Federal Energy Regulatory Commission
   HOME

TheInfoList



OR:

The Federal Energy Regulatory Commission (FERC) is an independent agency of the United States government that regulates the interstate transmission and wholesale sale of
electricity Electricity is the set of physical phenomena associated with the presence and motion of matter possessing an electric charge. Electricity is related to magnetism, both being part of the phenomenon of electromagnetism, as described by Maxwel ...
and
natural gas Natural gas (also fossil gas, methane gas, and gas) is a naturally occurring compound of gaseous hydrocarbons, primarily methane (95%), small amounts of higher alkanes, and traces of carbon dioxide and nitrogen, hydrogen sulfide and helium ...
and regulates the prices of interstate transport of
petroleum Petroleum, also known as crude oil or simply oil, is a naturally occurring, yellowish-black liquid chemical mixture found in geological formations, consisting mainly of hydrocarbons. The term ''petroleum'' refers both to naturally occurring un ...
by
pipeline A pipeline is a system of Pipe (fluid conveyance), pipes for long-distance transportation of a liquid or gas, typically to a market area for consumption. The latest data from 2014 gives a total of slightly less than of pipeline in 120 countries ...
. FERC also reviews proposals to build interstate natural gas pipelines, natural gas storage projects, and
liquefied natural gas Liquefied natural gas (LNG) is natural gas (predominantly methane, CH4, with some mixture of ethane, C2H6) that has been cooled to liquid form for ease and safety of non-pressurized storage or transport. It takes up about 1/600th the volume o ...
(LNG) terminals, in addition to licensing non-federal hydropower projects. FERC was created by the
U.S. Congress The United States Congress is the legislative branch of the federal government of the United States. It is a bicameral legislature, including a lower body, the U.S. House of Representatives, and an upper body, the U.S. Senate. They both ...
in 1977 in the aftermath of the
1973 oil crisis In October 1973, the Organization of Arab Petroleum Exporting Countries (OAPEC) announced that it was implementing a total oil embargo against countries that had supported Israel at any point during the 1973 Yom Kippur War, which began after Eg ...
. FERC is an independent agency, despite being part of the U.S. Department of Energy. It is headed by five commissioners who are nominated by the
U.S. president The president of the United States (POTUS) is the head of state and head of government of the United States. The president directs the Federal government of the United States#Executive branch, executive branch of the Federal government of t ...
and confirmed by the U.S. Senate. There may be no more than three commissioners of one political party serving on the commission at any given time.


Primary duties

The responsibilities of FERC include the following: * Regulating the transmission and sale of natural gas for resale in
interstate commerce The Commerce Clause describes an enumerated power listed in the United States Constitution ( Article I, Section 8, Clause 3). The clause states that the United States Congress shall have power "to regulate Commerce with foreign Nations, and amon ...
; * Regulating the transmission of oil by pipelines in interstate commerce; * Regulating the transmission and wholesale sales of electricity in interstate commerce; * Licensing and inspecting private, municipal, and state hydroelectric projects; * Approving the siting of and abandonment of interstate natural gas facilities, including pipelines, storage and
liquefied natural gas Liquefied natural gas (LNG) is natural gas (predominantly methane, CH4, with some mixture of ethane, C2H6) that has been cooled to liquid form for ease and safety of non-pressurized storage or transport. It takes up about 1/600th the volume o ...
; * Ensuring the reliability of high voltage interstate transmission system; * Monitoring and investigating energy markets; * Using civil penalties and other means against energy organizations and individuals who violate FERC rules in the energy markets; * Overseeing environmental matters related to natural gas and hydroelectricity projects and major electricity policy initiatives; and * Administering accounting and financial reporting regulations and regulating businesses of regulated companies.


Jurisdiction and authorities

FERC is a large
independent regulatory agency A regulatory agency (regulatory body, regulator) or independent agency (independent regulatory agency) is a government agency, government authority that is responsible for exercising autonomous jurisdiction over some area of human activity in a l ...
, within the
United States Department of Energy The United States Department of Energy (DOE) is an executive department of the U.S. federal government that oversees U.S. national energy policy and energy production, the research and development of nuclear power, the military's nuclear w ...
, that participates in business oversight. The
President President most commonly refers to: *President (corporate title) * President (education), a leader of a college or university *President (government title) President may also refer to: Arts and entertainment Film and television *'' Præsident ...
and
Congress A congress is a formal meeting of the representatives of different countries, constituent states, organizations, trade unions, political parties, or other groups. The term originated in Late Middle English to denote an encounter (meeting of ...
do not generally review FERC decisions, but the decisions are reviewable by the federal courts. FERC is self-funding, in that Congress sets its budget through annual and supplemental appropriations and FERC is authorized to raise revenue to reimburse the
United States Treasury The Department of the Treasury (USDT) is the national treasury and finance department of the federal government of the United States. It is one of 15 current U.S. government departments. The department oversees the Bureau of Engraving and ...
for its appropriations, through annual charges to the natural gas, oil, and electric industries it regulates. FERC is independent of the Department of Energy political structure because FERC activities "shall not be subject to further view by the Secretary f Energyor any officer or employee of the Department". The Department of Energy can, however, participate in FERC proceedings as a third party. FERC has promoted voluntary formation of
regional transmission organization A regional transmission organization (RTO) in the United States is an electric power transmission system operator (TSO) that coordinates, controls, and monitors a multi-state electric grid. The transfer of electricity between states is consider ...
s (RTOs) and
Independent System Operator A regional transmission organization (RTO) in the United States is an electric power transmission system operator (TSO) that coordinates, controls, and monitors a multi-state electric grid. The transfer of electricity between states is consider ...
s (ISOs) to eliminate the potential for undue discrimination in access to the
electric grid An electrical grid (or electricity network) is an interconnected network for electricity delivery from producers to consumers. Electrical grids consist of power stations, electrical substations to step voltage up or down, electric power tran ...
; it has made key decisions expanding its own power in regional and interregional transmission planning and cost allocation through the landmark Order Nos. 1000, 1920, 1977, and 2023. FERC investigated the alleged manipulation of
electricity market An electricity market is a system that enables the exchange of electrical energy, through an electrical grid. Historically, electricity has been primarily sold by companies that operate electric generators, and purchased by consumers or electr ...
by
Enron Enron Corporation was an American Energy development, energy, Commodity, commodities, and services company based in Houston, Texas. It was led by Kenneth Lay and developed in 1985 via a merger between Houston Natural Gas and InterNorth, both re ...
and other energy companies, and their role in the
California electricity crisis California () is a U.S. state, state in the Western United States that lies on the West Coast of the United States, Pacific Coast. It borders Oregon to the north, Nevada and Arizona to the east, and shares Mexico–United States border, an ...
. FERC has collected more than $6.3 billion from California electric market participants through settlements. Since passage of the
Energy Policy Act of 2005 The Energy Policy Act of 2005 () is a federal law signed by President George W. Bush on August 8, 2005, at Sandia National Laboratories in Albuquerque, New Mexico. The act, described by proponents as an attempt to combat growing energy problems ...
, FERC has imposed, through settlements and orders, more than $1 billion in civil penalties and disgorgement of unjust profits to address violations of its anti-
market manipulation In economics and finance, market manipulation occurs when someone intentionally alters the supply or demand of a security to influence its price. This can involve spreading misleading information, executing misleading trades, or manipulating ...
and other rules. FERC regulates approximately 1,600 hydroelectric projects in the U.S. It is largely responsible for permitting construction of a large network of interstate natural gas pipelines. FERC also works closely with the
United States Coast Guard The United States Coast Guard (USCG) is the maritime security, search and rescue, and Admiralty law, law enforcement military branch, service branch of the armed forces of the United States. It is one of the country's eight Uniformed services ...
to review the safety, security, and environmental impacts of proposed LNG terminals and associated shipping.


Commissioners

FERC is composed of up to five commissioners who are appointed by the President and confirmed by the Senate to staggered five-year terms. The President appoints one of the commissioners to be the chairman of FERC, the administrative head of the agency. FERC is a bipartisan body; no more than three commissioners may be of the same political party. Commissioners may continue in office past the end of their term if a successor has not yet been confirmed, up to the end of the current session of Congress. The commissioners are:


Past commissioners


Chairperson


History


Federal Power Commission

The
Federal Power Commission The Federal Power Commission (FPC) was an independent commission of the United States government, originally organized on June 23, 1930, with five members nominated by the president and confirmed by the Senate. The FPC was originally created in ...
(FPC), which preceded FERC, was established by Congress in 1920 to allow cabinet members to coordinate federal hydropower development. In 1935, the FPC was transformed into an
independent regulatory agency A regulatory agency (regulatory body, regulator) or independent agency (independent regulatory agency) is a government agency, government authority that is responsible for exercising autonomous jurisdiction over some area of human activity in a l ...
with five members nominated by the
President President most commonly refers to: *President (corporate title) * President (education), a leader of a college or university *President (government title) President may also refer to: Arts and entertainment Film and television *'' Præsident ...
and confirmed by the
Senate A senate is a deliberative assembly, often the upper house or chamber of a bicameral legislature. The name comes from the ancient Roman Senate (Latin: ''Senatus''), so-called as an assembly of the senior (Latin: ''senex'' meaning "the el ...
. The FPC was authorized to regulate both hydropower and interstate electricity.


Natural Gas Act of 1938

In 1938, the Natural Gas Act gave FPC jurisdiction over interstate natural gas pipelines and wholesale sales. In 1942, this jurisdiction was expanded to cover the licensing of more natural gas facilities. In 1954, the Supreme Court decision in '' Phillips Petroleum Co. v. Wisconsin'' extended FPC jurisdiction over all wellhead sales of natural gas in interstate commerce.


Birth of DOE; FPC Becomes FERC

In response to the 1973 oil crisis,
Congress A congress is a formal meeting of the representatives of different countries, constituent states, organizations, trade unions, political parties, or other groups. The term originated in Late Middle English to denote an encounter (meeting of ...
passed the Department of Energy Organization Act in 1977, to consolidate various energy-related agencies into a Department of Energy. Congress insisted that a separate independent regulatory body be retained, and the FPC was renamed the Federal Energy Regulatory Commission (FERC), preserving its independent status within the department. Its most basic mandate was to "determine whether wholesale electricity prices were unjust and unreasonable and, if so, to regulate pricing and order refunds for overcharges to ratepayers." FERC was also given added responsibility to hear appeals of DOE oil price control determinations and to conduct all "on the record" hearings for DOE. As a result, DOE does not have any
administrative law judge An administrative law judge (ALJ) in the United States is a judge and trier of fact who both presides over trials and adjudicates claims or disputes involving administrative law, thus involving administrative units of the executive branch of go ...
s. As a further protection, when the Department of Energy proposes a rule, it must refer the proposal to FERC, and FERC can take over the proceeding if FERC determines that the rulemaking "may significantly affect" matters in its jurisdiction. The DOE Act also transferred the regulation of interstate oil pipelines from the
Interstate Commerce Commission The Interstate Commerce Commission (ICC) was a regulatory agency in the United States created by the Interstate Commerce Act of 1887. The agency's original purpose was to regulate railroads (and later Trucking industry in the United States, truc ...
to FERC. However, the FERC lost some jurisdiction over the imports and exports of gas and electricity. In 1978, FERC was given additional responsibilities for harmonizing the regulation of wellhead gas sales in both the intrastate and interstate markets. FERC also administered a program to foster new
cogeneration Cogeneration or combined heat and power (CHP) is the use of a heat engine or power station to generate electricity and useful heat at the same time. Cogeneration is a more efficient use of fuel or heat, because otherwise- wasted heat from elec ...
and small power production under the Public Utilities Regulatory Policy Act of 1978, which was passed as part of the National Energy Act of 1978. The National Energy Act included the Natural Gas Policy Act of 1978, which reduced the scope of federal price regulation, to bring greater competition to both the natural gas and electric industry. In 1989, Congress ended federal regulation of wellhead natural gas prices, with the passage of the Natural Gas Wellhead Decontrol Act of 1989.


Order No. 888

In 1996, FERC issued Order No. 888, which spurred the creation of
regional transmission organization A regional transmission organization (RTO) in the United States is an electric power transmission system operator (TSO) that coordinates, controls, and monitors a multi-state electric grid. The transfer of electricity between states is consider ...
s in the United States. This would impact existing electric power pools by rebranding themselves as independent transmission operators. Electric utilities in some regions began to spin off their generation units as separate companies that would compete in a wholesale electric market administered by the RTOs. Once FERC had created the framework for Regional Transmission Organizations with Order No. 888, several such RTOs were approved. The pre-existing multi-state power pool called PJM (Pennsylvania, Jersey, Maryland), the New York Independent System Operator (NYISO), and the Independent Sysoperator New England (ISO-NE) were early adopters. California, with the backing of its state and Congressional policymakers, sought approval of a controversial scheme to set up its ISO, called California ISO, based near Sacramento, CA. FERC approved it without changes because California had warned that it would not accept any changes. Enron charged one of its policy analysts to figure out how to make the most of the flawed rules put in place for the California electricity market. Enron had success with its fraudulent market transactions.


Energy Policy Act of 2005

In 2001, the
George W. Bush George Walker Bush (born July 6, 1946) is an American politician and businessman who was the 43rd president of the United States from 2001 to 2009. A member of the Bush family and the Republican Party (United States), Republican Party, he i ...
administration sought to give the authority of eminent domain to FERC to circumvent state and local bureaucratic processes which often slowed the siting of new transmission projects. This expansion of power was most fiercely opposed by Bush's own Republican party as being an expansion of federal power. Legal battles over the issue ended with the 2005 Energy Bill (
Energy Policy Act of 2005 The Energy Policy Act of 2005 () is a federal law signed by President George W. Bush on August 8, 2005, at Sandia National Laboratories in Albuquerque, New Mexico. The act, described by proponents as an attempt to combat growing energy problems ...
) which was passed with approval of Democrats and Republicans. The Energy Policy Act of 2005 expanded FERC's authority to protect the reliability and cybersecurity of the bulk power system through the establishment and enforcement of mandatory standards, as well as greatly expanding FERC authority to impose civil penalties on entities that manipulate the electricity and natural gas markets. The Energy Policy Act of 2005 also gave FERC additional responsibilities and authority. Among the many provisions of the law, FERC was given what is known as "backstop" siting authority which allows FERC to overrule any denial of transmission projects by a state within established corridors of transmission congestion "to expand transmission in limited regions of the country facing transmission constraints."


Order No. 1000

In 2010, FERC issued Order No. 1000, which required RTOs to create regional transmission plans and identify transmission needs based on public policy. Cost allocation reforms were included, possibly to reduce barriers faced by non incumbent transmission developers.


Order No. 841

In February 2018, FERC issued Order No. 841, which required wholesale markets to open up to individual storage installations, regardless of interconnection point (transmission, distribution or behind-the-meter). The Order was challenged in court by the state public utility commissions via the National Association of Regulatory Utility Commissioners (NARUC), the
American Public Power Association The American Public Power Association (APPA) is the service organization for approximately 2,000 U.S. community-owned electric utilities that serve more than 50 million Americans. APPA was created in September 1940 to represent the common inter ...
, and others who claimed that FERC overstepped its jurisdiction by regulating how local electric distribution and behind-the-meter facilities are administered, i.e., in not providing an opt out of wholesale market access for energy storage facilities located at the distribution level or behind-the-meter. A United States courts of appeals court (the D.C. Circuit) issued an order in July 2020 that upheld Order 841 and dismissed the petitioners' complaints.


Order No. 2222

FERC issued Order No. 2222 on September 17, 2020, enabling
distributed energy resources Distributed generation, also distributed energy, on-site generation (OSG), or district/decentralized energy, is electrical generation and storage performed by a variety of small, grid-connected or distribution system-connected devices referred ...
such as batteries and
demand response Demand response is a change in the power consumption of an electric utility customer to better match the demand for power with the supply. Until the 21st century decrease in the cost of pumped storage and batteries, electric energy could not b ...
to participate in regional wholesale electricity markets. Market operators submitted initial compliance plans by early 2022. The Supreme Court had ruled in 2016 in '' FERC v. Electric Power Supply Ass'n'' that the agency had the authority to regulate
demand response Demand response is a change in the power consumption of an electric utility customer to better match the demand for power with the supply. Until the 21st century decrease in the cost of pumped storage and batteries, electric energy could not b ...
transactions.


Order No. 2023

On July 28, 2023, the Federal Energy Regulatory Commission issued Order No. 2023, which regulates the interconnection process that ties renewables projects into the large-scale grid. Among other provisions, the rule requires transmission planners to consolidate projects into 'clusters' for regulatory approval purposes on a 'first-ready, first-served' basis that prioritizes the most well-studied and fully financed projects, spread grid upgrade costs over multiple projects, forecast advanced technologies, and allow for multiple projects to share a new single interconnection point. It also "imposes firm deadlines and penalties if transmission providers fail to complete interconnection studies on time". On March 21, 2024, FERC issued Order No. 2023-A, an amendment clarifying certain provisions in the order, such as compliance filing requirements, the deadline for utilities to edit interconnect requests upon submission, the role of substation use in determining cost allocation, and the use of surety bonds in financing.


Order Nos. 1920 and 1977

On May 13, 2024, FERC issued Order Nos. 1920 and 1977. The former order requires utilities to plan 20 years in advance to anticipate future regional (though not interregional) transmission needs, with five-year updates, and to cooperate in creating a default cost-sharing plan to deliver to state regulators. It "provides for cost-effective expansion of transmission that is being replaced, when needed, known as 'right-sizing' transmission facilities", and it allows states more opportunities to cooperate with utility companies and energy project developers, while preventing states that benefit from regional transmission projects from not paying for them. FERC Order No. 1920-A, an amendment to it passed unanimously the following November, allows state regulators even more opportunities to provide input on interstate grid projects, adds six months to the cost allocation negotiating process, and gives utilities more leeway to forecast additional needs scenarios. The latter order affirms FERC's siting authority in National Interest Electric Transmission Corridors if a state regulatory agency denies any of its own siting responsibility thereof. The order creates an Applicant Code of Conduct to encourage proper landowner outreach, and adds air quality,
environmental justice Environmental justice is a social movement that addresses injustice that occurs when poor or marginalized communities are harmed by hazardous waste, resource extraction, and other land uses from which they do not benefit. The movement has gene ...
and tribal engagement reports to the list of requirements for project applicants.


Criticism

FERC has been subject to criticism and increasing activism by people from communities affected by its decisions approving pipeline and related projects.FERC faces heightened scrutiny as gas projects proliferate, Hannah Northey, E&E, November 3, 2014. They contend that FERC "blithely greenlights too many pipelines, export terminals and other gas infrastructure" and that FERC's structure in which it recovers its annual operating costs directly from the entities it regulates creates bias in favor of the issuance of pipeline certificates.Delaware Riverkeepers Network v. Federal Energy Regulatory Commission, No. 16-CU-416 (D. D.C. March 22, 2017). Some of the critics have disrupted several regular open meetings of the Commission and staged a couple of week-long blockades of FERC's headquarters in Washington, D.C., to make their points. "Pipelines are facing unprecedented opposition," Commissioner LaFleur remarked to the National Press Club in a 2015 speech. "We have a situation here." FERC's decisions in those cases are often upheld by the courts. In a July 1, 2014, decision, ''No Gas Pipeline v. Federal Energy Regulatory Commission'', the United States Court of Appeals for the District of Columbia Circuit (D.C. Circuit) said that pipeline applicants are not likely to pursue many certificates that are hopeless. "The fact that they generally succeed in choosing to expend their resources on applications that serve their own financial interests does not mean that an agency which recognizes merit in such applications is biased," the court said. Others have directly disputed FERC's critics by pointing out, "FERC is a creature of law. It follows a careful administrative path to regulate only a portion of natural gas such as interstate pipelines and LNG import and export terminals. That regulation includes extensive environmental review, driven by many federal laws enacted by Congress, signed by the president, and reviewed and upheld by the U.S. Supreme Court. If the agency were to adopt the path uggested by these critics FERC's decisions would routinely be overturned by the federal courts." The United States District Court for the District of Columbia also dismissed a case involving allegations of structural bias on the part of FERC. The plaintiffs contended that the Omnibus Budget Act of 1986 funding mechanism requires the commission to recover its budget through proportional charges on regulated entities, therefore making FERC biased in favor of the industry from which it gets its funding. But in an order issued March 22, 2017, the court said the plain language of the statute indicates that FERC does not have control over its own budget. "The Commission's budget cannot be increased by approving pipelines; rather, he statuterequires the Commission to make adjustments to 'eliminate any overrecovery or underrecovery.' If Plaintiffs are unhappy with Congress's chosen appropriations to the Commission..., Plaintiffs' recourse lies with their legislative representatives." In New Jersey, the FERC approval of the PennEast Pipeline was met with widespread criticism by environmental groups, which called the decision highly partisan. "FERC has once again demonstrated its tremendous bias for, and partnership with, the pipeline industry," said Maya van Rossum, leader of the Delaware Riverkeeper Network. Doug O'Malley, president of Environment New Jersey, called the FERC approval of the pipeline a "disaster." David Pringle, state campaign director of Clean Water Action and 2018 Congressional candidate, suggested the FERC was serving a partisan interest over the interests of the people of New Jersey, suggesting "The FERC needs to remember it works for the people of the United States not PennEast." These criticisms were unfounded as the D.C. Circuit Court of Appeals on July 10, 2018, rejected the Delaware Riverkeeper Network and Maya Van Rossum's claim that FERC has an incentive to award pipeline certificates because it collects its operating expenses from regulated parties. Upholding a lower court ruling, the D.C. Circuit also rejected the Delaware Riverkeeper Network's challenge to FERC's use of tolling orders to meet its statutory deadlines for acting on rehearing applications. However, the D.C. Circuit has provided additional guidance concerning Commission procedures, stating that in one case FERC failed to consider the cumulative environmental impact of four projects that had been separately proposed by the same pipeline. The D.C. Circuit held that the projects were not financially independent and were "a single pipeline" that was "linear and physically interdependent," so the cumulative environmental impacts should have been considered concurrently. In a separate decision, the D.C. Circuit later sustained the commission's conduct of separate environmental assessments when it clarified that the "critical" factor was that all of the pipeline's projects were either under construction or pending before FERC for environmental review at the same time, noting that the projects lacked temporal overlap. Furthermore, in another case, the D.C. Circuit sustained the commission's use of a separate environmental assessment when it reasoned that the projects in dispute were "unrelated" and did not depend on one another for their justification. This guidance has allowed FERC to address additional claims of improper segmentation. FERC's leaders have stressed many times since the onset of the increased activism that the proper way to oppose a proposed new infrastructure project is by participating in the related proceeding by submitting comments and participating in public comment sessions, site visits and scoping meetings, since FERC decisions can be appealed up to the Supreme Court.


Federal versus state authority

There are regions of the country where the state public utility commission and the FERC regulated Regional Transmission Organization operate in identical footprints (such as in New York State). Where this occurs, state policy makers and FERC frequently clash as to the extent of federal power and influence within the state. The planning and siting of public policy and renewable power plants and merchant transmission lines can be contentious, because the planning process must proceed through both entities. For example, in New York State, any large (more than 20 MW for the NYISO or 2 MW for the state Siting Committee) generation or merchant transmission facility must proceed through both the planning process of the NYISO, which operates on a two-year cycle at minimum with an inclusive class year pool of new projects evaluated simultaneously, and the siting process of the state Board on Electric Siting and the Environment. Prior to the formation of the NYISO, the planning process was determined mostly by the state siting board (although the utilities' power pool might have had its own closed door planning session) and large generation projects were developed by the utilities themselves. The dual planning process provides an opportunity for other market participants to drag out the process legally, not including the other state and/or federal environmental, trade (if an international connection with Canada is requested), and local certification and regulation processes that need to be met. The controversy similarly applies to various electric wholesale-market issues within the RTO, when a state public utility commission asserts that its retail ratepayers (under state regulation) will be impacted by wholesale-market stakeholder decisions and reforms (under federal-level regulation). In contrast, prior to the formation of the NYISO in 1999 in New York, wholesale energy prices were set within a utility's state rate case proceeding. Examples of contentious issues in New York include the NYISO's development of buyer-side mitigation (price floors) in its capacity market, proxy peaking-unit specifications during the demand-curve reset (that helps set capacity market prices), the state's granting of zero-emissions credits to wholesale-market participating nuclear power plants, and the creation of a new capacity zone amidst state and transmission owner policy initiatives.


See also

* :Federal Energy Regulatory Commission chairpersons * 21st-century fossil fuel regulations in the United States * Custody transfer *
High-voltage direct current A high-voltage direct current (HVDC) electric power transmission system uses direct current (DC) for electric power transmission, in contrast with the more common alternating current (AC) transmission systems. Most HVDC links use voltages betwe ...
*
North American Electric Reliability Corporation The North American Electric Reliability Corporation (NERC) is a nonprofit corporation based in Atlanta, Georgia, and formed on March 28, 2006, as the successor to the North American Electric Reliability Council (also known as NERC). The original ...
(NERC) *
United States energy law United States energy law is a function of the federal government, states, and local governments. At the federal level, it is regulated extensively through the United States Department of Energy. Every state, the federal government, and the Distri ...
* '' Scenic Hudson Preservation Conference v. Federal Power Commission'' * Title 18 of the Code of Federal Regulations * directing FERC to mandate minimum interregional capacity


References


Further reading

* Gies, Erica
Making the Consumer an Active Participant in the Grid
''
The New York Times ''The New York Times'' (''NYT'') is an American daily newspaper based in New York City. ''The New York Times'' covers domestic, national, and international news, and publishes opinion pieces, investigative reports, and reviews. As one of ...
'', November 29, 2010. Discusses
distributed generation Distributed generation, also distributed energy, on-site generation (OSG), or district/decentralized energy, is electrical generation and storage performed by a variety of small, grid-connected or distribution system-connected devices referred ...
and the U.S. Federal Energy Regulatory Commission. *


External links


Official site
*
Electricity
*
LNG Terminals
*
Natural Gas
*
Hydroelectric

Federal Energy Regulatory Commission
in the
Federal Register The ''Federal Register'' (FR or sometimes Fed. Reg.) is the government gazette, official journal of the federal government of the United States that contains government agency rules, proposed rules, and public notices. It is published every wee ...
{{Authority control 1977 establishments in the United States Electric grid interconnections in North America Government agencies established in 1977 Energy regulatory authorities