Triangle Expressway
   HOME

TheInfoList



OR:

The Triangle Expressway (TriEx) is the first modern
toll road A toll road, also known as a turnpike or tollway, is a public or private road (almost always a controlled-access highway in the present day) for which a fee (or '' toll'') is assessed for passage. It is a form of road pricing typically implement ...
built in
North Carolina North Carolina () is a U.S. state, state in the Southeastern United States, Southeastern region of the United States. The state is the List of U.S. states and territories by area, 28th largest and List of states and territories of the United ...
, and one of the first toll roads in the United States built to use only electronic toll collection instead of toll booths. The overall freeway consists of two segments called the Triangle Parkway and the Western Wake Freeway. The six-lane Triangle Parkway extends
Interstate 885 Interstate 885 (I-885) and North Carolina Highway 885 (NC 885) is an auxiliary Interstate Highway and state highway in the U.S. state of North Carolina. It links NC 540 and I-40 to I-85 in the Durham area. The route consist ...
(I-885) via North Carolina Highway 885 (NC 885) in Durham County to meet North Carolina Highway 540 (NC 540) in Morrisville in
Wake County Wake County is located in the U.S. state of North Carolina. In the 2020 census, its population was 1,129,410, making it North Carolina's most-populous county. From July 2005 to July 2006, Wake County was the 9th-fastest growing county in the U ...
. The Western Wake Freeway extends the total Triangle Expressway to long, extending NC 540 where it continues along to Holly Springs.


Description of the project

The money for the project comes from $625 million in bonds and a $387 million loan from the federal government. The
North Carolina Turnpike Authority The North Carolina Turnpike Authority was created in 2002 to speed the implementation of needed transportation improvements by funding some projects with tolls. Governed by a nine-member authority board, it is located within the Department of Tra ...
deposited this money on July 29, 2009, and on the same day the agency's executive director David W. Joyner signed contracts to pay $584 million of that money to three companies to build the road over the next 42 months, creating 13,800 jobs.


Triangle Parkway

S. T. Wooten Corp. of
Wilson, North Carolina Wilson is a city in and the county seat of Wilson County, North Carolina, United States. Located approximately east of the capital city of Raleigh, it is served by the interchange of Interstate 95 and U.S. Route 264. Wilson had an estimated p ...
built the northern section, an extension of NC 147 called Triangle Parkway, at a cost of $137.5 million, including an electronic toll plaza on I-540. The new road opened for traffic on December 8, 2011 and extends from the previously existing section of NC 147 (Now I-885) south from
I-40 Interstate 40 (I-40) is a major east–west Interstate Highway running through the south-central portion of the United States. At a length of , it is the third-longest Interstate Highway in the country, after I-90 and I-80. From west to ea ...
to an section of the Northern Wake Expressway. Completed in 2007, the existing section became part of the toll road August 2, 2012 (originally envisioned as part of I-540, because of rules against tolls on
interstate highway The Dwight D. Eisenhower National System of Interstate and Defense Highways, commonly known as the Interstate Highway System, is a network of controlled-access highways that forms part of the National Highway System in the United States. T ...
s, this section is now called NC 540. When
Research Triangle Park Research Triangle Park (RTP) is the largest research park in the United States, occupying in North Carolina and hosting more than 300 companies and 65,000 workers. The facility is named for its location relative to the three surrounding cities ...
(RTP) was created in the late 1950s, a corridor of land was preserved to be available for the Triangle Parkway's eventual construction. Another $230 million was spent on of additional
right-of-way Right of way is the legal right, established by grant from a landowner or long usage (i.e. by prescription), to pass along a specific route through property belonging to another. A similar ''right of access'' also exists on land held by a gov ...
for the entire road. Actual tolling of the new section of road began January 3, 2012.


Western Wake Freeway

Granite Construction of
Watsonville, California Watsonville is a city in Santa Cruz County, California, located in the Monterey Bay Area of the Central Coast of California. The population was 52,590 according to the 2020 census. Predominantly Latino and Democratic, Watsonville is a self ...
, and Archer Western Contractors of
Atlanta Atlanta ( ) is the capital and most populous city of the U.S. state of Georgia. It is the seat of Fulton County, the most populous county in Georgia, but its territory falls in both Fulton and DeKalb counties. With a population of 498,7 ...
worked together as Raleigh Durham Roadbuilders to complete the Western Wake Freeway at a cost of $446.5 million. This section of the Triangle Expressway, which extends from NC 55 at RTP to NC 55 at Holly Springs, will become part of NC 540. In summer 2009, work began on the freeway. On August 1, 2012, the second section from NC 55 to US 64 opened, with the remaining six miles south of US 64 to NC 55 in Holly Springs opening December 20, 2012. Tolls and $25 million a year from the North Carolina legislature will finance the project.


Tolls

The Triangle Expressway is built as an all-electronic toll road with billing by license plate, similar to Maryland's Route 200 (InterCounty Connector, largely opened to traffic in 2011). Drivers can open an account and use a North Carolina Quick Pass
transponder In telecommunications, a transponder is a device that, upon receiving a signal, emits a different signal in response. The term is a blend of ''transmitter'' and ''responder''. In air navigation or radio frequency identification, a flight trans ...
, which results in a lower rate. Other drivers will have their
license plate A vehicle registration plate, also known as a number plate (British English), license plate (American English), or licence plate (Canadian English), is a metal or plastic plate attached to a motor vehicle or trailer for official identificatio ...
s photographed, and they will receive a bill. The expected rates are for those with transponders, and for others. On May 4, 2010, the Turnpike Authority signed a contract with
TransCore Roper Technologies, Inc. (formerly Roper Industries, Inc.) is an American diversified industrial company that produces engineered products for global niche markets. The company is headquartered in Sarasota, Florida. Roper provides a wide range ...
to provide transponders. Drivers can, however, use their existing accounts; North Carolina becomes the only state to offer this option. 350,000 new transponders are expected to be issued in the first five years. Transponder sales began October 11, 2011. In later years, interoperability was established with the following ETC systems:
E-ZPass E-ZPass is an electronic toll collection system used on toll roads, toll bridges, and toll tunnels in the Eastern United States, Midwestern United States, and Southern United States. The E-ZPass Interagency Group (IAG) consists of member agenci ...
, Peach Pass and
SunPass SunPass is an electronic toll collection system within the state of Florida, United States. It was created in 1999 by the Florida Department of Transportation's (FDOT's) Office of Toll Operations, operating now as a division of Florida's Turnp ...
. At the time of its opening, residents in the area have complained about the tolls, considering that the new highway is the only toll road in North Carolina, and especially since other large sections of 540 have been completed without tolls. Business people who plan to use the highway, however, claim that the time savings will more than balance out the cost.


Toll rates

As of January 1, 2018, the total trip rate is $3.25 with the North Carolina Quick Pass and $5.00 via bill-by-mail. As of 2022, the total trip rate is $3.71 with the North Carolina Quick Pass and $5.68 via bill-by-mail. Listed below is the 2018 toll rate breakdown, by gantry:


History

The "Triangle Parkway" was first proposed in 1958, as part of Research Triangle Park. On February 16, 2005, it was one of four roads selected by the Turnpike Authority to be built as toll roads in North Carolina. The estimated cost was $69 million for between Davis Drive and NC 54. An additional $29 million could be spent extending that highway to McCrimmon Parkway in Morrisville, whose leaders opposed the idea. The original parkway route, however, had no real opponents. At the groundbreaking ceremony in 2009, Representative David Price pointed out that using tolls to finance this road "was not our first choice." Instead, area governments concluded the road would have taken 15 more years to complete any other way, so the decision to charge tolls came in 2005. The Western Wake Expressway from RTP to Holly Springs had been delayed earlier in the year, and the
legislature A legislature is an assembly with the authority to make laws for a political entity such as a country or city. They are often contrasted with the executive and judicial powers of government. Laws enacted by legislatures are usually known ...
had increased the number of toll projects allowed from four to nine. In July 2006, the legislature decided to allow the section of I-540 connecting the Triangle Parkway and Western Wake Expressway to be a toll road if the other two roads were also toll roads, even though the road was already being built. Federal approval for the use of tolls came in January 2007. The Turnpike Authority asked that the new section of road not be called an Interstate. Just before the July 2007 opening of the I-540 section between I-40 and NC 55, I-540 signs came down, replaced with NC 540 signs. Using the designation NC 540, a decision made in May 2007, was less confusing than giving the road an entirely new number. The name "Triangle Expressway" became official in May 2007, and turnpike board member Perry R. Safran said the committee also wanted the nickname "TriEx". On November 14, 2007, the board decided toll booths would not be used, and on June 5, 2008, the State House voted to approve $25 million a year for 39 years for the project. This would cover the difference between expected toll collections and actual costs.
Groundbreaking Groundbreaking, also known as cutting, sod-cutting, turning the first sod, or a sod-turning ceremony, is a traditional ceremony in many cultures that celebrates the first day of construction for a building or other project. Such ceremonies are ...
was held on August 12, 2009 at the west end of Interstate 540 (I-540). "A dozen dignitaries" used shovels painted gold as 150 watched. On December 8, 2011, the first leg of the Triangle Expressway opened to traffic. Toll collection began January 3, 2012. On August 1, 2012, the second section of the Triangle Expressway, from Research Triangle Park to U.S. 64, opened. Toll collection began the following day. On December 20, 2012, the section from U.S. 64 to NC 55 in Holly Springs opened with toll collection beginning in January. Toll rates change almost annually as required by the bond covenant created for the funding of the Expressway. Since its initial rate set at 2012, it has increased in 2013, 2015 and 2016. On January 20, 2017, the expressway was chosen as one of 10 testing locations for driverless cars. On June 30, 2022, Toll NC 147 was re-designated as Toll NC 885 as a part of the opening of the East End Connector Project.


Future

Planned as the next phase of the Triangle Expressway and the final segment of the Raleigh Beltway, the Triangle Expressway Southeast Extension (also known as the Southern and Eastern Wake Freeways) will traverse linking NC 540 and I-540, just south of Knightdale. Planning for the route started in 2010, but was put on hold on March, 2011 by the enactment of North Carolina Session Law 2011-7 (N.C. S.L. 2011-7). This law stated routes to study "shall not be located north of" the Orange Route, shown on maps for 20 years, potentially impacting
wetlands A wetland is a distinct ecosystem that is flooded or saturated by water, either permanently (for years or decades) or seasonally (for weeks or months). Flooding results in oxygen-free (anoxic) processes prevailing, especially in the soils. The p ...
and
endangered An endangered species is a species that is very likely to become extinct in the near future, either worldwide or in a particular political jurisdiction. Endangered species may be at risk due to factors such as habitat loss, poaching and in ...
mollusk Mollusca is the second-largest phylum of invertebrate animals after the Arthropoda, the members of which are known as molluscs or mollusks (). Around 85,000  extant species of molluscs are recognized. The number of fossil species is e ...
s. The
U.S. Army Corps of Engineers , colors = , anniversaries = 16 June (Organization Day) , battles = , battles_label = Wars , website = , commander1 = ...
opposed the Orange Route unless other potential routes could be found. A map unveiled August 22, 2012 shows the Lilac Route and the Plum Route, which would result in less environmental impact but would cause the loss of more homes. Planners hoped for a final route by 2014. On December 7, 2012, the
Federal Highway Administration The Federal Highway Administration (FHWA) is a division of the United States Department of Transportation that specializes in highway transportation. The agency's major activities are grouped into two programs, the Federal-aid Highway Program ...
and the
U.S. Army Corps of Engineers , colors = , anniversaries = 16 June (Organization Day) , battles = , battles_label = Wars , website = , commander1 = ...
replied to NCDOT saying they could not legally evaluate the Orange Route without comparing it to another route expected to cause less environmental harm. Since there is an impasse between the Federal government and the state regarding the issue, the federal funds for the project have been cut, putting the Southeast Extension on hiatus. A Draft Environmental Impact Statement released in late 2015 included 17 options, the Red Route included. Construction west of Interstate 40 would start in 2018 or later. The Lilac Route avoided the environmental problems of the Orange Route but like the Red Route would result in many homes being lost, and the Raleigh water treatment plant would also be affected. The Blue Route and Purple Route to the south of the others would cause the loss of even more homes. East of Interstate 40, there was no preferred route, and all of the options had problems. In June 2018, the federal government approved a 28.4 mile (45.71 km) extension of NC-540 which would complete the southern loop of NC-540 around Raleigh from the current terminus in Holly Springs to the Interstate 540 terminus in Knightdale. The project will be completed in multiple phases and cost approximately $2.24 billion.


Exit list

Note – Exit numbers are based on NC 885 or NC 540.


See also

* *


References


External links


North Carolina Turnpike Authority (NCTA)North Carolina Turnpike Authority (NCTA) website for the Triangle Expressway projectNCQuickPass Triangle Expressway Toll Guide
{{DEFAULTSORT:Triex Toll roads in North Carolina Research Triangle Freeways in North Carolina Transportation in Wake County, North Carolina Transportation in Durham County, North Carolina