Tesla Megapack
   HOME

TheInfoList



OR:

The Tesla Megapack is large-scale rechargeable
lithium-ion battery A lithium-ion or Li-ion battery is a type of rechargeable battery which uses the reversible reduction of lithium ions to store energy. It is the predominant battery type used in portable consumer electronics and electric vehicles. It also s ...
stationary energy storage product, intended for use at
battery storage power station A battery storage power station is a type of energy storage power station that uses a group of batteries to store electrical energy. Battery storage is the fastest responding dispatchable source of power on electric grids, and it is used to stab ...
s, manufactured by
Tesla Energy Tesla Energy is the clean energy subsidiary of Tesla, Inc. that develops, manufactures, sells and installs photovoltaic solar energy generation systems, battery energy storage products, as well as other related products and services to resid ...
, the clean energy subsidiary of
Tesla, Inc. Tesla, Inc. ( or ) is an American multinational automotive and clean energy company headquartered in Austin, Texas. Tesla designs and manufactures electric vehicles (electric cars and trucks), battery energy storage from home to grid- ...
Launched in 2019, each Megapack can store up to 3.9 megawatt-hours (MWh) of electricity. Each Megapack is a container that is sized slightly under the size of the
ISO ISO is the most common abbreviation for the International Organization for Standardization. ISO or Iso may also refer to: Business and finance * Iso (supermarket), a chain of Danish supermarkets incorporated into the SuperBest chain in 2007 * Iso ...
intermodal container An intermodal container, often called a shipping container, is a large standardized shipping container, designed and built for intermodal freight transport, meaning these containers can be used across different modes of transport – from ship ...
. Designed to be deployed by utility companies, Megapacks can be used to store energy generated by intermittent renewable power sources, such as solar and wind. The energy stored can be used by the grid as required, for example during periods of peak electricity demand. Tesla Energy also offers smaller battery energy storage devices: the Powerwall, intended for home use, and the Powerpack, intended for use by businesses or on smaller power utility projects.


History

On April 30, 2015, Tesla announced that it would begin to sell standalone battery storage products to consumers and utility companies. Tesla CEO
Elon Musk Elon Reeve Musk ( ; born June 28, 1971) is a business magnate and investor. He is the founder, CEO and chief engineer of SpaceX; angel investor, CEO and product architect of Tesla, Inc.; owner and CEO of Twitter, Inc.; founder of The ...
stated that the company's battery storage products could be used to improve the reliability of intermittent renewable energy sources, such as solar and wind. Prior to the launch of the Megapack, Tesla used its 200 kilowatt-hour (kWh) Powerpack energy storage product to meet the needs of utility companies with large-scale storage requirements. During 2015 and 2016, Tesla deployed a combined 300 MWh of Powerwall and Powerpack technology, including an 80 MWh deployment of Powerpacks at the Mira Loma substation in Southern California. In 2017, Tesla used Powerpacks to deploy 129 MWh of battery storage at the
Hornsdale Power Reserve Hornsdale Power Reserve is a 150 MW (194 MWh) grid-connected energy storage system owned by Neoen co-located with the Hornsdale Wind Farm in the Mid North region of South Australia, also owned by Neoen. The original installation in 2017 was the ...
in South Australia. At the time, this was the biggest deployment of lithium-ion grid battery storage in the world. Work began on the Megapack project at least as early as the first half of 2018. The Megapack was designed at
Giga Nevada Gigafactory Nevada (also known as Giga Nevada or Gigafactory 1) is a lithium-ion battery and electric vehicle component factory in Storey County, Nevada, US. The facility, located east of Reno, is owned and operated by Tesla, Inc., and suppl ...
. In July 2019, the Megapack was officially launched. The Megapack was described by Tesla as a utility-scale energy storage product, suitable for power stations and utility companies. Tesla claimed that Megapacks would be compatible with Tesla power station monitoring and energy control software, Powerhub and Autobidder. The company also stated that the Megapack was designed to meet the needs of large-scale battery storage projects, similar to the Hornsdale Power Reserve. Tesla acquired a former JC Penney's distribution center in
Lathrop, California Lathrop is a city located south of Stockton in San Joaquin County, California, United States. The 2022 California Census reported that Lathrop's population was 30,659. The city is located in the San Joaquin Valley in Northern California at th ...
, in 2021 for a new battery plant called the Megafactory, with a target capacity of 40 GWh/year when finished. The next-generation Megapacks is planned to use prismatic lithium iron phosphate batteries.


Specifications

Megapacks are currently manufactured at
Giga Nevada Gigafactory Nevada (also known as Giga Nevada or Gigafactory 1) is a lithium-ion battery and electric vehicle component factory in Storey County, Nevada, US. The facility, located east of Reno, is owned and operated by Tesla, Inc., and suppl ...
. Tesla has stated that it is investing in expanding the factory in order to increase Megapack, Model 3, and Model Y output efficiency. Megapacks are sold by Tesla's worldwide network of internal sales representatives and external partners. Each Megapack comes with a 15-year "no defect" and "energy retention" warranty, according to Tesla. A 10 or 20 year "performance guarantee" is also available for an additional cost. Once a Megapack has reached the end of its useful life, Tesla says they can be returned to be recycled. Tesla states that it supplies Megapacks ready-assembled, including "battery modules, bi-directional inverters, a thermal management system, an AC main breaker and controls." The Megapack thermal management system is located at the top of each unit. It uses coolant fluid, made of an equal-parts mixture of
ethylene glycol Ethylene glycol (IUPAC name: ethane-1,2-diol) is an organic compound (a vicinal diol) with the formula . It is mainly used for two purposes, as a raw material in the manufacture of polyester fibers and for antifreeze formulations. It is an odo ...
and water, to keep the battery at operating temperature. Maintenance must be performed on each Megapack once annually and once every ten years. The annual maintenance includes torque and calibration checks, inspections, cleaning, paint touchup, ventilation and coolant checks, and battery communications checks. The ten-year maintenance is required to perform activities such as replacing the pump that powers the thermal management system, replacing the door gasket, and refilling the coolant fluid. Maintenance is expected to take about an hour per Megapack. Each Megapack weighs approximately and the enclosure is built to the same size as a
shipping container A shipping container is a container with strength suitable to withstand shipment, storage, and handling. Shipping containers range from large reusable steel boxes used for intermodal shipments to the ubiquitous corrugated boxes. In the context of ...
and includes
twistlock A twistlock or twist lock, together with matching corner castings, as defined in norms including ISO 1161:1984, form a standardized (rotating) connector system, for connecting and securing intermodal, and predominantly ISO-standard internatio ...
fittings to allow for easier handling.


Market and use cases

Megapacks are designed to be used for large-scale energy storage. Tesla has stated that Megapacks could be used by utility companies to replace peaker power plants, which generate extra energy during periods of peak demand. Megapacks are designed to store energy that can be later used during periods of surplus demand, rather than a peaker power plant having to generate the energy in real-time using coal or natural gas. It has been shown that grid battery storage can help to reduce power plant carbon dioxide emissions and unit costs of energy production. Tesla Powerpacks continue to be used by utility companies to meet smaller-scale grid energy storage requirements. For example, a 25 MW / 52 MWh deployment of Powerpacks began testing in November 2019 at the
Lake Bonney Wind Farm Lake Bonney Wind Farm, in South Australia, was built in three stages. Stage 1 comprises 46 turbines each having a rated capacity of 1.75 MW (total 80.5 MW) and was finished in March 2005. Construction of Stage 2 began in November 2006 ...
in South Australia. Large-scale battery storage solutions such as the Megapack are becoming more economically viable for utility companies to implement due to the declining price of lithium-ion battery technology. Demand for energy storage is also increasing in some jurisdictions due to transitions towards renewable energy sources. Because solar and wind energy sources are more intermittent than coal or natural gas or nuclear power, the electrical energy can be stored in order to fulfill peak-period demand. Other energy storage solutions, such as pumped hydroelectric storage, continue to dominate the market. As of 2019, pumped hydroelectric storage accounted for 96% of global energy storage capacity. Pumped hydroelectric storage systems have relatively long lifetimes when compared to battery storage. Battery storage solutions such as the Megapack can be used in situations where a fast deployment is required, because pumped hydro projects normally take longer to complete when compared to batteries. Tesla has previously used fast deployment as a selling point of its utility-scale battery storage products.


Deployments


Completed deployments

In November 2019, Tesla used a Megapack to power a mobile Supercharger - a recharging station for Tesla electric vehicles - in California. The mobile Supercharger was reported to deliver 125 kW, and was transported on a flat trailer attached to a truck in between deployment locations. In December 2019, Tesla delivered a 1.25 MW / 2.5 MWh Megapack to the Millidgeville Substation in Saint John, Canada. Saint John Energy, the owner of the Megapack, stated that it will be used for
peak shaving Load management, also known as demand-side management (DSM), is the process of balancing the supply of electricity on the network with the electrical load by adjusting or controlling the load rather than the power station output. This can be ach ...
. The battery is estimated to save Saint John Energy CA$200,000 per year. Saint John Energy planned to integrate the battery to work with its grid management software. It became operational on April 3, 2020, and is being used for peak-shaving. In July 2021, at the 300 MW Victorian Big Battery (377 to 450 MWh energy, depending on power draw) near Geelong and constituting the largest battery in the southern hemisphere, one of the 212 modules of Tesla Megapack caught fire due to a coolant leak while the battery was unmonitored, and set fire to the adjacent Megapack. Three days later, the fire had burnt itself out, and the commissioning process resumed in late September, while lessons were applied to other batteries. The battery was commissioned on time in December 2021, a year after contract, with an estimated ROI of 2.4.


Planned deployments

In May 2020, Strata Solar, an American commercial solar services provider, announced that they would engage Tesla as the battery provider for a 100 MW / 400 MWh energy storage facility in
Ventura County Ventura County () is a County (United States), county in Southern California, the southern part of the U.S. state of California. As of the 2020 United States Census, 2020 census, the population was 843,843. The largest city is Oxnard, California ...
, California. The Megapack deployment will replace a natural-gas powered peaker power plant, and will take up three acres of space near the Ventura County Juvenile Justice Center. The project was scheduled to begin in July 2020, with completion expected by January 2021.


Moss Landing project

Utilities in California are required by a 2013 law to provide significant battery storage by 2024. In June 2018, Pacific Gas and Electric Company (PG&E) requested approval from the
California Public Utilities Commission The California Public Utilities Commission (CPUC or PUC) is a regulatory agency that regulates privately owned public utilities in the state of California, including electric power, telecommunications, natural gas and water companies. In addition ...
to engage Tesla to deploy a battery storage system at the
Moss Landing Power Plant The Moss Landing Power Plant is a natural gas powered electricity generation plant located in Moss Landing, California, United States, at the midpoint of Monterey Bay. Its large stacks are landmarks, visible throughout the Monterey Bay Area. T ...
, in Monterey County. The system is capable of producing 182.5 MW for four hours, for a total of 730 MWh of capacity. It became one of the world's largest utility-owned battery storage installations. The project is designed to improve energy reliability and to allow for more renewable energy sources to be used at the Moss Landing site. The project also aims to save costs by reducing PG&E's reliance on peaker power plants that come online during periods of increased demand. Tesla later confirmed that it would use Megapacks to complete the project. On July 3, 2019, in accordance with the
California Environmental Quality Act The California Environmental Quality Act (CEQA) is a California statute passed in 1970 and signed in to law by then-Governor Ronald Reagan, shortly after the United States federal government passed the National Environmental Policy Act (NEPA), t ...
, the County of Monterey Resource Management Agency published a Mitigated Negative Declaration, detailing actions that must be taken to mitigate potential environmental impacts of the project. The report concluded that the project would have a "Less than Significant Impact" on the environment, assuming the correct mitigating actions were taken. Specifically, it was found that mitigating actions were required to minimize the environmental impact of the project on "biological resources" such as wildlife habitat, and on "cultural resources", especially culturally-significant archaeological sites at the proposed location of the Megapack deployment. The project was subsequently opened to public submissions on its environmental impact. On February 26, 2020, the Monterey County Planning Commission unanimously approved the project, giving PG&E and Tesla permission to proceed with the Megapack deployment. In April 2022, Tesla and PG&E completed and commissioned the Elkhorn Battery. Following the completion of final tests, the BESS was fully energised and certified by the California Independent System Operator (CAISO) on April 7. The final build features 256 Megapacks manufactured in Lathrop, and set on 33 concrete slabs, as well as transformers and switchgears to connect the batteries to the 115kv electric transmission system. On September 20, a module caught fire, which was under control by evening.


References


External links

* {{Tesla, Inc. Megapack Grid energy storage Lithium-ion batteries Products introduced in 2019 2019 in technology