The William H. Zimmer Power Station, located near
Moscow, Ohio Moscow is a village in Clermont County, Ohio. The population was 185 at the time of the 2010 census. The William H. Zimmer Power Station, a coal-fired power plant was converted from a planned nuclear power plant during construction. It is par ...
, was a 1.35-gigawatt (1,351 MW)
coal power plant A coal-fired power station or coal power plant is a thermal power station which burns coal to generate electricity. Worldwide, there are about 8,500 coal-fired power stations totaling over 2,000 gigawatts capacity. They generate about a th ...
. Planned by Cincinnati Gas and Electric (CG&E) (a forerunner of Duke Energy), with Columbus & Southern Ohio Electric (a forerunner of
American Electric Power American Electric Power (AEP), (railcar reporting mark: AEPX) is a major investor-owned electric utility in the United States, delivering electricity to more than five million customers in 11 states. AEP ranks among the nation's largest g ...
(AEP)) and
Dayton Power & Light DP&L Inc. is a subsidiary of AES Corporation. Through its subsidiaries The Dayton Power and Light Company and DPL Energy Resources, DP&L sells to, and generates electricity for, a customer base of over 500,000 people within a area of West Central ...
(DP&L) as its partners, it was originally intended to be a nuclear power plant. Although once estimated to be 97% complete, poor construction and quality assurance (QA) led to the plant being converted to coal-fired generation. The plant began operations in 1991. Today, the plant is owned and operated by Vistra Corp.


History


Construction

The construction of Zimmer was a consortium of CG&E, Columbus & Southern Ohio Electric, and DP&L. The project was announced in 1969 with a cost of $420 million to construct two 840 MW nuclear power units with completion dates set for 1975 and 1976. The plant is named after William H. Zimmer, who was chairman and president of CG&E from 1962 to 1975. Construction of the plant did not start until 1972 because the Atomic Energy Commission (AEC) demanded stricter standards to approve of nuclear plants. The second proposed unit was upgraded from 840 MW to 1,170 MW in 1974.
General Electric General Electric Company (GE) is an American multinational conglomerate founded in 1892, and incorporated in New York state and headquartered in Boston. The company operated in sectors including healthcare, aviation, power, renewable en ...
's BWRs were chosen for the plant's nuclear reactors. Ultimately, the second unit was never constructed due to regulatory issues and costs. An investigation into the construction of Zimmer began in 1978. A worker charged that a welding contractor did defective work below nuclear safety standards. CG&E's lawyers placed blame on the contractor for not picking up on the defective work. In 1980 the ''
Chicago Sun-Times The ''Chicago Sun-Times'' is a daily newspaper published in Chicago, Illinois, United States. Since 2022, it is the flagship paper of Chicago Public Media, and has the second largest circulation among Chicago newspapers, after the ''Chicago ...
'' reported accusations of a cover-up by CG&E of time-card falsifications and the installation of defective piping in one of the plant's safety systems. As a result, the Nuclear Regulatory Commission (NRC) fined CG&E $200,000 for a faulty quality assurance program in 1981. The constructor was Kaiser Engineering whereas the primary owner, CG&E, did its own procurement, awarding contracts for equipment, and quality assurance requirements. The NRC, under pressure from the
Government Accountability Project The Government Accountability Project (GAP) is a nonprofit whistleblower protection and advocacy organization in the United States. It was founded in 1977. Activities In 1992, GAP represented Aldric Saucier, who had lost his job and security c ...
(GAP) to reopen the investigation, eventually ordered work on the nuclear reactor to halt in 1982. The
Federal Bureau of Investigation The Federal Bureau of Investigation (FBI) is the domestic intelligence and security service of the United States and its principal federal law enforcement agency. Operating under the jurisdiction of the United States Department of Justice, ...
(FBI) launched an investigation into the plant's safety records and harassment of inspectors. CG&E, AEP and DP&L announced the cancellation of the Zimmer Nuclear Power Plant in 1983. Zimmer's total sunk costs amounted to roughly $1.6 billion; CG&E's share was $716 million, nearly 90% of the utility's 1982 net worth. Retired Navy Admiral Joe Williams Jr. was hired to bring the plant on-line, and Bechtel was retained to nuclear-qualify the plant. Bechtel came in with an estimate of more than $1.5 billion—beyond the $1.6 billion already spent—to adequately complete the plant.


Conversion to Coal

Originally expected to cost $240 million for one unit, when the cost estimate soared to at least $3.1 billion, the decision was made in January 1984 to convert the mothballed plant into a coal-fired generated plant. Sargent & Lundy, who was the architect/engineering firm, and General Electric were sued by the three utilities in July 1984. The utilities sought $400 million in damages asserting the defective equipment caused extra costs for the construction of Zimmer. The lawsuit was settled in November 1987 with Sargent & Lundy agreeing to pay $27.4 million to the utilities. The utilities agreed to pay $12.7 million to Sargent & Lundy. Converting Zimmer into a coal power plant began in March 1987. During the conversion of the plant from nuclear to coal, the Little Indian Creek was routed through the plant to protect fish populations. The plant now has several unique environmental protection features to keep the creek at its natural state. In addition, mussels along the riverbed at Zimmer were relocated upstream. After $3.3 billion in expenditures, the world's first nuclear-to-coal power plant was completed in 1991. A tornado struck Zimmer on March 2, 2012 causing damages to surrounding buildings at the plant and electrical towers, fortunately no one at the plant was injured. The power plant continued generating electricity as repairs were made. Duke Energy sold its stake in Zimmer to Dynegy in 2014. AEP sold its 25% stake in Zimmer to Dynegy for a swap of Dynegy's stake in Conesville Power Plant in February 2017. In April 2017, Dynegy was given sole ownership of Zimmer when DP&L announced it would sell its 28% stake to Dynegy. Zimmer would become owned by Vistra Energy after Vistra's merger with Dynegy in 2018. In March 2020, Vistra Energy would settle with the Environmental Protection Agency (EPA) over a period of two decades of exceeding its emission operating limits. Vistra would pay a $600,000 fine to the
Department of Justice A justice ministry, ministry of justice, or department of justice is a ministry or other government agency in charge of the administration of justice. The ministry or department is often headed by a minister of justice (minister for justice in a ...
(DOJ), retrofit $45,000 in energy efficient lighting at a nearby school, and replace three school buses that are cleaner-burning.


Retirement

In September 2020, Vistra announced it would be retiring the Zimmer plant by year-end 2027. On July 19, 2021, Vistra announced the plant will shut down five years earlier, on May 31, 2022, because they failed to secure any capacity revenues in the May 2021
wholesale electricity market In a broad sense, an electricity market is a system that facilitates the exchange of electricity-related goods and services. During more than a century of evolution of the electric power industry, the economics of the electricity markets had un ...
auction held by the grid operator,
PJM Interconnection PJM Interconnection LLC (PJM) is a regional transmission organization (RTO) in the United States. It is part of the Eastern Interconnection grid operating an electric transmission system serving all or parts of Delaware, Illinois, Indiana, Kent ...
.


Equipment

Zimmer utilizes equipment from the old nuclear plant in conjunction with the coal conversion equipment. The original Westinghouse high-pressure/low-pressure turbine was modified and the high-pressure section was removed. The General Electric reactor was to generate 840 MW per the original nuclear design.
ASEA Brown Boveri ABB Ltd. is a Swedish-Swiss multinational corporation headquartered in Zürich, Switzerland. The company was formed in 1988 when Sweden's Allmänna Svenska Elektriska Aktiebolaget (ASEA) and Switzerland's Brown, Boveri & Cie merged to cre ...
(ABB) was contracted to design the high-pressure turbine, intermediate-pressure/reheat turbine and generator. The HP/IP generator produces 900 MW and the Westinghouse LP generator produces 497 MW. The plant's feedwater pump is powered by a turbine. The feedwater turbine was designed by ABB and generates . The boiler, designed by
Babcock & Wilcox Babcock & Wilcox is an American renewable, environmental and thermal energy technologies and service provider that is active and has operations in many international markets across the globe with its headquarters in Akron, Ohio, USA. Historicall ...
, is a
supercritical steam generator A supercritical steam generator is a type of boiler that operates at supercritical pressure, frequently used in the production of electric power. In contrast to a subcritical boiler in which bubbles can form, a supercritical steam generator op ...
with a maximum pressure of about and temperature of about . The reheat section of the boiler operates at about . The plant also uses several environmental controls such as
selective catalytic reduction Selective catalytic reduction (SCR) is a means of converting nitrogen oxides, also referred to as with the aid of a catalyst into diatomic nitrogen (), and water (). A reductant, typically anhydrous ammonia (), aqueous ammonia (), or a urea () ...
(SCRs) to reduce nitrogen oxide () emissions,
electrostatic precipitator An electrostatic precipitator (ESP) is a filterless device that removes fine particles, like dust and smoke, from a flowing gas using the force of an induced electrostatic charge minimally impeding the flow of gases through the unit. In con ...
s to remove fly ash, and a flue-gas desulfurization (FGD) system which removes up to 98% of the sulfur dioxide () emissions. The
gypsum Gypsum is a soft sulfate mineral composed of calcium sulfate dihydrate, with the chemical formula . It is widely mined and is used as a fertilizer and as the main constituent in many forms of plaster, blackboard or sidewalk chalk, and drywal ...
byproduct of the FGD system is sold to make drywall. The plant's
cooling tower A cooling tower is a device that rejects waste heat to the atmosphere through the cooling of a coolant stream, usually a water stream to a lower temperature. Cooling towers may either use the evaporation of water to remove process heat an ...
was designed to handle the cooling for the original nuclear plant. This creates generating efficiency issues during very hot summer days, as the cooling tower must cool much more equipment than it was originally designed for. A smokestack was constructed for discharging the flue gas.


See also

* List of power stations in Ohio * List of canceled nuclear plants in the United States


References


External links


Ohio Historical Central brief
*
W.H.Zimmer generation data from EIA
{{DEFAULTSORT:Zimmer Power Station Energy infrastructure completed in 1991 Buildings and structures in Clermont County, Ohio Coal-fired power stations in Ohio Cancelled nuclear power stations in the United States 1991 establishments in Ohio Nuclear power plants in Ohio Vistra Corp