River Street Tower (also known as the Downing Tower after its developer) is a high-rise residential tower in
Manchester Manchester () is a city in Greater Manchester, England. It had a population of 552,000 in 2021. It is bordered by the Cheshire Plain to the south, the Pennines to the north and east, and the neighbouring city of Salford to the west. The ...
, England. The tower is situated immediately north of the Mancunian Way on land which was formerly occupied by a concrete car park frame from 2005 to 2018. A tower was originally approved in October 2012. However, the scheme never materialised and the land was sold to new owners. A revised scheme for the site was approved in 2017 for a 32 storey, high-rise tower, comprising 420 apartments targeted at the student accommodation market. The unfinished concrete frame was demolished in May 2018 and construction commenced on the tower in summer 2018. As of 2023, River Street Tower is the joint 19th-tallest building in Greater Manchester with
1 Spinningfields No.1 Spinningfields (formerly 1 Hardman Square) is a 92-metre office tower in the Spinningfields district of Manchester city centre, Manchester in the United Kingdom. The development was previously known as 1 Hardman Square which was a 140-m ...
.


Background


2012 scheme

The development was located on a site on River Street, beside Manchester city centre's southern boundary next to the Mancunian Way. At the time of the planning submission in 2012, the site was occupied by a half-built concrete frame, originally built for a medium-rise apartment block in 2004. The developer went bankrupt and the concrete frame remained uncompleted for 13 years. Chelmer Developments bought the site in April 2011 and pursued development opportunities. Liaising with
Manchester City Council Manchester City Council is the local authority for Manchester, a city and metropolitan borough in Greater Manchester, England. Manchester is the sixth largest city in England by population. Its city council is composed of 96 councillors, three f ...
, the company commissioned
SimpsonHaugh and Partners SimpsonHaugh (formerly Ian Simpson Architects) is an English architecture practice established in 1987 by Ian Simpson and Rachel Haugh. The practice has offices in London and Manchester. In 2014, the practice re-branded as Simpson Haugh & Pa ...
to devise design proposals for a skyscraper building above in height. The company held a four-week consultation period in spring 2012. The 2012 approved scheme included 600 serviced apartments designed for short-stay 'serviced living' as well as a café and gym. The tower would have been similar to modernist buildings like the New Century House and will reflect light to create effect. The architect, Ian Simpson described the building as "a simple, very elegant and slender building with a glass surface so it will pick up reflections from the light and I think it will be quite dramatic". The planning application was submitted in July 2012 and Manchester City Council approved the plans in October 2012. Approval was confirmed on 25 October 2012 at the monthly planning committee meeting. Demolition of the existing concrete structure was expected to begin in earnest, though works did not commence. The land was subsequently sold to new owners,
Bolton Bolton (, locally ) is a large town in Greater Manchester in North West England, formerly a part of Lancashire. A former mill town, Bolton has been a production centre for textiles since Flemish weavers settled in the area in the 14th ...
-based development firm Forshaw Land & Property and a revised planning application was made and approved by Manchester City Council in 2015 for 420 privately rented apartments, fewer than the 600 originally planned in the 2012 scheme. Construction of the skyscraper was expected to take approximately 18 months with the demolition of the concrete car park shell to commence in November 2015. However, by May 2017 construction had yet to begin, and the car park structure had not been demolished. The scheme was effectively abandoned when new owners of the site proposed a different and smaller building in December 2017.


2017 scheme

A planning application was submitted in late 2017 for a tower reduced in scale and which was approved in January 2018. The concrete frame which has been incomplete since 2005 was finally demolished in May 2018. Groundworks commenced in summer 2018 with the core beginning to rise in October 2018. In September 2020, the building was completed and began taking bookings for students.


References


External links


- Developer's website for the scheme- Planning application document