Russky Bridge
   HOME

TheInfoList



OR:

The Russky Bridge (russian: Русский мост, ''Russian Bridge'') is a
cable-stayed bridge A cable-stayed bridge has one or more ''towers'' (or ''pylons''), from which cables support the bridge deck. A distinctive feature are the cables or stays, which run directly from the tower to the deck, normally forming a fan-like pattern ...
in
Vladivostok Vladivostok ( rus, Владивосто́к, a=Владивосток.ogg, p=vɫədʲɪvɐˈstok) is the largest city and the administrative center of Primorsky Krai, Russia. The city is located around the Golden Horn Bay on the Sea of Japan, ...
,
Primorsky Krai Primorsky Krai (russian: Приморский край, r=Primorsky kray, p=prʲɪˈmorskʲɪj kraj), informally known as Primorye (, ), is a federal subject (a krai) of Russia, located in the Far East region of the country and is a part of t ...
,
Russia Russia (, , ), or the Russian Federation, is a transcontinental country spanning Eastern Europe and Northern Asia. It is the largest country in the world, with its internationally recognised territory covering , and encompassing one-ei ...
. The bridge connects the Russky Island and the Muravyov-Amursky Peninsula sections of the city across the
Eastern Bosphorus The Eastern Bosphorus (Russian: Босфор Восточный, ''Bosfor Vostochny'') is a strait located in Primorsky Krai, Russia, that separates the Muravyov-Amursky Peninsula and Russky Island, and connects Amur Bay and Ussuri Bay within ...
strait, and with a central span of it is the longest cable-stayed bridge in the world. The Russky Bridge was originally built to serve the 2012 Asia-Pacific Economic Cooperation conference hosted at the Far Eastern Federal University campus on Russky Island. It was completed in July 2012 and opened by Prime Minister
Dmitry Medvedev Dmitry Anatolyevich Medvedev ( rus, links=no, Дмитрий Анатольевич Медведев, p=ˈdmʲitrʲɪj ɐnɐˈtolʲjɪvʲɪtɕ mʲɪdˈvʲedʲɪf; born 14 September 1965) is a Russian politician who has been serving as the dep ...
, and on September 3, 2012, the bridge was officially given its name.


Overview

The bridge to Russky Island is the world's longest cable-stayed bridge, with a long central span. The bridge also has the second highest
pylons Pylon may refer to: Structures and boundaries * Pylon (architecture), the gateway to the inner part of an Ancient Egyptian temple or Christian cathedral * Pylon, a support tower structure for suspension bridges or highways * Pylon, an orange mar ...
after the Millau Viaduct and the longest cable stays. The design of the bridge crossing has been determined on the basis of two primary factors: *Shortest coast-to-coast distance in the bridge crossing location . Navigable channel depth is up to . *The locality of the bridge crossing construction site is characterized by severe climate conditions: temperatures vary from –31 to +37 °C (–24 to +99 °F); storms bring winds of up to and waves of up to in height; and ice formations in winter can be up to thick.


Pylons construction

The
piles Hemorrhoids (or haemorrhoids), also known as piles, are vascular structures in the anal canal. In their normal state, they are cushions that help with stool control. They become a disease when swollen or inflamed; the unqualified term ''he ...
were driven as deep as below ground and on the island side 120
auger Auger may refer to: Engineering * Wood auger, a drill for making holes in wood (or in the ground) ** Auger bit, a drill bit * Auger conveyor, a device for moving material by means of a rotating helical flighting * Auger (platform), the world's f ...
piles were piled under each of the two high bridge towers. The pylons were concreted using custom self-climbing forms in pours of . A crane was used on the first three pours, afterwards the formwork was completed unaided moving through the
hydraulic motion Hydraulics (from Greek: Υδραυλική) is a technology and applied science using engineering, chemistry, and other sciences involving the mechanical properties and use of liquids. At a very basic level, hydraulics is the liquid counter ...
of modular elements. The pylons are A-shaped, therefore, the use of standard forms was not feasible. An individual set of forms was arranged for each bridge tower. Transition between section types was carried out at summer levels at the elevations of and . The use of self-climbing forms made it possible to achieve better quality and decrease the time of construction of cast-in-situ reinforced concrete structures by half as much again. The cable stays anchorage zone starts at . The installation of cable stay pairs and casting of bridge tower bodies was carried out simultaneously, dramatically reducing the construction period.


Central span structure

The span structure has an
aerodynamic Aerodynamics, from grc, ἀήρ ''aero'' (air) + grc, δυναμική (dynamics), is the study of the motion of air, particularly when affected by a solid object, such as an airplane wing. It involves topics covered in the field of fluid dyn ...
cross-section Cross section may refer to: * Cross section (geometry) ** Cross-sectional views in architecture & engineering 3D *Cross section (geology) * Cross section (electronics) * Radar cross section, measure of detectability * Cross section (physics) **Abs ...
to assume squally wind loads. The shape of the span cross-section has been determined based on aerodynamic design and optimized according to the results of experimental processing of the scale model in the detailed design phase. Welded field connections are used for longitudinal and transversal joints of the cap sheet of the orthotropic deck and lower ribbed plate. For joints of vertical walls of the blocks, longitudinal ribs, transversal beams and diaphragms, field connections are used provided by means of high-strength bolts. Large-sized prefabricated sections for the installation of the central span were delivered by barges to the erection site and hoisted by a crane to a height. Here, the elements were abutted and cable stays attached to them.


Cable-stayed system

A cable-stayed system assumes all static and
dynamic load An active load or dynamic load is a component or a circuit that functions as a current-stable nonlinear resistor. Circuit design In circuit design, an active load is a circuit component made up of ''active devices'', such as transistors, intended ...
s on which the very existence of the bridge depends. Cable stays are not designed to endure the entire lifetime of the bridge, but they are repairable and have the best possible protection from natural disasters and other adverse impacts.
Parallel strand stay Parallel is a geometric term of location which may refer to: Computing * Parallel algorithm * Parallel computing * Parallel metaheuristic * Parallel (software), a UNIX utility for running programs in parallel * Parallel Sysplex, a cluster of IBM ...
(PSS) cable stays consist of parallel strands of diameter; every strand consists of seven galvanized wires. Cable stays incorporate from 13 to 79 strands. The length of the shortest cable stay is ; the longest, . The protective housings of the cable stays are made from high density polyethylene (HDPE) and have the following features: UV resistance; resistance to local climate conditions of Vladivostok (temperature range from –40 to +40 °C; –40 to +104 °F) and environmental aggressiveness.


Bridge specification

*Bridge footprint: 60+72+3x84+1104+3x84+72+60 m *Total bridge length: *Total length incl. trestles: *Central channel span length: *Bridge width: *Bridge roadway breadth: *Number of driving lanes: 4 (two in each direction) *Under clearance: *Number of bridge towers: 2 *Pylons’ height: *Number of cable stays: 168 *Longest cable stay: *Shortest cable stay:


Criticism

The costs and the fact of the construction of the Russky Bridge are widely criticized by the Russian political opposition.Путин. Итоги. 10 лет: независимый экспертный доклад
/ref> In January 2007,
Vladimir Putin Vladimir Vladimirovich Putin; (born 7 October 1952) is a Russian politician and former intelligence officer who holds the office of president of Russia. Putin has served continuously as president or prime minister since 1999: as prime min ...
, then-
President of Russia The president of the Russian Federation ( rus, Президент Российской Федерации, Prezident Rossiyskoy Federatsii) is the head of state of the Russian Federation. The president leads the executive branch of the federa ...
, stated that holding a summit in Vladivostok is a distinct possibility, and that at least 100 billion rubles would be required to prepare the city for the summit, which, at the time, was three times more than the provincial budget of Primorsky Krai as a whole. , the cost of construction was expected to surpass $1 billion USD, and the project description on the site of the general contractor did not list project costs. Additionally, the built-in capacity of 50,000 cars per day is ten-times the existing population of Russky Island at only 5,000 inhabitants, leading to severe under-usage. There had previously been criticism that the paved road had ended in a dead end, a short distance beyond the bridge, during the first year after it was built. The paved road network has since then been expanded. As of 2018, the road covers the entire Sapper peninsula, about 25% of the total
area Area is the quantity that expresses the extent of a region on the plane or on a curved surface. The area of a plane region or ''plane area'' refers to the area of a shape or planar lamina, while '' surface area'' refers to the area of an op ...
of the island.


References


External links


Construction of the bridge to Russky Island: news and photos from start until today


{{Supertall Buildings and structures in Vladivostok Transport in Vladivostok Cable-stayed bridges in Russia Cross-sea bridges in Asia Road bridges in Russia Bridges completed in 2012 2012 establishments in Russia Pacific Coast of Russia