West Burton power stations
   HOME

TheInfoList



OR:

The West Burton power stations are a pair of power stations on the
River Trent The Trent is the third-longest river in the United Kingdom. Its source is in Staffordshire, on the southern edge of Biddulph Moor. It flows through and drains the North Midlands. The river is known for dramatic flooding after storms and ...
near
Gainsborough, Lincolnshire Gainsborough is a market town, inland port and civil parish in the West Lindsey district of Lincolnshire, England. The town population was 20,842 at the 2011 census, and estimated at 23,243 in 2019. It lies on the east bank of the River Trent ...
,
England England is a country that is part of the United Kingdom. It shares land borders with Wales to its west and Scotland to its north. The Irish Sea lies northwest and the Celtic Sea to the southwest. It is separated from continental Europe ...
. West Burton A is a
coal-fired power station A coal-fired power station or coal power plant is a thermal power station which burns coal to generate electricity. Worldwide, there are about 8,500 coal-fired power stations totaling over 2,000 gigawatts Nameplate capacity, capacity. They ...
, which was commissioned in 1966, and West Burton B is a
combined cycle gas turbine A combined cycle power plant is an assembly of heat engines that work in tandem from the same source of heat, converting it into mechanical energy. On land, when used to make electricity the most common type is called a combined cycle gas turb ...
power station, commissioned in 2013. West Burton A is owned and operated by
EDF Energy EDF Energy is a British integrated energy company, wholly owned by the French state-owned EDF (Électricité de France), with operations spanning electricity generation and the sale of natural gas and electricity to homes and businesses through ...
, while West Burton B is owned and operated by EIG Global Energy Partners. The station has been accredited as an Investor in People since 1995 and ISO accredited (ISO 14001) for its environmental management system since 1996. The power station won a RoSPA President's Award in 2006, 2007 and 2008. The site is the farthest north of what was a series of power stations in the Trent valley, being downstream of the now-closed
Cottam power stations Cottam power station is a decommissioned coal-fired power station. The site extends over of mainly arable land and is situated at the eastern edge of Nottinghamshire on the west bank of the River Trent at Cottam near Retford. The larger coal ...
. As of September 2022, it is one of only three coal-fired power stations left in the UK and will need to close before 2024, with generation on two units currently planned to cease on 30 September 2022. Due to the volatile energy market associated with the
2022 Russian invasion of Ukraine On 24 February 2022, in a major escalation of the Russo-Ukrainian War, which began in 2014. The invasion has resulted in tens of thousands of deaths on both sides. It has caused Europe's largest refugee crisis since World War II. A ...
, the United Kingdom Government agreed with plant owners
EDF Energy EDF Energy is a British integrated energy company, wholly owned by the French state-owned EDF (Électricité de France), with operations spanning electricity generation and the sale of natural gas and electricity to homes and businesses through ...
that the remaining two generating units would be available for use for 6 months beyond the 30 September 2022 closure date, in order to provide supplies over the winter period. The plant now has an end of generation date of 31st March 2023.


History


Construction

The station is built on the site of the
deserted medieval village In the United Kingdom, a deserted medieval village (DMV) is a former settlement which was abandoned during the Middle Ages, typically leaving no trace apart from earthworks or cropmarks. If there are fewer than three inhabited houses the conve ...
of West Burton. Construction began in 1961 by the Northern Project Group a department within the
CEGB The Central Electricity Generating Board (CEGB) was responsible for electricity generation, transmission and bulk sales in England and Wales from 1958 until privatisation of the electricity industry in the 1990s. It was established on 1 Januar ...
the construction was overseen by resident engineer Douglas Derbyshire who had recently completed the build of the nearby High Marnham Power Station. In a bid to combine efforts at the design and construction stages the Boiler and Turbo-generator plant were replicated at Fiddlers Ferry power station located in Cuerdley,
Cheshire Cheshire ( ) is a ceremonial and historic county in North West England, bordered by Wales to the west, Merseyside and Greater Manchester to the north, Derbyshire to the east, and Staffordshire and Shropshire to the south. Cheshire's county tow ...
, in
North West England North West England is one of nine official regions of England and consists of the ceremonial counties of England, administrative counties of Cheshire, Cumbria, Greater Manchester, Lancashire and Merseyside. The North West had a population of ...
. The consulting engineers for the project were Merz & McLellan and the main contractor on site was
Alfred McAlpine Alfred McAlpine plc was a British construction firm headquartered in Hooton, Cheshire. It was a major road builder, and constructed over 10% of Britain's motorways, including the M6 Toll (as part of the CAMBBA consortium). It was listed on the ...
with steelwork designed by the
Cleveland Bridge & Engineering Company Cleveland Bridge & Engineering Company was a UK bridge works and structural steel contractor based in Darlington. It built landmarks including the Victoria Falls Bridge in Zimbabwe; the Tees Transporter Bridge; the Forth Road and Humber suspe ...
. The station was the first 2000 MW to be constructed in the
United Kingdom The United Kingdom of Great Britain and Northern Ireland, commonly known as the United Kingdom (UK) or Britain, is a country in Europe, off the north-western coast of the continental mainland. It comprises England, Scotland, Wales and ...
and was visited by the then chairman of the
CEGB The Central Electricity Generating Board (CEGB) was responsible for electricity generation, transmission and bulk sales in England and Wales from 1958 until privatisation of the electricity industry in the 1990s. It was established on 1 Januar ...
Christopher Hinton on 27 November 1964 the instigator of the new 500MW units. It subsequently attracted visitors from around the world including
Mohammad Reza Pahlavi , title = Shahanshah Aryamehr Bozorg Arteshtaran , image = File:Shah_fullsize.jpg , caption = Shah in 1973 , succession = Shah of Iran , reign = 16 September 1941 – 11 February 1979 , coronation = 26 Octob ...
the Shah of Iran who was escorted around the site by Robert Laycock the Lord Lieutenant of Nottinghamshire on 6 March 1965. West Burton number one unit, commissioned in September 1966, was the second 500MW generating unit to be ordered and go into full commercial operation. A further 3 Units were commissioned at the site in 1967. The station was officially opened on 25 April 1969 by the Minister of Power
Roy Mason Roy Mason, Baron Mason of Barnsley, (18 April 1924 – 19 April 2015), was a British Labour Party politician and Cabinet minister who was Secretary of State for Defence and Secretary of State for Northern Ireland in the 1970s. Early life He w ...
,
Sir Stanley Brown Sir Frederick Herbert Stanley Brown (9 December 1910 – 1997) was an English mechanical and electrical engineer. Born in Birmingham and educated at the King Edward's School, Birmingham he then went on to the University of Birmingham where he g ...
the then Chairman of the
CEGB The Central Electricity Generating Board (CEGB) was responsible for electricity generation, transmission and bulk sales in England and Wales from 1958 until privatisation of the electricity industry in the 1990s. It was established on 1 Januar ...
,
Arthur Hawkins Sir Arthur Ernest Hawkins (10 June 1913 – 13 January 1999) was an English mechanical and electrical engineer. Born in Lympley Stoke, Bath, Somerset and educated at the Great Yarmouth High School. He joined the CEGB and was heavily ...
Director of the Midlands Region and Douglas Pask director of the Northern Project Group. It was a lavish ceremony with a large marquee and band present.


Architecture

The principal architects for the buildings were Rex Savidge and John Gelsthorpe of Architects' Design Group (ADG) from Baker Street,
Nottingham Nottingham ( , locally ) is a city and unitary authority area in Nottinghamshire, East Midlands, England. It is located north-west of London, south-east of Sheffield and north-east of Birmingham. Nottingham has links to the legend of Robi ...
. Heliodon modelling was used to determine the visual and psychological impact of the structures to be used on site due to their scale. This created a Zone of Visual Influence (ZVI) a system pioneered by the
CEGB The Central Electricity Generating Board (CEGB) was responsible for electricity generation, transmission and bulk sales in England and Wales from 1958 until privatisation of the electricity industry in the 1990s. It was established on 1 Januar ...
for the creation of future 2000 MW power stations in the 1960s. The tower layouts exploit line and
lozenge Lozenge or losange may refer to: *Lozenge (shape), a type of rhombus *Throat lozenge, a tablet intended to be dissolved slowly in the mouth to suppress throat ailments *Lozenge (heraldry), a diamond-shaped object that can be placed on the field of ...
formations. The opposite pairs of the
lozenge Lozenge or losange may refer to: *Lozenge (shape), a type of rhombus *Throat lozenge, a tablet intended to be dissolved slowly in the mouth to suppress throat ailments *Lozenge (heraldry), a diamond-shaped object that can be placed on the field of ...
group were coloured light and dark to avoid tendency of shapes to coalesce when viewed at a moderate distance. The offset tower of the line group has a light yellow colour with intense hue which acts as a nodal point. This was decided via a technical committee, the architects and
William Holford William Graham Holford, Baron Holford, (22 March 1907 – 17 October 1975) was a British architect and town planner. Biography Holford was educated at Diocesan College, Cape Town and returned to Johannesburg. From 1925–30 he studied archi ...
in 1962. However, 10 years after construction the towers were indistinguishable from one another, the yellow tint was much faded. The main building colours are limited to black, white and yellow. The ancillary buildings are grouped around two courts through which the approach road passes. The Executive partner for (ADG) was Rex Savidge and
Architect An architect is a person who plans, designs and oversees the construction of buildings. To practice architecture means to provide services in connection with the design of buildings and the space within the site surrounding the buildings that h ...
in charge was John Gelsthorpe assisted by Norman Simpson. West Burton was granted an award by the Civic Trust for its "outstanding contribution to the surrounding scene". The Civic Trust, announcing the 82 awards it made in 1968 from more than 1,400 entries from 94 counties in the
United Kingdom The United Kingdom of Great Britain and Northern Ireland, commonly known as the United Kingdom (UK) or Britain, is a country in Europe, off the north-western coast of the continental mainland. It comprises England, Scotland, Wales and ...
described West Burton as "an immense engineering work of great style which, far from detracting from the visual scene, acts as a magnet to the eye from many parts of the Trent Valley".


Ownership

It was originally operated by the
CEGB The Central Electricity Generating Board (CEGB) was responsible for electricity generation, transmission and bulk sales in England and Wales from 1958 until privatisation of the electricity industry in the 1990s. It was established on 1 Januar ...
and then run by
National Power National power is defined as the sum of all resources available to a nation in the pursuit of national objectives. Assessing the national power of political entities was already a matter of relevance during the classical antiquity, the middle ages ...
after privatisation, until April 1996 when it was bought by the Eastern Group which became TXU Europe. In November 2001 when the price of electricity was low, TXU Europe sold the station to London Electricity Group for £366 million.
EDF Energy EDF Energy is a British integrated energy company, wholly owned by the French state-owned EDF (Électricité de France), with operations spanning electricity generation and the sale of natural gas and electricity to homes and businesses through ...
operated the West Burton power stations from 2001, however on 9 April 2021 the company announced the sale of the 1332 MW Combined Cycle Gas Turbine power station and 49MW battery at West Burton B to EIG Global Energy Partners. The sale process was completed on 31 August 2021. In 1977 a
British Rail Class 56 The British Rail Class 56 is a type of diesel locomotive designed for heavy freight work. It is a Type 5 locomotive, with a Ruston-Paxman power unit developing 3,250 bhp (2,423 kW), and has a Co-Co wheel arrangement. Enthusiasts nicknamed t ...
locomotive A locomotive or engine is a rail transport vehicle that provides the motive power for a train. If a locomotive is capable of carrying a payload, it is usually rather referred to as a multiple unit, motor coach, railcar or power car; the ...
was officially named in front of the coal plant control block as 'West Burton Power Station' number 56009 later re-numbered to 56201. Prior to privatisation West Burton was the last
CEGB The Central Electricity Generating Board (CEGB) was responsible for electricity generation, transmission and bulk sales in England and Wales from 1958 until privatisation of the electricity industry in the 1990s. It was established on 1 Januar ...
power station to be awarded the Christopher Hinton trophy in recognition of good
housekeeping Housekeeping is the management and routine support activities of running an organised physical institution occupied or used by people, like a house, ship, hospital or factory, such as tidying, cleaning, cooking, routine maintenance, shopping, ...
. The station had a ''Discovery Centre'' to educate local school children and also has the oldest mound of FGD
gypsum Gypsum is a soft sulfate mineral composed of calcium sulfate dihydrate, with the chemical formula . It is widely mined and is used as a fertilizer and as the main constituent in many forms of plaster, blackboard or sidewalk chalk, and drywa ...
in the UK, part of an experiment set up by
CEGB The Central Electricity Generating Board (CEGB) was responsible for electricity generation, transmission and bulk sales in England and Wales from 1958 until privatisation of the electricity industry in the 1990s. It was established on 1 Januar ...
scientists in 1988. In the summer of 1998 Station Manager Derrek Wells was awarded the OBE for his services to the power industry.


Environment

West Burton is currently opted in to the UK Transitional National Plan, placing limits on its sulphur dioxide, nitrous oxides and particulates emissions to a period up to the end of 2020. part of the Industrial Emissions Directive 2010/75/EU which superseded the Large Combustion Plant Directive 2001/80/EC. Under the EU regulations West Burton is classed as two power plants due to the fact of having two chimneys.


Unbuilt West Burton 'B' (Coal)

In 1988 the then
chairman The chairperson, also chairman, chairwoman or chair, is the presiding officer of an organized group such as a board, committee, or deliberative assembly. The person holding the office, who is typically elected or appointed by members of the group ...
of the
CEGB The Central Electricity Generating Board (CEGB) was responsible for electricity generation, transmission and bulk sales in England and Wales from 1958 until privatisation of the electricity industry in the 1990s. It was established on 1 Januar ...
Walter Marshall, Baron Marshall of Goring Walter Charles Marshall, Baron Marshall of Goring (5 March 1932 in Rumney, Cardiff – 20 February 1996, in London) was a noted theoretical physicist and leader in the UK's energy sector. Early life The son of Frank Marshall and Amy Pearson, ...
announced a 2 x 900 MW coal-fired power station fitted with flue-gas desulfurisation (FGD) to be known as 'West Burton B' would be built on the site. The plan was abandoned just before privatisation.


Combined cycle gas turbine power station

A £600 million 1,270 MWe CCGT power station, which runs on
natural gas Natural gas (also called fossil gas or simply gas) is a naturally occurring mixture of gaseous hydrocarbons consisting primarily of methane in addition to various smaller amounts of other higher alkanes. Low levels of trace gases like carbon d ...
, was built next to the coal-fired station. Construction by the
Kier Group Kier Group plc is a British construction, services and property group active in building and civil engineering, support services, and the Private Finance Initiative. Founded in 1928 in Stoke-on-Trent it initially specialised in concrete enginee ...
started in January 2008. It was built on land originally allocated for a proposed 1,800 MW West Burton 'B' coal power station that was to have been built in the 1980s. Privatisation of the electricity industry in 1990 cancelled this scheme. The power station was commissioned in 2013, and supplies electricity to around 1.5 million homes. A new
gas pipeline Pipeline transport is the long-distance transportation of a liquid or gas through a system of pipes—a pipeline—typically to a market area for consumption. The latest data from 2014 gives a total of slightly less than of pipeline in 120 countr ...
was built to link to the National Gas Transmission System at
Grayingham Grayingham is a village and civil parish in the West Lindsey district of Lincolnshire, England. The population of the civil parish at the 2011 census was 123 It is situated south from Kirton in Lindsey, north-east from Gainsborough and 8 mile ...
in Lincolnshire. Around 1,000 people were involved in the construction. The plant consists of three 430 MW
gas turbine A gas turbine, also called a combustion turbine, is a type of continuous flow internal combustion engine. The main parts common to all gas turbine engines form the power-producing part (known as the gas generator or core) and are, in the directio ...
s each with a
heat recovery steam generator A heat recovery steam generator (''HRSG'') is an energy recovery heat exchanger that recovers heat from a hot gas stream, such as a combustion turbine or other waste gas stream. It produces steam that can be used in a process (cogeneration) or us ...
. Activists from the No Dash For Gas group protesting against the building of the gas plant pleaded guilty to charges of aggravated trespass in February 2013. EDF discontinued a civil lawsuit against them in March 2013.


Closure and future

In March 2021, EDF confirmed that West Burton A would cease generation on 30 September 2022. After it was first listed as a candidate in June 2021, on 3 October 2022 the site was announced as the planned location for the first nuclear fusion power plant to be built under the
Spherical Tokamak for Energy Production Spherical Tokamak for Energy Production (STEP) is a spherical tokamak fusion plant concept proposed by the United Kingdom Atomic Energy Authority and funded by UK government. The project is a proposed DEMO-class successor device to the ITER tokam ...
(STEP) programme.


Specification

The power station provides electricity for around two million people, and is situated on a site. Coal for the power station, like Cottam, came from the Welbeck colliery at Meden Vale until it closed in May 2010. The station's other main supplier of coal,
Thoresby Colliery Thoresby Colliery was a coal mine in north Nottinghamshire on the outskirts of Edwinstowe village. The mine, which opened in 1925, was the last working colliery in Nottinghamshire when it closed in 2015. The site has been cleared and it being re ...
, closed in 2015. The station connects to the National Grid, like most similar sized coal power stations, via a
transformer A transformer is a passive component that transfers electrical energy from one electrical circuit to another circuit, or multiple circuits. A varying current in any coil of the transformer produces a varying magnetic flux in the transformer' ...
and substation at 400 kV. The chimneys of West Burton Power Station are tall.


Boiler

The four boilers have single divided furnaces and assisted circulation. Each has a maximum continuous rating of 1565 t/h (3,450,000 lb/h) and a design efficiency of 90.75%. Built by
International Combustion International Combustion Limited was a major engineering business based in Derby offering products for the nuclear engineering industry. International Combustion Australia Limited was a separate non-affiliated company. History The Company was foun ...
, the design is similar in many respects to that of the now redundant 550 MW ICL boiler at Thorpe Marsh which had two furnaces with centre division walls. There are six stages of superheat and three stages of reheat in each boiler, with superheat and reheat stages mixed in position. As a result of operating experience on boilers of this size at Thorpe Marsh it was found that higher superheat temperatures and larger pressure drops than the design figures occurred in the boiler. New materials had to be employed for the superheat sections and the tube paths redesigned as a result. The boilers are high and the main suspension girders span . The total downward thermal expansion is about . The superheater output is at 569 °C 2,400 psi (165.5
bar Bar or BAR may refer to: Food and drink * Bar (establishment), selling alcoholic beverages * Candy bar * Chocolate bar Science and technology * Bar (river morphology), a deposit of sediment * Bar (tropical cyclone), a layer of cloud * Bar ( ...
). The reheater has inlet and outlet temperatures of 364 and 569 °C with an inlet pressure of 592 psi (40.82 bar) and steam flow of 1243 t/h (2,740,000 lb/h). The single steam drum weighs 162.6 tonne (160 tons). The furnace is tangentially fired with eight burner boxes, each with six burners, together with oil burners in each box for lighting up. Steam temperature control is by electrically operated tilting burners and by electro-hydraulically operated spray desuperheaters, giving a control range of 70 to 100% of the maximum continuous rating. There are four desuperheaters for each of the superheater and reheater circuits. The economisers have a heating surface of . There are two forced and two induced draught Davidson fans per boiler. The f.d. fans are driven by constant speed 1,300 hp motors at 596 rpm and are rated at 11,380 m3/min (402,000 (cu ft)/min). A saving in the overall size of the boiler house building, which measures long, wide and high, was achieved by arranging the pulverised fuel mills in two rows between adjacent boilers instead of in a line along the length of the boiler house as usual. This meant that coal conveyors at right angles to the trunk conveyor had to be installed for each line of mills, but the cost of these was more than offset by the saving in capital on the building. There are six roller type mills per boiler, each powered by a direct coupled 635 hp motor at 985 rpm. The coal is fed to the mills by Lopulco chain feeders with induction regulator speed controllers. Separated over-fire air (SOFA) burners were installed on all four of the station's units in 2007 to meet European Union
nitrogen oxide Nitrogen oxide may refer to a binary compound of oxygen and nitrogen, or a mixture of such compounds: Charge-neutral *Nitric oxide (NO), nitrogen(II) oxide, or nitrogen monoxide * Nitrogen dioxide (), nitrogen(IV) oxide * Nitrogen trioxide (), or ...
emission legislation. The burners were installed by
GE Energy GE Power (formerly known as GE Energy) is an American energy technology company, owned by General Electric. Structure As of July 2019, GE Power is divided into the following divisions: * GE Gas Power (formerly Alstom Power Turbomachines), bas ...
.


Turbine

The 500 MW single shaft machines manufactured by
English Electric N.º UIC: 9094 110 1449-3 (Takargo Rail) The English Electric Company Limited (EE) was a British industrial manufacturer formed after the Armistice of 11 November 1918, armistice of World War I by amalgamating five businesses which, during th ...
, are arranged lengthwise along the turbine hall, which is long by wide by high. The overall length of each machine is . The generators are rated at 500 MW, 22 kV at 0.85 power factor. Steam conditions at the H.P. turbine stop valve are 2,300
psig The pound per square inch or, more accurately, pound-force per square inch (symbol: lbf/in2; abbreviation: psi) is a unit of pressure or of stress based on avoirdupois units. It is the pressure resulting from a force of one pound-force applied to ...
(158.6 bar) at 566 °C with a single reheat stage to the I.P. cylinder of 565 psia (38.96 bar) at 566 °C. The turbine has a design steam consumption of , including reheating, feed heating, and boiler feed pump drive and an overall heat input of , an efficiency of about 45.5%. A novel mounting arrangement was adopted for the turbo-generators. The L.P. cylinders are supported on two steel beams about long, which bridge between the concrete blocks at the H.P. steam and generator ends of the sets. The fabricated condenser structure was welded directly to the underside of the L.P. frame using a pre-heated welding technique. This provides a compact arrangement of the condenser and the main set and is a major factor in the reduction of size related to the output of the machines, which is a striking feature of the turbine hall. The L.P. frame is supported at its corners, each of the supports taking about 203.2 tonnes (200 tons) in weight. The overall weight of the frame and condenser structure is some 2,235 tonnes (2,200 tons) of which 1,422 tonnes (1,400 tons) is supported on the bottom of the condenser by the mounting springs. The condensers were fabricated on site by
English Electric N.º UIC: 9094 110 1449-3 (Takargo Rail) The English Electric Company Limited (EE) was a British industrial manufacturer formed after the Armistice of 11 November 1918, armistice of World War I by amalgamating five businesses which, during th ...
from sub assemblies and welded to the bridge beams supporting the L.P. cylinder. There are over 40,000 long, diameter aluminium/brass tubes in each condenser, giving an effective surface area of the equivalent of 3.9 football pitches. Operation is at 1.3
inHg Inch of mercury (inHg and ″Hg) is a non- SI unit of measurement for pressure. It is used for barometric pressure in weather reports, refrigeration and aviation in the United States. It is the pressure exerted by a column of mercury in hei ...
with 1,023 m3/min (225,000 gal of cooling water at 15.5 °C. Steam is passed to the condenser at over 963.9 t/h (2,125,000 lb/h). Since contamination of the condensate by the cooling water must be avoided, a double tube plate construction has been adopted in which the condenser tubes are expanded into an extra tubeplate in addition to the one forming the side of the water box. The narrow space between the plates is filled with demineralised water, supplied from a header tank from . This provides a pressure considerably higher than the 20 psig developed in the cooling water system, so that any leaks on the tube end plates will be supplied from the header tank. The bridge condenser Is a single surface type unit, receiving and condensing the steam discharged from the six exhausts of the three double flow LP cylinders, combined with an upper frame supporting and containing the cylinders themselves. The integrated structure, weighing about 2,280 tons in its working condition, spans the two concrete foundation blocks supporting the HP and IP cylinder and the generator, hence the name bridge condenser. About two-thirds of the weight is transferred to the basement floor through a mattress of springs. The circulating water used as a cooling medium passes through 40,740 tubes arranged in six groups, each of two tube bundles, with each group lying directly below a turbine exhaust. The single shaft five cylinder impulse-reaction turbine has a double flow arrangement for the I.P. cylinders as well as for the L.P. cylinders. There are double casings on H.P., I.P., and L.P. cylinders, and the last stages of the L.P. are fitted with blades. Stop valves and governor valves are situated at the inlet to the H.P. strainers and I.P. turbine. There are four bore main steam pipes, and four bore pipes on both the hot and cold reheat circuits to the turbine. In view of the size and increased volume of pipework compared to earlier designs, special attention was paid to mounting the valve chests as close to the machine as possible to reduce the stored energy effect of overspeed. For the H.P. valves this is done without actually mounting the valves on the cylinder, thus avoiding complication of the H.P. casing. Because the coupled shafts 'hang' in a curve, which may be lower at the centre than at the ends, the complete generator must be adjusted with its outer end slightly higher than the end adjacent to the turbine, so that the turbine and generator coupling faces are parallel, and peripherally true before they are bolted together. This adjustment is achieved to an accuracy at the coupling face of .


Generator

Each of the four generators is designed for an output of 500 MW at 0.85 power factor with a terminal voltage of 22 kV. Hydrogen at a pressure of 60 psig, is employed for cooling the stator core and rotor conductors, the gas being in direct contact with the rotor conductors, and water is used for cooling the stator conductors. Hydrogen coolers are arranged longitudinally in the upper part of the stator frame and the hydrogen is circulated by an axial flow blower mounted on the turbine end of the rotor shaft. The stator is of two-part construction, the core and windings being assembled in a skeleton inner frame threaded into the outer stator frame at site. The weight of the heaviest part, the inner stator, is 194 tons. The generator stator winding is water cooled at 2.155 m3/min (474 gal/min) and the stator core and rotor winding are cooled by hydrogen at 60 psig circulated by a blower on the shaft. To reduce the transport weight, each stator consists of an outer gas tight enclosure, which carries the hydrogen coolers and the end brackets which support the rotor bearings, and an inner stator comprising the magnetic core and windings. The stator core is built with laminations of cold rolled grain-oriented sheet steel thick, insulated from each other with insuline. The number of segments per circle is arranged so that the maximum practical percentage of core flux is in the direction of the oriented grain. The rings of lamination's are built into a skeleton frame which is flexibly supported inside the main stator frame to prevent double-frequency vibrations being transmitted to the foundations. Axial gas passages are provided within the core by holes punched in the lamination's, which line up throughout its length. The ends of the core are divided axially by spacers into a number of radial ducts. These ducts form the gas inlet and outlet passages for the axial gas passages. Separate radial ducts feed the extreme ends of the core with cold gas to cater for the increased heating experienced at the core ends during leading power factor operation. Each coil side of the stator winding consists of rectangular copper tubes, each tube being insulated with resin-impregnated glass braid, and the tubes are transposed within the coil length by the Roebel method to minimise stray copper losses. Inlet and outlet manifolds are arranged at opposite ends of the windings and all coil sides are fed in parallel from these. The water connections between the manifolds and coil sides are made with flexible hoses of insulating material. The electrical connections between coil sides consist of flexible copper straps, bolted and sweated to contact blocks which are brazed to the conductor tubes near to the end of each coil side. The rings used to connect up the phase groups to the terminals are also water cooled, the flow through these being in parallel with the flow through the coil sides. Direct hydrogen cooling is employed in the stator terminals. The rotor forging is of nickel chromium molybdenum vanadium steel having a minimum yield point of 33.2 ton/in.2. The shaft end which connects to the turbine is deferentially tempered to give additional strength to withstand the severe forces which could be applied under fault conditions on the generator. The first three critical speeds are arranged to be below the running speed. The hydrogen-cooled rotor conductors are formed from silver-bearing hard drawn copper tube. Two tubes in parallel form one conductor and there are six conductors per slot except for the slots adjacent to the pole centres, which contain five. The generator is ventilated by cold gas fed to a number of radial ducts at the slipring end of the core, which communicate with the axial vent holes in the core and stator teeth. After passing through the axial holes the gas is discharged into the ‘air’ gap through further radial ducts at the turbine end of the core. The gas discharged from the core passes along the ‘air’ gap, together with the hot gas discharged from the outlet holes in the rotor body, to the region between the end windings and a baffle at the slipring end, and thence through one half of each axial cooler to the blower intake. After leaving the blower, the gas is passed through the other halves of the coolers and is delivered to the various inlet regions of the stator core and rotor. Gas is fed to the turbine end of the rotor through axial holes machined in the hub of the blower rotor from an annulus formed between the end bracket and the blower outlet diffuser. Large diameter tubes passing longitudinally through the stator frame connect this annulus to the extreme end section at the slipring end, from which the slipring end of the rotor is fed. The three-stage axial blower mounted on the generator shaft comprises a shaft-mounted sleeve upon which is mounted the bladed rotor disc, a bladed stator casing, a diffuser and an inlet fairing. The stator casing and diffuser are rigidly supported from the turbine end bearing bracket. Low conductivity demineralised water is circulated through the stator windings by a pump and passes through coolers and a filter before entering the inlet manifold of the winding. After passing through the winding the water returns to the pump through a degassing tank. This is basically a sudden enlargement in the pipe, which causes the water velocity to decrease and so enables any bubbles of gas to be collected in a small chamber fitted with a float-operated alarm switch. A header tank, which contains enough water for a complete refill of the system, is connected into the inlet pipe to the winding. A small demineralising plant is provided to treat the water, should the conductivity of the make-up water supply be too high. The main exciter is a 3,000 rpm 3-phase machine directly coupled to the main generator shaft. Cooling is effected by a closed air ventilation circuit with pannier mounted coolers supplied with cooling water from the condensate system. The exciter output is rectified by a 3-phase bridge-connected group of silicon diodes which are natural air cooled and accommodated in a bank of nine cubicles located on a platform cantilevered from the side of the foundation block. Mounted adjacent to the rectifiers is the main field suppression circuit-breaker which incorporates a discharge resistance and auxiliary switch to close the discharge circuit. A permanent magnet high frequency generator, directly coupled to the exciter shaft, acts as a pilot exciter and supplies the exciter field via a power stage magnetic amplifier which may be regulated either by manual control or by the automatic voltage regulator. The AVR is a continuously acting regulator including such features as VAR limiting, automatic follow-up of manual control, and protection against over fluxing or over exciting of the main generator.


Feed system

There are three stages of H.P. feed heating with six heater shells arranged in parallel pairs, a de-aerator and three low pressure heaters. Steam is bled from the main turbine H.P. exhaust to drive the main boiler feed pump turbine, which exhausts to the feed heating system to improve the overall cycle efficiency. The main feed pump turbine is a 15,150 hp single-cylinder impulse machine with steam conditions, at the h.p. exhaust, of 610 psia (42.06 bar) at 366 °C. The rotor has eleven stages and the steam is exhausted to the de-aerator at 52 psia. (3.585 bar) at 144 °C. The pump is a six-stage centrifugal unit with a capacity of 1588 t/h (3,500,000 lb/h). Two 50 per cent duty start-up and standby feed pumps, electrically driven, are also provided.


Cooling water system

The eight cooling towers, built by Davenport Engineering Ltd. of
Bradford Bradford is a city and the administrative centre of the City of Bradford district in West Yorkshire, England. The city is in the Pennines' eastern foothills on the banks of the Bradford Beck. Bradford had a population of 349,561 at the 2011 ...
, have a capacity of 30,690,000 L/h (6,750,000 gal/h ) and a normal cooling range of . The towers are high with internal diameters at sill level of and at the top at the throat. Cooling tower C1 was fitted with reinforced concrete tension rings in 2000 to provide additional stability to the structural shell. Cooling water is circulated by Allen Gwynnes horizontal centrifugal bottom suction cooling water pumps, with four in each of the two pump houses. Each pump has a capacity of 545,500 L/min (120,000 gal/min ) with a net generated head of . Make-up water from the river Trent is pumped by four 45,460 L/m (10,000 gal/min ) vertical centrifugal pumps).


Coal store

Coal is supplied via north- and south-facing junctions off the adjacent Manchester and Cleethorpes railway line. Coal arriving at the station is discharged from the permanently coupled 29.03-tonne-capacity (32 tons) hopper wagons, the bottoms of which are opened by automatic lineside gear while the train moves through at . The four W & T Avery Ltd. weighbridges, two on each of the two rail tracks using electronic weighing heads, record the weight of the coal wagons loaded and empty and summate the total quantity of coal delivered. The coal store on the site has a maximum capacity of 1,814,000 tonnes (2 million tons) at deep, it is used to deposit all surplus coal and to build up stocks. There are also two fly ash siding (E & F) and two oil sidings (K & L). West Burton Power Station was used as a testing ground for the
merry-go-round train A merry-go-round train, often abbreviated to MGR, is a block train of hopper wagons which both loads and unloads its cargo while moving. In the United Kingdom, they are most commonly coal trains delivering to power stations. These trains were ...
system in 1965 which would be introduced at all 500 MW and above power stations. During the stations' early life in the 1970s and under the merry-go-round train agreement with
British Rail British Railways (BR), which from 1965 traded as British Rail, was a state-owned company that operated most of the overground rail transport in Great Britain from 1948 to 1997. It was formed from the nationalisation of the Big Four (British ra ...
and the
National Coal Board The National Coal Board (NCB) was the statutory corporation created to run the nationalised coal mining industry in the United Kingdom. Set up under the Coal Industry Nationalisation Act 1946, it took over the United Kingdom's collieries on "ve ...
, no deliveries were made at the weekends. The coal store has capacity for over three months' operation of the station. When discharged from the railway wagons, the coal drops into the hoppers immediately under the track, where it is scooped out evenly along the length of the hoppers by remotely operated paddle feeder machines. These deposit the coal on two twin deep-trough belt conveyors wide, each with a capacity of 1,361 t/h (1,500 tons per hour) at 137.16 m/min (450 ft/min). The belt conveyors feed coal via the screening and crushing plant, where it is also passed through magnetic separators, to the transfer tower. From this tower the coal can be passed to stock via a boom stacker or direct to the boiler house. There are seven belt weighers installed in the conveyor system, to enable checks to be made on the coal quantities passed to stock, re-claimed from stock and finally passed to the boiler house bunkers. The four 2,722-tonne-capacity (3,000-ton) boiler bunkers will hold enough coal for overnight operation without drawing from the coal store. The normal maximum consumption of each boiler is approximately 181.4 t/h (200 tons per hour).


Gas turbine

Four 17.5 MW gas turbine driven alternators were installed at the station. They supply power to the auxiliaries in the event of the grid system frequency varying outside suitable limits for the plant. A low frequency relay, which can be pre-set between 49 and 50 cycles per second, initiates the starting operation on the gas turbines; normally the setting is 49.5 cycles per second. The load is automatically taken over by the gas turbines and the auxiliary plant is isolated from the grid supply, provided the system frequency has by then fallen to approximately 48 cycles per second. The gas turbine generators can also be used for augmenting the station output at peak load via the unit transformers. If the station becomes completely isolated from the grid system, the gas turbines are used to restart any main units that are shut down. This process is known as a
black start A black start is the process of restoring an electric power station or a part of an electric grid to operation without relying on the external electric power transmission network to recover from a total or partial shutdown.Knight, U.G. ''Power ...
and is tested annually. Each gas turbine unit consists of an
English Electric N.º UIC: 9094 110 1449-3 (Takargo Rail) The English Electric Company Limited (EE) was a British industrial manufacturer formed after the Armistice of 11 November 1918, armistice of World War I by amalgamating five businesses which, during th ...
type EA 3,000 r.p.m. expansion turbine employing two
Rolls-Royce Avon The Rolls-Royce Avon was the first axial flow jet engine designed and produced by Rolls-Royce. Introduced in 1950, the engine went on to become one of their most successful post-World War II engine designs. It was used in a wide variety of ...
type RA29 Stage 6A (1533–51) engines as gas generators, and is directly coupled to the alternator. The alternators, made by
English Electric N.º UIC: 9094 110 1449-3 (Takargo Rail) The English Electric Company Limited (EE) was a British industrial manufacturer formed after the Armistice of 11 November 1918, armistice of World War I by amalgamating five businesses which, during th ...
are rated at 11 Kv, 21.9 MVA, 0.8 lagging
power factor In electrical engineering, the power factor of an AC power system is defined as the ratio of the ''real power'' absorbed by the load to the '' apparent power'' flowing in the circuit. Real power is the average of the instantaneous product of v ...
and have a frequency range of 40 to 51 cycles per second. Two of the four gas turbines were later decommissioned during the 1990s.


400 kV Supergrid Substation

The 400 kV substation interconnects four generator circuits, six feeders, two inter-bus transformers and includes two bus coupler switches and one main busbar section. The circuits are back to back and are arranged with the generator and interbus transformer connections on the power station side and the line entries on the opposite side of the substation. The current line entries are Bicker Fen-Walpole, Bicker Fen-Spalding North, Keadby 2, High Marnham, Cottam, and Keadby 1.


Civil works

The design of the prototype indoor 400 kV switch house was arrived at by close liaison between electrical and civil engineers before full details of plant and equipment were known. The structural frames are at centres, each frame consisting of five continuous portals, each wide with a cantilever at each end. The inner portals take the busbars and the two outer portals the breakers. The cantilever gives space for the through bushings and isolators. There are nine structural bays in the length of the Switch House, making the building . The site area is approximately , of which the switch house takes up . The total weight of the steelwork is about 2,540 tonnes (2,500 tons).


Roof load

The main and longitudinal girders have been designed as welded lattice steel members of sufficient depth to incorporate the access walkways. In addition to transferring the roof load to the columns these girders also have the 'V' strain insulators attached to them. The side framing of the building as well as carrying the wall cladding also supports the wall bushings and provides anchorage for the strainer connections between the turbine house and the switch house. The switch house was designed so as to fit in the architectural treatment of the Power Station as a whole. The plastic-coated aluminium cladding is therefore coloured black on the north and south faces of the building and gold on the east and west. The roof line of the switch house is designed to blend with the 'saw tooth' effect on the turbine house roof. Construction work began in the severely cold winter of 1962/63. The cold weather was turned to advantage as the clay subsoil which is generally unmanageable when wet was frozen solid. Excavation went on uninterrupted on drainage branches during this period. The wet mix base was next introduced over all the site. The object of the wet mix was to apply a firm layer for the construction to be carried on even when subsoil clay was wet. Construction traffic also tended to compact the wet mix therefore improving it as a base for the final topcoat of bitumen macadam. Steel erection began in June 1963. Erection was carried out by means of two derricks which ran along tracks extending over the length of the switch house. As soon as the steelwork contractor had moved out of the first bays, the civil contractor began work on erecting precast concrete structures, forming trenches and tidying up the surfacing. Access within the switch house was made easier by a decision to lay 228-millimetre-diameter (9 in) ducts to take many of the cables beneath the surface, thus eliminating numerous trenches. The precast concrete structures proved to be comparatively easy to erect to very close tolerances. On the isolator structures the various concrete members are bolted together using high tensile steel bolts to a pre-determined torque. All in situ concrete is eliminated from these structures. The circuit breaker structures were cast in situ. The contract was started on 21 January 1963 and was substantially completed by 30 November 1964. Access was given to the electrical contractors in April 1964.


132 kV Substation

In addition to interconnecting the supergrid system, the West Burton 400 kV substation also feeds into the local 132 kV network. This connection is made via two 240 MVA, 400/132 kV auto-transformers manufactured by
Associated Electrical Industries Associated Electrical Industries (AEI) was a British holding company formed in 1928 through the merger of the British Thomson-Houston Company (BTH) and Metropolitan-Vickers electrical engineering companies. In 1967 AEI was acquired by GEC, to c ...
. The windings consists of a tertiary winding, a common, a tapping and a series winding. They are arranged so that the helical single layer tertiary winding is nearest the core, the continuous disc common winding next, followed by the interleaved full-length helical type tapping winding and the multi-layer type series winding and line shield. A continuously transposed conductor was used to minimise
eddy current Eddy currents (also called Foucault's currents) are loops of electrical current induced within conductors by a changing magnetic field in the conductor according to Faraday's law of induction or by the relative motion of a conductor in a magnet ...
losses and reduce the space requirement of the windings. High speed resistor tap changers are provided on the 132 kV side of each transformer, giving a tapping range of plus 15% to minus 5%. The tapping winding has 7 taps which in conjunction with a buck/boost switch provide fourteen steps. The fixed contacts of each of the two rotary tap selector units associated with each phase are connected to one half of the tappings from the windings while the moving contacts are connected to the diverter switches. The diverter switch assembly, together with the transition resistors and operating mechanism is mounted on top of the 132 kV bushing which forms an integral part of the tap changer. Erection of the transformer was carried out inside a translucent plastic dome, inflated by a small blower. This allowed the work to continue regardless of the weather and thus reduced the time normally taken for erecting large transformers in the open. By working day and night within the plastic dome the time for erection on site was reduced from an estimated 8 weeks to 3 weeks. Completely assembled, each transformer is long, wide, and weighs 325.1 tonnes (320 tons) made up of 154.4 tonnes (152 tons) of steel, 30.48 tonnes (30 tons) of copper, and 19.3 tonnes (19 tons) of insulation and 98,420 litres (26,000 gallons) of oil. The current line entries for the 132 kV switch house are North Greetwell
Lincoln Lincoln most commonly refers to: * Abraham Lincoln (1809–1865), the sixteenth president of the United States * Lincoln, England, cathedral city and county town of Lincolnshire, England * Lincoln, Nebraska, the capital of Nebraska, U.S. * Lincol ...
1,
Retford Retford (), also known as East Retford, is a market town in the Bassetlaw District in Nottinghamshire, England, and one of the oldest English market towns having been granted its first charter in 1105. It lies on the River Idle and the Chesterf ...
Worksop Worksop ( ) is a market town in the Bassetlaw District in Nottinghamshire, England. It is located east-south-east of Sheffield, close to Nottinghamshire's borders with South Yorkshire and Derbyshire, on the River Ryton and not far from th ...
– Checkerhouse 2, North Greetwell
Lincoln Lincoln most commonly refers to: * Abraham Lincoln (1809–1865), the sixteenth president of the United States * Lincoln, England, cathedral city and county town of Lincolnshire, England * Lincoln, Nebraska, the capital of Nebraska, U.S. * Lincol ...
2 and
Retford Retford (), also known as East Retford, is a market town in the Bassetlaw District in Nottinghamshire, England, and one of the oldest English market towns having been granted its first charter in 1105. It lies on the River Idle and the Chesterf ...
Worksop Worksop ( ) is a market town in the Bassetlaw District in Nottinghamshire, England. It is located east-south-east of Sheffield, close to Nottinghamshire's borders with South Yorkshire and Derbyshire, on the River Ryton and not far from th ...
– Checkerhouse 1


Control system

In 1996 the first unit was equipped with the
Advanced Plant Management System The Advanced Plant Management System (APMS) is a SCADA solution developed in partnership by RWE npower and Thales UK. Based on a real-time application platform, APMS is a monitoring and control system for any large industrial process. APMS is im ...
(APMS), a system developed by
RWE npower Npower Limited is a British supplier of gas and electricity to businesses. It has been a subsidiary of E.ON UK since January 2019. The company was formerly known as Innogy plc and was listed on the London Stock Exchange and was a constituent ...
and
Thales Thales of Miletus ( ; grc-gre, Θαλῆς; ) was a Greek mathematician, astronomer, statesman, and pre-Socratic philosopher from Miletus in Ionia, Asia Minor. He was one of the Seven Sages of Greece. Many, most notably Aristotle, regarded ...
, and implemented by Capula. All the remainder units followed in later years. The APMS database contains some 16,000 points. Operations staff interact with the system through four main workstation screens, supplemented by a further six overview screens.


Flue gas desulphurisation

In June 2000, work began on the fitting of
flue-gas desulfurization Flue-gas desulfurization (FGD) is a set of technologies used to remove sulfur dioxide () from exhaust flue gases of fossil-fuel power plants, and from the emissions of other sulfur oxide emitting processes such as waste incineration. Methods ...
(FGD) equipment at the station. FLS Miljo installed the
Mitsubishi Heavy Industries is a Japanese multinational engineering, electrical equipment and electronics corporation headquartered in Tokyo, Japan. MHI is one of the core companies of the Mitsubishi Group and its automobile division is the predecessor of Mitsubishi ...
wet limestone systems, while Arup Energy and
Mowlem Mowlem was one of the largest construction and civil engineering companies in the United Kingdom. Carillion bought the firm in 2006. History The firm was founded by John Mowlem in 1822, and was continued as a partnership by successive generat ...
took up a
design–build Design–build (or design/build, and abbreviated D–B or D/B accordingly) is a project delivery system used in the construction industry. It is a method to deliver a project in which the design and construction services are contracted by a sin ...
partnership to undertake the civil works and construction of infrastructure. The work was completed in October 2003, and had a total cost of £100 million. As part of the new FGD retrofit two new chimneys high were constructed to the north of the existing chimneys, numbers 1 and 2. In January 2003 when the new chimney 2 was erected alongside the old chimney 2 the wind direction changed and began blowing from the north hitting the new chimney 2 first, at a speed of 11.83 m/s (26.47 mph). This created a
vortex In fluid dynamics, a vortex ( : vortices or vortexes) is a region in a fluid in which the flow revolves around an axis line, which may be straight or curved. Vortices form in stirred fluids, and may be observed in smoke rings, whirlpools in ...
and caused the old chimney 2 to start oscillating to a magnitude of at its height of and an angle of 600
seconds The second (symbol: s) is the unit of time in the International System of Units (SI), historically defined as of a day – this factor derived from the division of the day first into 24 hours, then to 60 minutes and finally to 60 seconds each ...
(0.166 degrees). The old chimneys were later demolished and used as built up ground to form the security gatehouse and parking area at the power station entrance.


References


External links


Celebrating 40 years of electricity production at West Burton
EDF, 2009
No Dash For Gas ends the UK's longest power station occupation

EDF Energy opens West Burton gas-fired power station
{{East Midlands powerstations Buildings and structures in Nottinghamshire Power stations in the East Midlands Coal-fired power stations in England Natural gas-fired power stations in England 1966 establishments in England Energy infrastructure completed in 1966 Recipients of Civic Trust Awards