STS-41-D
   HOME

TheInfoList



OR:

STS-41-D (formerly STS-14) was the 12th flight of
NASA The National Aeronautics and Space Administration (NASA ) is an independent agency of the US federal government responsible for the civil space program, aeronautics research, and space research. NASA was established in 1958, succeedin ...
's
Space Shuttle program The Space Shuttle program was the fourth human spaceflight program carried out by the U.S. National Aeronautics and Space Administration (NASA), which accomplished routine transportation for Earth-to-orbit crew and cargo from 1981 to 2011. I ...
, and the first mission of Space Shuttle ''Discovery''. It was launched from
Kennedy Space Center The John F. Kennedy Space Center (KSC, originally known as the NASA Launch Operations Center), located on Merritt Island, Florida, is one of the National Aeronautics and Space Administration's (NASA) ten field centers. Since December 196 ...
,
Florida Florida is a state located in the Southeastern region of the United States. Florida is bordered to the west by the Gulf of Mexico, to the northwest by Alabama, to the north by Georgia, to the east by the Bahamas and Atlantic Ocean, and ...
, on August 30, 1984, and landed at
Edwards Air Force Base Edwards Air Force Base (AFB) is a United States Air Force installation in California. Most of the base sits in Kern County, but its eastern end is in San Bernardino County and a southern arm is in Los Angeles County. The hub of the base is ...
,
California California is a state in the Western United States, located along the Pacific Coast. With nearly 39.2million residents across a total area of approximately , it is the most populous U.S. state and the 3rd largest by area. It is also the m ...
, on September 5, 1984. Three commercial
communications satellite A communications satellite is an artificial satellite that relays and amplifies radio telecommunication signals via a transponder; it creates a communication channel between a source transmitter and a receiver at different locations on Earth ...
s were deployed into orbit during the six-day mission, and a number of scientific experiments were conducted, including a prototype extendable solar array that would eventually form the basis of the main solar arrays on the International Space Station (ISS). The mission was delayed by more than two months from its original planned launch date, having experienced the Space Shuttle program's first launch abort at T-6 seconds on June 26, 1984.


Crew


Crew seat assignments


Mission background

The launch was originally planned for June 25, 1984, but because of a variety of technical problems, including rollback to the
Vehicle Assembly Building The Vehicle Assembly Building (originally the Vertical Assembly Building), or VAB, is a large building at NASA's Kennedy Space Center (KSC), designed to assemble large pre-manufactured space vehicle components, such as the massive Saturn V and t ...
(VAB) to replace a faulty
Space Shuttle Main Engine The Aerojet Rocketdyne RS-25, also known as the Space Shuttle Main Engine (SSME), is a liquid-fuel cryogenic rocket engine that was used on NASA's Space Shuttle and is currently used on the Space Launch System (SLS). Designed and manufactu ...
(SSME), the launch was delayed by over two months. The June 26, 1984, launch attempt marked the first time since
Gemini 6A Gemini 6A (officially Gemini VI-A) With Gemini IV, NASA changed to Roman numerals for Gemini mission designations. was a 1965 crewed United States spaceflight in NASA's Gemini program. The mission, flown by Wally Schirra and Thomas P. Staffor ...
that a crewed spacecraft had experienced a shutdown of its engines just prior to launch.


June 1984 launch attempt

During the June 26, 1984, launch attempt, there was a launch abort at T–6 seconds, followed by a pad fire about ten minutes later. Because the center engine had not started when the abort was triggered, confusion ensued as the
flight controller Flight controllers are personnel who aid space flight by working in such Mission Control Centers as NASA's Mission Control Center or ESA's European Space Operations Centre. Flight controllers work at computer consoles and use telemetry to ...
s were unable to verify its state:
Commentary: "We have a cut off".
"NTD 'NASA Test Director''we have a RSLS 'Redundant Set Launch Sequencer''abort". Commentary: "We have an abort by the onboard computers of the orbiter Discovery".
"Break break, break break, GLS 'Ground Launch Sequencer''shows engine one not shut down".
"OK, PLT 'pilot''"
"CSME 'Space Shuttle Main Engines''verify engine one".
"You want me to shut down engine one?"
"We do not show engine start on one".
"OTC 'Orbiter test conductor''I can verify shutdown on verify on engine one, we haven't start prepped engine one".
"All engines shut down I can verify that". Commentary: "We can now verify all three engines have been shut down".
"We have red lights on engines two and three in the cockpit, not on one".
"All right, CSME verify engine one safe for APU 'auxiliary_power_unit''.html" ;"title="auxiliary_power_unit.html" ;"title="'auxiliary power unit">'auxiliary power unit''">auxiliary_power_unit.html" ;"title="'auxiliary power unit">'auxiliary power unit''shutdown".
"If I can verify that?"
"OTC GPC [''General Purpose Computer''] go for APU shutdown".
Mission Specialist Steve Hawley was reported as saying following the abort: "Gee, I thought we'd be a lot higher at MECO (Main Engine Cut-Off)!"."Roundup"
NASA June 2007 Retrieved June 21, 2013
About ten minutes later, the following was heard on live TV coverage:
"We have indication two of our fire detectors on the zero level; no response. They're side by side right next to the engine area. The engineer requested that we turn on the heat shield fire water which is what could be seen spraying up in the vicinity of the engine bells of ''Discovery''s three main engines".
While evacuating the shuttle, the crew was doused with water from the pad deluge system, which was activated due to a hydrogen fire on the launch pad caused by the free hydrogen (fuel) that had collected around the engine nozzles following the shutdown and engine anomaly. Because the fire was invisible to humans, had the astronauts used the normal emergency escape procedure across the service arm to the slidewire escape baskets, they would have run into the fire. Changes to procedures resulting from the abort included more practicing of "safing" the orbiter following aborts at various points, the use of the fire suppression system in all pad aborts, and the testing of the slidewire escape system with a real person ( Charles F. Bolden Jr.). It emerged that launch controllers were reluctant to order the crew to evacuate during the STS-41-D abort, as the slidewire had not been ridden by a human. Examination of telemetry data indicated that the engine malfunction had been caused by a stuck valve that prevented proper flow of LOX into the combustion chamber.


Mission summary

STS-41-D launched on 08:41:50 a.m. EDT on August 30, 1984, after a six-minute, fifty-second delay when a private aircraft flew into the restricted airspace near the launch pad. It was the fourth launch attempt for ''Discovery''. Because of the two-month delay, the STS-41-F mission was canceled (STS-41-E had already been canceled), and its primary payloads were included on the STS-41-D flight. The combined cargo weighed over , a record for a Space Shuttle payload up to that time. The six-person flight crew consisted of Henry W. Hartsfield Jr., commander, making his second shuttle mission; pilot Michael L. Coats; three mission specialists – Judith A. Resnik, Richard M. Mullane and Steven A. Hawley; and a payload specialist, Charles D. Walker, an employee of
McDonnell Douglas McDonnell Douglas was a major American aerospace manufacturing corporation and defense contractor, formed by the merger of McDonnell Aircraft and the Douglas Aircraft Company in 1967. Between then and its own merger with Boeing in 1997, it ...
. Walker was the first commercially sponsored payload specialist to fly aboard the Space Shuttle. Resnik became the second American woman to fly any NASA space mission, after Sally K. Ride. Primary cargo of ''Discovery'' consisted of three commercial
communications satellite A communications satellite is an artificial satellite that relays and amplifies radio telecommunication signals via a transponder; it creates a communication channel between a source transmitter and a receiver at different locations on Earth ...
s: SBS-4 for Satellite Business Systems, Telstar 302 for
Telesat Telesat, formerly Telesat Canada, is a Canadian satellite communications company founded on May 2, 1969. The company is headquartered in Ottawa. History Telesat began as Telesat Canada, a Canadian Crown corporation created by an Act of Pa ...
of
Canada Canada is a country in North America. Its ten provinces and three territories extend from the Atlantic Ocean to the Pacific Ocean and northward into the Arctic Ocean, covering over , making it the world's second-largest country by to ...
, and
Syncom Syncom (for "synchronous communication satellite") started as a 1961 NASA program for active geosynchronous communication satellites, all of which were developed and manufactured by the Space and Communications division of Hughes Aircraft Comp ...
IV-2, or Leasat-2, a
Hughes Hughes may refer to: People * Hughes (surname) * Hughes (given name) Places Antarctica * Hughes Range (Antarctica), Ross Dependency * Mount Hughes, Oates Land * Hughes Basin, Oates Land * Hughes Bay, Graham Land * Hughes Bluff, Victoria La ...
-built satellite leased to the
U.S. Navy The United States Navy (USN) is the maritime service branch of the United States Armed Forces and one of the eight uniformed services of the United States. It is the largest and most powerful navy in the world, with the estimated tonnage o ...
; all three were Hughes-built satellites. Leasat-2 was the first large communications satellite designed specifically to be deployed from the Space Shuttle. All three satellites were deployed successfully and became operational. Another payload was the OAST-1
solar array A photovoltaic system, also PV system or solar power system, is an electric power system designed to supply usable solar power by means of photovoltaics. It consists of an arrangement of several components, including solar panels to absorb and ...
, a device wide and high, which folded into a package deep. The array carried a number of different types of experimental
solar cell A solar cell, or photovoltaic cell, is an electronic device that converts the energy of light directly into electricity by the photovoltaic effect, which is a physical and chemical phenomenon.
s and was extended to its full height several times during the mission. At the time, it was the largest structure ever extended from a crewed spacecraft, and it demonstrated the feasibility of large lightweight solar arrays for use on future orbital installations, such as the International Space Station (ISS). The McDonnell Douglas-sponsored Continuous Flow Electrophoresis System (CFES) experiment, using living cells, was more elaborate than the one flown on previous missions, and payload specialist Walker operated it for more than 100 hours during the flight. A student experiment to study
crystal A crystal or crystalline solid is a solid material whose constituents (such as atoms, molecules, or ions) are arranged in a highly ordered microscopic structure, forming a crystal lattice that extends in all directions. In addition, macro ...
growth in
microgravity The term micro-g environment (also μg, often referred to by the term microgravity) is more or less synonymous with the terms '' weightlessness'' and ''zero-g'', but emphasising that g-forces are never exactly zero—just very small (on the ...
was also carried out. The highlights of the mission were filmed using an
IMAX IMAX is a proprietary system of high-resolution cameras, film formats, film projectors, and theaters known for having very large screens with a tall aspect ratio (approximately either 1.43:1 or 1.90:1) and steep stadium seating. Graeme ...
motion picture camera, and later appeared in the 1985 documentary film '' The Dream is Alive''. On September 3, 1984, concern arose over the formation of ice on the waste dump nozzle of the shuttle. The cause was an obstruction in the shuttle's external wastewater dumping system that caused a " pee-sicle" to form during the mission; Hartsfield removed it with the Remote Manipulator System (
Canadarm Canadarm or Canadarm1 (officially Shuttle Remote Manipulator System or SRMS, also SSRMS) is a series of robotic arms that were used on the Space Shuttle orbiters to deploy, manoeuvre, and capture payloads. After the Space Shuttle ''Columbia ...
) the following day. The mission lasted 6 days, 0 hour, 56 minutes, and 4 seconds, with landing taking place on Runway 17 at
Edwards Air Force Base Edwards Air Force Base (AFB) is a United States Air Force installation in California. Most of the base sits in Kern County, but its eastern end is in San Bernardino County and a southern arm is in Los Angeles County. The hub of the base is ...
at 06:37:54 a.m. PDT on September 5, 1984. During STS-41-D, ''Discovery'' traveled a total of and made 97 orbits. The orbiter was transported back to KSC on September 10, 1984. Ominously, STS-41-D was the first Shuttle mission in which blow-by damage to the SRB O-rings was discovered, with a small amount of soot found beyond the primary O-ring. Following the ''Challenger'' disaster,
Morton Thiokol Thiokol (variously Thiokol Chemical Corporation(/Company), Morton Thiokol Inc., Cordant Technologies Inc., Thiokol Propulsion, AIC Group, ATK Thiokol, ATK Launch Systems Group; finally Orbital ATK before becoming part of Northrop Grumman) was an ...
engineer Brian Russell called this finding the first "big red flag" on SRB Joint and O-ring safety.


Launch attempts


Mission insignia

The 12 stars within the blue field indicate the flight's original numerical designation as STS-12 in the Space Transportation System's mission sequence. A representation of ''Discovery's'' namesake is manifested in a sailing ship, which is linked to the Shuttle (with the OAST solar array in the payload bay) via a red, white, and blue path, signifying its maiden voyage.


Wake-up calls

NASA began a tradition of playing music to astronauts during the
Project Gemini Project Gemini () was NASA's second human spaceflight program. Conducted between projects Mercury and Apollo, Gemini started in 1961 and concluded in 1966. The Gemini spacecraft carried a two-astronaut crew. Ten Gemini crews and 16 individual ...
, and first used music to wake up a flight crew during
Apollo 15 Apollo 15 (July 26August 7, 1971) was the ninth crewed mission in the United States' Apollo program and the fourth to land on the Moon. It was the first J mission, with a longer stay on the Moon and a greater focus on science than ear ...
. Each track is specially chosen, often by the astronauts' families, and usually has a special meaning to an individual member of the crew, or is applicable to their daily activities.


Gallery

Image:STS41D-36-034.jpg, SBS-D deployment Image:STS41D-36-111.jpg, Syncom IV-2 deployment Image:STS41D-37-050.jpg, Telstar 3C deployment Image:STS41D-01-021.jpg, The extended OAST-1 solar array


See also

*
List of human spaceflights This is a list of all human spaceflights throughout history. Beginning in 1961 with the flight of Yuri Gagarin aboard Vostok 1, human spaceflight occurs when a human crew flies a spacecraft into outer space. Human spaceflight is distinguish ...
* List of Space Shuttle missions


References


External links


STS-41-D mission summary
NASA
STS-41-D National Space Transportation Systems Program Mission Report
NASA

NSS
''The Dream is Alive'' (1985)
IMDb * https://www.nasa.gov/mission_pages/shuttle/shuttlemissions/archives/sts-41B.html {{Orbital launches in 1984 1984 in spaceflight 1984 in the United States Space Shuttle missions Edwards Air Force Base 1984 in science Spacecraft launched in 1984 Spacecraft which reentered in 1984 August 1984 events September 1984 events