TE Rijeka
   HOME

TheInfoList



OR:

The Rijeka Thermal Power Station ( hr, Termoelektrana Rijeka, TE Rijeka, also known as ''TE Urinj'') is an oil-fired power station east of Rijeka at
Kostrena Kostrena ( it, Costrena) is a Croatian municipality east of Rijeka on the Kvarner Bay. It is famous for its beaches and a long tradition of seafaring and seamanship. Because of its rocky beaches and a walkway that goes along the shoreline, it is ...
,
Croatia , image_flag = Flag of Croatia.svg , image_coat = Coat of arms of Croatia.svg , anthem = "Lijepa naša domovino"("Our Beautiful Homeland") , image_map = , map_caption = , capit ...
. It was built between 1974 and 1978 and it has one generation unit with capacity of 320 MW. The height of the boiler house including its rooftop
flue gas stack A flue-gas stack, also known as a smoke stack, chimney stack or simply as a stack, is a type of chimney, a vertical pipe, channel or similar structure through which combustion product gases called flue gases are exhausted to the outside air. Flue g ...
is . Turbine for the power station was supplied by
Ansaldo Energia Ansaldo Energia S.p.A. is an Italian power engineering company. It is based in Genoa, Italy. The absorbed parent company, Gio. Ansaldo & C., started in 1853. It was taken over by Leonardo S.p.A. In 2011, Leonardo S.p.A. sold 45% stake in An ...
. Ansaldo Energia was also awarded engineering, procurement and construction contract. Boilers were supplied by
Waagner-Biro Waagner Biro is a Vienna-based group of companies formerly part of the same group which have developed into separately owned, independent companies operating in steel and mechanical engineering. Collectively, the companies have about 1000 employees ...
. The power station is owned and operated by
Hrvatska elektroprivreda Hrvatska elektroprivreda (HEP Group) is a national power company in Croatia which has been engaged in electricity production, transmission and distribution for more than one century, and with heat supply and gas distribution for the past few dec ...
. Its annual production varies, averaging 917 GWh, but only 141 GWh in 2011. It is expected to undergo decommissioning in 2020, but it is doubtful that it will remain operational until then because of its pollution problem. , Rijeka Thermal Power Station is offline, ready to resume generation within 160 hours of notice. On 18 October 2022, it was unofficially reported that HEP plans to restart the operation of the power plant in order to cover the losses incurred during the energy crisis.


References

{{Authority control Oil-fired power stations in Croatia Energy infrastructure completed in 1978 Buildings and structures in Primorje-Gorski Kotar County