Stirling and Dunfermline Railway
   HOME

TheInfoList



OR:

The Stirling and Dunfermline Railway was a railway in Scotland connecting
Stirling Stirling (; sco, Stirlin; gd, Sruighlea ) is a city in central Scotland, northeast of Glasgow and north-west of Edinburgh. The market town, surrounded by rich farmland, grew up connecting the royal citadel, the medieval old town with its me ...
and
Dunfermline Dunfermline (; sco, Dunfaurlin, gd, Dùn Phàrlain) is a city, parish and former Royal Burgh, in Fife, Scotland, on high ground from the northern shore of the Firth of Forth. The city currently has an estimated population of 58,508. Accord ...
. It was planned by the Edinburgh and Glasgow Railway to get access to the mineral deposits on the line of route, but also as a tactical measure to keep the rival Caledonian Railway out of Fife. There were serious difficulties at the time of opening about a commitment to lease the railway, but it finally opened throughout in 1852. There was a branch to Tillicoultry, and the Devon Valley Railway built a line from there to Kinross.. A predecessor line, the Alloa Railway, had been developed as a horse-operated waggonway in the eighteenth century, bringing coal from the hinterland to Alloa and Clackmannan harbours; in its day the line was technologically advanced, but it was eclipsed by the modern Stirling and Dunfermline line. The Alva Railway built a short branch line from Cambus, on the Stirling and Dunfermline line, opening in 1863. Finally the Caledonian Railway built a viaduct over the Forth at Alloa, and the Caledonian and the North British Railway (which had taken over the Stirling and Dunfermline Railway) collaborated in operating the new short cut; much passenger and goods traffic ran over the bridge; the route was shared, with each company having running powers over the other's line. All these lines closed in the period following 1950 when rail travel was waning, but the section between Stirling and Alloa has reopened in 2008, and carries a regular passenger service.


History


Before railways

Dunfermline and Stirling had long been centres of commerce, and of regional government, and of industry. Intermediately, the town of Alloa, also situated close to the Forth, was an important industrial centre, known for brewing, glass manufacture, woollen goods, and collieries. On the north side of the tract of land following the Forth the
Ochil Hills The Ochil Hills (; gd, Monadh Ochail is a range of hills in Scotland north of the Forth valley bordered by the towns of Stirling, Alloa, Kinross, Auchterarder and Perth. The only major roads crossing the hills pass through Glen Devon/ Gl ...
present a natural barrier to northwards travel, being closest at the Stirling end.


The Alloa Railway

The Earls of Mar owned extensive lands in the hinterland of Alloa, and for some centuries coal had been produced from pits on the estate. An extensive system of waggonways, initially wooden railed, later wood with iron facings, was installed from about 1768 to move the coal, using horsepower and gravity, from the pits downhill to the
Forth Forth or FORTH may refer to: Arts and entertainment * ''forth'' magazine, an Internet magazine * ''Forth'' (album), by The Verve, 2008 * ''Forth'', a 2011 album by Proto-Kaw * Radio Forth, a group of independent local radio stations in Scotla ...
.


A frenzy of railway authorisation

In 1842 the
Edinburgh and Glasgow Railway The Edinburgh and Glasgow Railway was authorised by Act of Parliament on 4 July 1838. It was opened to passenger traffic on 21 February 1842, between its Glasgow Queen Street railway station (sometimes referred to at first as Dundas Street) and ...
opened its main line, and intercity railway travel was possible in Scotland. The line was immediately profitable, and showed that an inter-city railway could be a commercial success. The English railway network was growing in density and thoughts now turned, not merely towards connecting to the English system, but to the formation of a Scottish network too. The easy availability of money resulted in a very considerable number of Scottish lines being proposed in the following years, and in the 1845 Parliamentary session many were authorised. Among them were the
Edinburgh, Perth and Dundee Railway The Edinburgh and Northern Railway was a railway company authorised in 1845 to connect Edinburgh to both Perth and Dundee. It relied on ferry crossings of the Firth of Forth and the Firth of Tay, but despite those disadvantages it proved extrem ...
, planned to cross Fife from a ferry pier at Burntisland to Perth, and to a ferry pier on the Tay opposite Broughty Ferry. Also authorised was the
North British Railway The North British Railway was a British railway company, based in Edinburgh, Scotland. It was established in 1844, with the intention of linking with English railways at Berwick. The line opened in 1846, and from the outset the company followe ...
(to build from Edinburgh to Berwick, and the
Scottish Central Railway The Scottish Central Railway was formed in 1845 to link Perth and Stirling to Central Scotland, by building a railway line to join the Edinburgh and Glasgow Railway near Castlecary. The line opened in 1848 including a branch to South Alloa. The ...
, to build from the Edinburgh and Glasgow line near Castlecary to Perth, and the
Caledonian Railway The Caledonian Railway (CR) was a major Scottish railway company. It was formed in the early 19th century with the objective of forming a link between English railways and Glasgow. It progressively extended its network and reached Edinburgh an ...
, to build from Glasgow and Edinburgh to Carlisle. The fragmented nature of these authorisations resulted in an immediate search for alliances, and even before much construction had taken place, some companies' boards thought it essential to seek to control as much territory as possible, by friendly alliance or by takeover. Many of these alliances were quickly agreed, and in many cases without much strategic thought.


Authorisation of the S&DR

The Edinburgh, Perth and Dundee Railway (successor to the
Edinburgh and Northern Railway The Edinburgh and Northern Railway was a railway company authorised in 1845 to connect Edinburgh to both Perth and Dundee. It relied on ferry crossings of the Firth of Forth and the Firth of Tay, but despite those disadvantages it proved extreme ...
) was authorised to make a branch from Thornton (near present-day Glenrothes) to Dunfermline. Dunfermline was an ancient seat of government and industry, but it was the minerals, especially coal, in the area which encouraged the building of a line. The Edinburgh and Glasgow Railway too saw that potential, and promoted a nominally independent company, the Stirling and Dunfermline Railway, which would capture the Alloa coalfield and develop other mineral locations at Dunfermline and elsewhere on the line of route The Edinburgh and Glasgow Railway sought to expand northwards and formed an alliance with the Scottish Central Railway, and submitted a Parliamentary Bill for the 1846 session for a ''Stirling and Dunfermline Railway''. As well as opening up a considerable area of agricultural land, the line would give the E&GR access to areas of mineral extraction along the line of route, and beyond Dunfermline as well. Coal was the dominant mineral, but some blackband ironstone was being extracted and limestone was being fired on the northern shore of the Forth. A Special Meeting of E&GR shareholders was held on 12 May 1846 to give approval to the merger and the promotion of the Stirling and Dunfermline line.Falkirk Herald and Stirlingshire Monthly Advertiser, 14 May 1846 A 35-year lease contract had been agreed, paying 4% rent on the construction cost of the S&D after 35% of receipts for operating expenses.Dundee, Perth, and Cupar Advertiser: Friday 12 September 1845 The Stirling and Dunfermline Railway was authorised on 16 July 1846. As well as the main line between the places in the name, branches were authorised to Tillicoultry and to Alloa Harbour. The authorised capital for over 24 miles of railway was £390,000. In 1847 and again in 1848 a number of diversions of the route, and of local tramways, were authorised.E F Carter, ''An Historical Geography of the Railways of the British Isles'', Cassell, London, 1959 The planned merger of the E&GR and the Scottish Central Railway "on equal terms" would give the E&GR the necessary access to Stirling; however during 1847 the Scottish Central reconsidered its alliance, and it decided that the Caledonian Railway, with which it was to connect near Castlecary, would be a better partner, and it rejected the intended link with the E&GR. Suddenly the E&GR found that it had no railway link to the S&DR, and the S&DR found itself isolated.


Opening

A line from Dunfermline to Charlestown Harbour was already in existence, and the S&D line was constructed from east to west, taking advantage of the facility. The first section, from Dunfermline to Oakley, opened on 13 December 1849. There were ironstone and coal deposits at Oakley, and in 1845 the Forth Iron Works started construction of its plant there. It began production the following year.Extract from Mining District Report, 1847, on Scottish Mining Website http://www.scottishmining.co.uk/107.htmlDescription of Carnock Parish in 1862; edited extract from ''Westwood's Directory for the Counties of Fife & Kinross'', published 1862, on Genuki website at http://www.genuki.org.uk/big/sct/FIF/parishes/Carnock/ The line was extended to Alloa on 28 August 1850. On 3 June 1851 a branch to Alloa Harbour, already connected to the Alloa Railway, was opened, together with the Tillicoultry branch. In addition a passenger station was opened at the harbour; it was named Alloa Ferry, opening the same day. There was a long established ferry service crossing the Forth at this point, and the Scottish Central Railway had opened a branch from its main line to South Alloa, meeting the ferry on the south side, on 12 September 1850.Gordon Stansfield, ''Stirlingshire and Clackmannanshire's Lost Railways'', Stenlake Publishing, Catrine 2002, The Tillicoultry branch had been delayed because of difficulties in constructing a bridge over the River Devon at Glenfoot. Although the final section to Stirling was relatively short, the opening of that part of the line was much delayed by a dispute. The Stirling and Dunfermline company had never intended to operate the line itself, and had contracted with its sponsor, the Edinburgh and Glasgow Railway, that the latter would lease the line and operate it on its completion. Since that time the E&GR had failed to acquire the Scottish Central Railway, which lay between the two lines, and the SCR had become hostile. The E&GR had other priorities and now saw that operating a remote section of line would be a considerable liability, and it declined to do so. The Edinburgh and Glasgow Railway had undertaken to lease and work the line on the assumption of merging with the Scottish Central Railway, but this arrangement had fallen through. As the day of opening of the S&DR approached, it became obvious that the E&GR intended to evade its obligations to lease and work the line. On 6 April 1849 the Engineer Miller issued a certificate that the line was complete (to Oakley) but the E&GR declined to lease it as had been agreed.Caledonian Mercury, 1 October 1849 Faced with legal action to force compliance, the E&GR used the letter of the contract it had made with the S&DR, insisting on completion of the S&DR as authorised, and declining to accept any deviation at Stirling to accommodate a connection with the SCR. (The SCR was prepared to accept the S&DR crossing the Forth at Stirling on its bridge there, and using their station, but the E&GR insisted on separate facilities being provided. Nonetheless "Dunfermline Line Junction" at Stirling was a recognised location south of Stirling station into the 1970s.) The S&DR had not the resources to operate the line itself and applied for legal sanction to oblige the E&GR to comply with its obligation, and the E&GR used every device to avoid compliance. In particular in demanded that the S&DR build an independent line crossing the Forth at Stirling, and station facilities there (in accordance with the original Parliamentary authority), even though the SCR had indicated that it was prepared to allow the SCR to use its bridge and terminal. Eventually on 1 July 1852 the line was opened throughout to Stirling. The passenger service at Alloa Ferry was closed on the same day, having been little used. A connection between the S&DR and the SCR lines was soon made south of the river at Stirling and the unnecessary S&DR terminal station fell into disuse.Peter Marshall, ''The Scottish Central Railway: Perth to Stirling'', Oakwood Press, Usk, 1998, Even now the E&GR refused to operate the line, and the S&DR had to acquire three locomotives and the rolling stock to do so itself.Marshall states that the E&NR and the SCR together worked the line; it is likely that this is correct, but that they made their willingness conditional on the S&DR actually procuring the locomotives. Nonetheless the railway was open, and a normal train service was in operation.


Company takeovers

The Stirling and Dunfermline Company was vested in the
Edinburgh and Glasgow Railway The Edinburgh and Glasgow Railway was authorised by Act of Parliament on 4 July 1838. It was opened to passenger traffic on 21 February 1842, between its Glasgow Queen Street railway station (sometimes referred to at first as Dundas Street) and ...
(E&GR) by Act of 28 July 1858. The E&GR was already a significant player: it opened its main line in 1842. Having started as an inter-city line the E&GR had been collaborating with the
Monkland Railways The Monkland Railways was a railway company formed in 1848 by the merger of three "coal railways" that had been built to serve coal and iron pits around Airdrie in Central Scotland, and connect them to canals for onward transport of the minerals ...
and others in handling coal and iron in the west of Scotland, which became a dominant traffic. Now it had access to Dunfermline, and the west Fife coalfield. The E&GR itself was taken over by the North British Railway on 1 August 1865. The Scottish Central Railway was absorbed by the Caledonian Railway in 1865.


The Alva Railway

Alva was a significant manufacturing town, especially of woollens and textiles, located north of the Stirling and Dunfermline Railway, under the Ochil hills. The Alva Railway was incorporated by Act of Parliament on 22 July 1861; it was to be a 3½ mile branch to Alva from Cambus on the S&DR main line, with an intermediate station at
Menstrie Menstrie (Scottish Gaelic: ) is a village in the county of Clackmannanshire in Scotland. It is about east-northeast of Stirling and is one of a string of towns that, because of their location at the foothill base of the Ochil Hills, are collec ...
. It opened on 11 June 1863.Carter, page 330, and Awdry, page 116; Thomas and Turnock say 3 June. There was an important distillery at Glenochil, near Menstrie.William Scott Bruce, ''The Railways of Fife'', The Melven Press, Edinburgh, 1980, The Alva Railway merged with the E&GR by Act of 23 June 1864, with effect from 31 July 1864. The line had a busy passenger service, nine daily departures in 1922 and 10 in 1949 with a late Saturdays-only service from Alloa to Alva and back. The Alva branch closed to passenger trains on 1 November 1954, but a general goods service continued until 1964, with company trains to Menstrie continuing until January 1965.


Alloa docks enlarged

In 1875, the NBR agreed to provide new sidings to the newly enlarged Alloa docks, but complications with the adaptation of the Alloa Coal Company's high level tramway delayed their connection for two years.David Ross, ''The North British Railway: A History'', Stenlake Publishing Limited, Catrine, 2014,


The railway across the Forth

The Alloa Railway was built to connect
Alloa Alloa (Received Pronunciation ; educated Scottish pronunciation /ˈaloʊa/; gd, Alamhagh, possibly meaning "rock plain") is a town in Clackmannanshire in the Central Lowlands of Scotland. It is on the north bank of the Forth at the spot where ...
to the south via a bridge over the
River Forth The River Forth is a major river in central Scotland, long, which drains into the North Sea on the east coast of the country. Its drainage basin covers much of Stirlingshire in Scotland's Central Belt. The Gaelic name for the upper reach of th ...
. The Company authorised to do this was acquired by the
Caledonian Railway The Caledonian Railway (CR) was a major Scottish railway company. It was formed in the early 19th century with the objective of forming a link between English railways and Glasgow. It progressively extended its network and reached Edinburgh an ...
before it opened the line in 1885. The line was connected to the
North British Railway The North British Railway was a British railway company, based in Edinburgh, Scotland. It was established in 1844, with the intention of linking with English railways at Berwick. The line opened in 1846, and from the outset the company followe ...
and used their station in .


The Devon Valley Railway

Proposals to link Stirling and Kinross through Tillicoultry had been formulated early in the history of railways in the region, and when the Tillicoultry branch of the Stirling and Dunfermline Railway was authorised, promoters planned a railway from Tillicoultry to Kinross. As such it would complete a line from the Clyde to the Tay. This became the
Devon Valley Railway The Devon Valley Railway linked Alloa and Kinross in central Scotland, along a route following the valley of the River Devon. Its construction took 20 years from the first section opening in 1851, to the final section in 1871. Three railway ...
which was authorised by Parliament on 23 July 1858, but although parts of the line were quickly completed, difficult conditions in the central section meant that it was not until 1 May 1879 that it opened throughout. It was absorbed by the North British Railway on 29 June 1875.Thomas and Turnock, page 36


The Kincardine line

The Caledonian Railway was constantly trying to penetrate the Fife area to get access to east coast harbours and the coalfields. In an attempt to forestall one such scheme, the North British Railway itself obtained authorisation for a coastal line from Alloa through Clackmannan to Kincardine. It opened on 18 December 1893, and was extended to Dunfermline on 30 June 1906.Thomas and Turnock, page 38


Passenger services, 1895

In an 1895 edition of Bradshaw, there were 12 westbound and 11 eastbound trains between Stirling and Dunfermline, as well as some short working between Alloa and Stirling. Some trains omitted all or most stops between Dunfermline and Alloa. Nine trains left Alloa for Tillicoultry and beyond, and six left Alloa for Larbert. The Alva branch had 12 round trips, most of them continuing from Cambus to Alloa. Five trains, six on Saturdays, left Alloa for Kincardine. None of these services operated on Sundays.''Bradshaw's General Steam Navigation and Railway Guide'', 12th mo, (December) 1895, reprinted by Middleton Press, Midhurst, 2011,


Closure

In the period following 1950 the increased use of road transport for passenger and goods led to a steep decline in the use of the lines, and passenger trains on the Alva branch ceased to run from 1 November 1954. A limited service to Menstrie continued until complete closure on 2 March 1964. The S&DR Tillicoultry branch, by then regarded as part of the Devon Valley line, closed to passengers on 15 June 1964 and to goods traffic on 25 June 1973. NBR route passenger trains over the Alloa Viaduct were withdrawn from 29 January 1968,Thomas and Turnock page 312; 16 March according to Paterson, pages 85 and 86. and through goods train operation ceased in May 1968. A limited goods service to supply coal to the stationary steam engine that operated the Forth Swing Bridge from Alloa continued until May 1970. Passenger services on the Stirling to Dunfermline main line were closed on 7 October 1968; through goods services were closed on 10 October 1979. West of Dunfermline, the line through Dunfermline Upper station served Oakley Colliery until 1984. The line remained in place as far as Oakley until 1993, but was subsequently lost to road development within Dunfermline. Just eight years later, studies began for the reopening of the western end of the line from Stirling to Alloa, as part of the Stirling-Alloa-Kincardine rail link. Thomas and Turnock


Re-opening

Under Scottish Executive funding and to relieve congestion on the
Forth Railway Bridge The Forth Bridge is a cantilever railway bridge across the Firth of Forth in the east of Scotland, west of central Edinburgh. Completed in 1890, it is considered a symbol of Scotland (having been voted Scotland's greatest man-made wonder in ...
the line between
Stirling Stirling (; sco, Stirlin; gd, Sruighlea ) is a city in central Scotland, northeast of Glasgow and north-west of Edinburgh. The market town, surrounded by rich farmland, grew up connecting the royal citadel, the medieval old town with its me ...
and Alloa was reopened in 2008.Stirling-Alloa-Kincardine re-opening Web Site
There is now (2015) an hourly passenger service on the Alloa to Stirling section.Scotrail timetable: Central Scotland https://www.scotrail.co.uk/sites/default/files/assets/download_ct/sr1505_dl_central_scotland_compiled_0.pdf


Route


Notes


References


External links


Railscot on Stirling and Dunfermline Railway
{{Historical Scottish railway companies North British Railway Closed railway lines in Scotland Early Scottish railway companies Railway lines opened in 1849