilitate the economic transition of displaced persons in order to restore their standard of living or even enhance it, beyond mere resettlement. The final design of the dam was prepared with financing from the
Islamic Development Bank The Islamic Development Bank ( ar, البنك الإسلامي للتنمية, abbreviated as IsDB) is a multilateral development finance institution that is focused on Islamic finance for infrastructure development and located in Jeddah, Saudi A ...
, and that of a irrigation project with financing from the
West African Development Bank The West African Development Bank - WADB (fr. Banque Ouest Africaine de Développement - BOAD / pt. Banco de Desenvolvimento do Oeste Africano - BDOA) is an international Multilateral Development Bank established in 1973 to serve the nations of F ...
. In 2005 and 2006 consultations were undertaken as part of the environmental and social assessment, which included participants from the
World Wide Fund for Nature The World Wide Fund for Nature Inc. (WWF) is an international non-governmental organization founded in 1961 that works in the field of wilderness preservation and the reduction of human impact on the environment. It was formerly named the Wor ...
and
International Union for Conservation of Nature The International Union for Conservation of Nature (IUCN; officially International Union for Conservation of Nature and Natural Resources) is an international organization working in the field of nature conservation and sustainable use of natu ...
. According to one source, construction of the dam was begun in August 2008. In April 2009 a workshop on benefit sharing from dams in West Africa was held in Niamey organized by the
Niger Basin Authority The Niger Basin Authority (french: Autorité du Bassin du Niger) is an intergovernmental organization in West Africa aiming to foster co-operation in managing and developing the resources of the basin of the Niger River. The group is referred to ...
, the
International Institute for Environment and Development International is an adjective (also used as a noun) meaning "between nations". International may also refer to: Music Albums * ''International'' (Kevin Michael album), 2011 * ''International'' (New Order album), 2002 * ''International'' (The T ...
and the
International Union for Conservation of Nature The International Union for Conservation of Nature (IUCN; officially International Union for Conservation of Nature and Natural Resources) is an international organization working in the field of nature conservation and sustainable use of natu ...
. The workshop recommended to improve the communication towards the people affected by the dam and to pay particular attention to legal processes related to resettlement, and to continue to reflect on a future management structure to equitably share the benefits of the dam. In November 2009 a process to select consultants to accompany the resettlement has been initiated. According to the World Bank, the entire Kandadji Program will be implemented in three phases: * Phase I, which started in 2009 and is expected to be completed in 2016, comprises the Kandadji dam and its reservoir, the hydro-mechanical equipment for the 18 gates, economic and local community development, and implementation of environmental and social mitigation measures for resettled people; * Phase II comprises construction of the hydropower plant, transmission lines, road, irrigated agricultural development, and expanded local and community development in the reservoir area and downstream, and * Phase III focuses on the development of irrigated agriculture and the scaling-up of the economy and local community development of the region (including fisheries, livestock, agribusiness and trade. Construction of the dam itself was contracted to Russian company Zarubezhvodstroy, which signed the construction contract in September 2010. Construction of the dam was relaunched at a ceremony on 23 May 2011, following the election of President
Mahamadou Issoufou Mahamadou Issoufou (born 1 January 1952) is a Nigerien politician who served as the President of Niger from 7 April 2011 to 2 April 2021. Issoufou was the prime minister of Niger from 1993 to 1994, president of the National Assembly from 1995 t ...
.Russian firm starts work on Niger hydro dam
Abdoulaye Massalatchi Reuters – Tue, May 24, 2011
The Kandaji Dam is the first object being constructed by a Russian company in Niger. In May 2011, the Director General of Zarubezhvodstroy, OJSC E.V. Gudzenchuk, announced "For the first time a Russian company is involved in building such a large project in West Africa at the expense of foreign investors. Zarubezhvodstroy has vast experience in the field that would allow us to meet the challenges with confidence and with great professionalism." Plans were announced in June 2011 to relocate 5383 individuals and 770 families who will be displaced by the dam. Construction of the dam was begun in August 2008. The first brick of the dam was laid by the President of Niger,
Mamadou Tandja Mamadou Tandja (1938 – 24 November 2020) was a Nigerien politician who was President of Niger from 1999 to 2010. He was President of the National Movement for the Development Society (MNSD) from 1991 to 1999 and unsuccessfully ran as the MNSD ...
.ReutersAlertNe
Niger begins building dam for food, electricity
4 August 2008
In 2008, the dam itself was expected to be completed in 2013. By 2012, the completion date had moved to September 2015. Construction has been slower than expected, with interruptions due to financing problems; as of 2019, completion is expected in 2025. Construction works were 12% complete as of September 2019.


Technical features

The earth dyke dam will be 8.4 km dam long, creating a reservoir of 1.6 billion m3 and a regulated discharge of 120 m3/s (3.8 km3/year) in Niamey. The hydroelectric plant will have a capacity of 130 megawatt, and a 132 kilovolt high voltage line will be built over 188 km to Niamey. Irrigation development will consist of a first phase of 6,000 hectares mainly for the benefit of resettled communities, with a medium-term target in 2034 of 45,000 hectares out of an irrigable potential of 122,000 hectares.


Benefits

The project is a very high-profile project for Niger. According to the Prime Minister at the time of initiating construction,
Seyni Oumarou Seyni Oumarou (born 9 August 1951
, "no other development project will have sparked so much long term interest or such high expectations". The expected benefits include increased agricultural production and hydropower generation. Niger imports almost half of its electricity consumption of (2007) from neighboring Nigeria, which itself suffers frequent power cuts. The plant would increase installed capacity in Niger from 240
Megawatt The watt (symbol: W) is the unit of Power (physics), power or radiant flux in the International System of Units, International System of Units (SI), equal to 1 joule per second or 1 kg⋅m2⋅s−3. It is used to quantification (science), ...
(MW) in 2007 to 370 MW (+55%). Other expected benefits are related to "drinking water supply, sanitation, improved flood recession cropping, grazing and fishery".AfricanManage
Saudi Fund grants US$20 million to Niger for Kandadji dam
9 January 2010


Financial costs

The financial costs of the broader project, including the infrastructure for irrigation and drinking water supply, were estimated at US$670 million by one source in 2007. Another source mentions US$942 million in 2011. The contract to build the dam itself, however, is apparently only worth Euro 130 million. According to the World Bank, the Kandadji Program (Phase I and Phase II) is expected to cost US$785 million.


Financing

Financing comes from ten sources: the African Development Bank, the Islamic Development Bank, the West African Development Bank, the Saudi Fund for Development, the Kuwait Fund for Arab Economic Development, the OPEC Fund for International Development, the Arab Bank for Economic Development in Africa, the Bank for Investment and Development of the
Economic Community of West African States The Economic Community of West African States (ECOWAS; also known as in French and Portuguese) is a regional political union, political and economic union of fifteen countries located in West Africa. Collectively, these countries comprise an ...
(ECOWAS), the French Development Agency (AFD) and the Government of Niger. Specific amounts are as follows, as far as known: * US$236 million was pledged by the
Islamic Development Bank The Islamic Development Bank ( ar, البنك الإسلامي للتنمية, abbreviated as IsDB) is a multilateral development finance institution that is focused on Islamic finance for infrastructure development and located in Jeddah, Saudi A ...
. * US$15 million was pledged by the
OPEC Fund for International Development The OPEC Fund for International Development (OPEC Fund) is an intergovernmental development finance institution established in 1976 by the member states of the Organization of the Petroleum Exporting Countries (OPEC). The OPEC Fund was conceived ...
in February 2009. * US$62 million were approved in October 2008 by the
African Development Bank The African Development Bank Group (AfDB) or (BAD) is a multilateral development finance institution headquartered in Abidjan, Ivory Coast, since September 2014. The AfDB is a financial provider to African governments and private companies i ...
through a combined loan and grant. * US$20 million were approved in January 2010 by the Saudi Development Fund. * US$200 million from the World Bank. * EUR50 million from the French Development Agency Financing for the hydropower station itself is due to come from a public-private partnership.


Environmental, social and downstream impact

Negative social impacts include the resettlement of almost 35,000 people from 15 villages, loss of infrastructure (a national road, boreholes, clinics, schools, mosques, slaughterhouses, markets and grain mills) and loss of about 7,000 ha of agricultural land. According to a 2007 report by
UNEP The United Nations Environment Programme (UNEP) is responsible for coordinating responses to environmental issues within the United Nations system. It was established by Maurice Strong, its first director, after the United Nations Conference on th ...
's Dams and Development Project, which itself was a follow-up activity to a report by the
World Commission on Dams The World Commission on Dams (WCD) existed between April 1997 and 2001, to research the environmental, social and economic impacts of the development of large dams globally. The self-styled WCD consisted of members of civil society, academia, the ...
, the Kandadji project "serves as a useful example of the projection and estimation of social effects, which appears to have been widely encompassing, covering both negative impacts and benefits". These impacts were "projected at an early stage in project planning, enabling issues and potential impacts to be addressed in subsequent planning phases". The project is expected to improve the river's ecology, which has suffered from a 30% decline in river flows since the 1970s. The dam would regulate flows. According to press reports from Nigeria, the project would reduce the river flow to Nigeria by at least 10 percent, thus jeopardizing power production from two existing dams in Nigeria and meaning a "colossal loss (...) to the agricultural capacity of (Nigerian) states that border the River Niger". However, according to the 2008 environmental assessment of the project, the "modifications of the quantities of water flowing into the Niger River as a result of the Kandadji dam will be minimal in Nigeria". The average loss through evaporation and modification of the Niger River water flows in Nigeria will be low (2.3% at Jebba) and there will be positive impacts by improving the minimum water level in Nigeria.Republic of Niger, Prime Minister’s Office, High Commission for Niger Valley / African Development Ban
"KANDADJI" ECOSYSTEMS REGENERATION AND NIGER VALLEY DEVELOPMENT PROGRAMME (KERNVDP), DETAILED ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT, EXECUTIVE SUMMARY
January 2008, p. 11


See also

* Kenié Hydroelectric Power Station


References


Further sources


Multi-purpose Projects: Kandadji Dam Niger
Lahmeyer International (2008). (Link broken)
Assessment of the environmental impacts of the Kandadji dam project: an energy choice identified under the National Energy and Sustainable Development Program
Hassane Kimba / Nigerian Association of Environmental Impact Assessment Professionals. AJEAM-RAGEE Volume 5 April 2003; 46-54 (Link broken)
Haut Commissariat au Barrage de Kandadji (official site)
Republique du Niger: Cabinet du Premier Ministre. Retrieved 2009-02-01. (Link broken) *Niger - Evaluation de l'effet du barrage de Kandadji sur les pêcheries du fleuve Niger. Un rapport préparé pour le projet assistance a l'Autorité du Barrage de Kandadji (ABK); Document de travail 1. (French) Welcomme, R.L., / FAO, Rome (Italy). Fisheries Dept., 1981, 7 p. Report No: FAO-FI—TCP/NER/0103(MA) * Jamie Skinne
Niger: Tough questions posed by the Kandadji dam development
International Institute for Environment and Development, 19 April 2013 {{stack, {{Portal, Water, Renewable energy Hydroelectric power stations in Niger Dams in Niger Niger River Dams under construction