Texas LNG project
   HOME

TheInfoList



OR:

The Texas LNG project is a multi-decade
liquid natural gas Liquefied natural gas (LNG) is natural gas (predominantly methane, CH4, with some mixture of ethane, C2H6) that has been cooled down to liquid form for ease and safety of non-pressurized storage or transport. It takes up about 1/600th the vol ...
shipping terminal project near Brownsville, Texas. It has been in the planning stages since the early 2010s and, as of 2019, gained
regulatory authority A regulatory agency (regulatory body, regulator) or independent agency (independent regulatory agency) is a government agency, government authority that is responsible for exercising autonomous dominion over some area of human activity in a licen ...
approval for construction and operation in the 2020s, with initial export shipments as early as 2025. The facility is intended to enable US
natural gas Natural gas (also called fossil gas or simply gas) is a naturally occurring mixture of gaseous hydrocarbons consisting primarily of methane in addition to various smaller amounts of other higher alkanes. Low levels of trace gases like carbo ...
that is in good
supply Supply may refer to: *The amount of a resource that is available **Supply (economics), the amount of a product which is available to customers **Materiel, the goods and equipment for a military unit to fulfill its mission *Supply, as in confidenc ...
in the US to be efficiently stored and shipped to the global market in an efficient (liquified) form. The Texas LNG LLC company of Houston, Texas completed environmental review and received a permit from the Federal Energy Regulatory Commission (FERC) in 2019. The company is expected to make the final investment decision on the project no earlier than 2021, and start construction on the project as early as 2022.


Description

The project is intended, when fully built out circa 2030, to process up to 4 million tonnes of natural gas annually. Phase 1 of the project will process just half that, and could be operational as early as 2025. Phase 1 of the project will be able to process up to .


History

The United States has had a massive shift in LNG terminal planning and construction starting in 2010-2011 due to a rapid increase in US domestic natural gas supply with the widespread adoption of hydraulic fracking petroleum recovery technology. Many new LNG import terminals are planning or have begun addition of liquefaction facilities to operate as export terminals. Texas LNG LLC obtained the project site at the
Port of Brownsville The Port of Brownsville is a deep water seaport in Brownsville, at the southern tip of Texas. Geography The port is the southern terminus of the Gulf Intracoastal Waterway. The port is located near the river mouth of the Rio Grande and Lower R ...
in 2013 (on the north side of the
Brownsville Ship Channel The Port of Brownsville is a deep water seaport in Brownsville, Texas, Brownsville, at the southern tip of Texas. Geography The port is the southern terminus of the Gulf Intracoastal Waterway. The port is located near the river mouth of the Rio ...

Texas LNG -- Port of Brownsville
), and completed conceptual design and preliminary engineering in 2014. The front-end engineering and design (FEED) study for the project was completed by
Samsung Engineering Samsung Engineering Co., Ltd. ( ko, 삼성엔지니어링) is a Korean construction and project management (EPC&PM) company, it provides a full range of engineering services including feasibility studies, design, procurement, construction, and co ...
in 2016.Texas LNG Project, Brownsville, Texas
, nsenergybusiness.com, accessed 16 June 2020.
The final environmental impact statement was approved by the Federal Energy Regulatory Commission (FERC) in March 2019. On 21 November 2019, U.S. regulators approved the permit for Texas LNG LLC to build the facility, following an extensive environmental review. The specific approval was to build and operate the Texas LNG Brownsville LLC plant and shipping terminal at the
Port of Brownsville The Port of Brownsville is a deep water seaport in Brownsville, at the southern tip of Texas. Geography The port is the southern terminus of the Gulf Intracoastal Waterway. The port is located near the river mouth of the Rio Grande and Lower R ...
. One month after approval, the Sierra Club and other environmental groups asked the FERC to reconsider the permits, saying the agency failed to adequately consider environmental impacts. , the Texas LLC company was expected to make the final investment decision on the project no earlier than 2021, and start construction on the project as early as 2022, with the first phase of the project ready for commissioning by 2025. The second phase, with doubled capacity handling up to , could commence operations no earlier than 2027.


References

{{Reflist, 33em Liquefied natural gas terminals Energy infrastructure in Texas