Corridor ID Program
   HOME

TheInfoList



OR:

The Corridor Identification and Development Program, abbreviated as the Corridor ID Program, is a comprehensive planning program for inter-city passenger rail projects in the United States administered by the
Federal Railroad Administration The Federal Railroad Administration (FRA) is an agency in the United States Department of Transportation (DOT). The agency was created by the Department of Transportation Act of 1966. The purpose of the FRA is to promulgate and enforce railroa ...
(FRA) under the 2021
Infrastructure Investment and Jobs Act The Infrastructure Investment and Jobs Act (IIJA), also known as the Bipartisan Infrastructure Law (BIL),H.R. 3684 is a United States federal statute enacted by the 117th United States Congress and signed into law by President Joe Biden on Nov ...
(IIJA). Each route accepted into the program is granted $500,000 toward planning activities and is prioritized for future federal funding. , a total of 69 passenger rail corridors have been accepted into the Corridor ID Program. Of these, 7 are new
high-speed rail High-speed rail (HSR) is a type of rail transport network utilising trains that run significantly faster than those of traditional rail, using an integrated system of specialised rolling stock and dedicated railway track, tracks. While there is ...
routes, 34 are new conventional rail routes, 13 are existing routes with proposed extensions, and 15 are existing routes with proposed upgrades. For example, accepted projects include
Brightline West Brightline West is a proposed privately run high-speed rail route, currently in early construction, to link the Las Vegas Valley and Rancho Cucamonga in Greater Los Angeles through the California high desert via Interstate 15. The line will ...
high-speed rail, the ''
Northern Lights Express The Northern Lights Express (NLX) project is a planned higher-speed rail service that would run between Minneapolis and Duluth primarily in the U.S. state of Minnesota. A portion of the proposed line would run through neighboring Wisconsin to ...
'' from Minneapolis to Duluth, the ''
Heartland Flyer The ''Heartland Flyer'' is a daily passenger train that follows a route between Oklahoma City, Oklahoma, and Fort Worth, Texas. It is operated by Amtrak and jointly funded by the states of Oklahoma and Texas. The train's daily round-trip begin ...
'' extension from Oklahoma City to Newton, and frequency increases for the and .


History

The $1.8 billion Corridor ID Program was authorized by Congress with the passage of the IIJA in November 2021 and was formally established in May 2022. The FRA began soliciting its first round of applications in December 2022 and made its first selection of 69 corridors in December 2023.


Program

The purpose of the Corridor ID Program is to identify potential passenger rail expansion projects and to provide seed funding for planning stages. Construction and operational funding are not included. Eligible entities are invited to submit projects for consideration. Such entities include
Amtrak The National Railroad Passenger Corporation, Trade name, doing business as Amtrak (; ), is the national Passenger train, passenger railroad company of the United States. It operates intercity rail service in 46 of the 48 contiguous United Stat ...
, regional rail authorities, states, groups of state, state subdivisions, regional planning organizations, and
federally recognized tribes This is a list of federally recognized tribes in the contiguous United States. There are also federally recognized Alaska Native tribes. , 574 Indian tribes are legally recognized by the Bureau of Indian Affairs (BIA) of the United States.
. Once selected, each corridor is initially granted $500,000 toward project planning activities. Projects proceed through three steps: * Step 1: Determination of the scope, schedule, and cost estimate for preparing a Service Development Plan * Step 2: Preparation of the Service Development Plan. This plan must list details including train frequencies, peak and average operating speeds, trip times, station locations, capital projects, rolling stock needs, economic impacts, environmental benefits, and the project schedule. These grants require a 10% match from entities. * Step 3: Project development work readying the Service Development Plan for implementation, such as environmental impact statements and engineering design. Step 3 awardees must input a 20% match.


List of corridors

This list is current . A total of 69 passenger rail corridors spanning 44 states have been accepted into the Corridor ID Program. ;Legend : : : :


References

{{reflist


External links


Corridor Identification and Development Program
, FRA Government programs Rail transportation in the United States