Trianel Borkum West II
   HOME

TheInfoList



OR:

Trianel Windpark Borkum (formerly Borkum West II) is an offshore wind farm near Borkum. Its first phase of 40 turbines rated at a total capacity of 200 MW is operational, with a planned, additional 200 MW in a second phase. The project was approved for construction in 2008 and will cost over €1 billion to construct once fully operational (€900m for phase I alone). Originally known as Borkum West II the name was changed to Trianel Windpark Borkum in early 2013. Phase 1 of the installation was completed in the 4th quarter of 2014 and consist of 40 Areva M5000-116 turbines (5 MW turbines) on Tripod foundations. It was connected to the grid in August 2015. In the six months before March 2016 the wind farm produced 452.33  GWh, i.e. a
capacity factor The net capacity factor is the unitless ratio of actual electrical energy output over a given period of time to the theoretical maximum electrical energy output over that period. The theoretical maximum energy output of a given installation is def ...
of 51.6%. In September 2016
Senvion Senvion S.A. (called REpower Systems SE until 2014) was a German wind turbine manufacturer founded in 2001 in Germany, majority owned by a private equity firm. Senvion as REpower Systems, as it was initially called, was established in 2001 th ...
was awarded a conditional contract for the second phase, for 32 upgraded 6.2M152 turbines rated at a total capacity of 203 MW. A final investment decision was expected in the first half of 2017 after which construction could start in early 2018 for a planned completion in the fall of 2019. Cost is €184/MWh.


References


External links

Offshore wind farms in the North Sea Wind farms in Germany Borkum 2015 establishments in Germany Energy infrastructure completed in 2015 {{Germany-powerstation-stub