Rapid transit in Waterloo Region
   HOME

TheInfoList



OR:

Ion, stylized as ION, is an integrated
public transport Public transport (also known as public transportation, public transit, mass transit, or simply transit) is a system of transport for passengers by group travel systems available for use by the general public unlike private transport, typi ...
ation network in the Regional Municipality of Waterloo in
Ontario Ontario ( ; ) is one of the thirteen provinces and territories of Canada.Ontario is located in the geographic eastern half of Canada, but it has historically and politically been considered to be part of Central Canada. Located in Central Ca ...
, Canada. It is operated by
Keolis Keolis is a multinational transportation company that operates public transport systems. The company manages bus, rapid transit, tram, coach networks, rental bikes, car parks, water taxi, cable car, trolleybus and funicular services. ...
and is part of the
Grand River Transit Grand River Transit (GRT) is the public transport operator for the Regional Municipality of Waterloo, Ontario, Canada. It operates daily bus services in the region, primarily in the cities of Kitchener, Waterloo, and Cambridge, alongside the ...
(GRT) system, partially replacing GRT's Route 200
iXpress Grand River Transit (GRT) is the public transport operator for the Regional Municipality of Waterloo, Ontario, Canada. It operates daily bus services in the region, primarily in the cities of Kitchener, Waterloo, and Cambridge, alongside the IO ...
bus service. The section of the bus route serving Cambridge has been renamed "Ion Bus", and renumbered as 302. The first phase commenced operations on June 21, 2019, between the north end of Waterloo and the south end of Kitchener. A future extension of light rail to the downtown
Galt Galt or GALT may refer to: Biology and biochemistry * Galactose-1-phosphate uridylyltransferase, an enzyme * Gut-associated lymphoid tissue, a subset of mucosa-associated lymphoid tissue People and fictional characters * Galt (surname), a list o ...
area of
Cambridge Cambridge ( ) is a university city and the county town in Cambridgeshire, England. It is located on the River Cam approximately north of London. As of the 2021 United Kingdom census, the population of Cambridge was 145,700. Cambridge bec ...
(Phase 2) is planned but construction may not begin on that line until 2028. In 2009, an
Environmental Assessment Environmental Impact assessment (EIA) is the assessment of the environmental impact, environmental consequences of a plan, policy, program, or actual projects prior to the decision to move forward with the proposed action. In this context, the te ...
(EA) began to create a proposal of electrically-powered light rail transit through Kitchener and Waterloo, and adapted
bus rapid transit Bus rapid transit (BRT), also called a busway or transitway, is a bus-based public transport system designed to have much more capacity, reliability and other quality features than a conventional bus system. Typically, a BRT system includes ...
from Kitchener to Cambridge. On June 24, 2009, Regional Council voted to approve the project, subject to funding from higher levels of government, which was in turn approved by council on June 15, 2011. This was followed by a community building strategy to guide development, identify key destinations, and strengthen regional connections. The strategy, led by Urban Strategies Inc. of Toronto, consulted hundreds of individuals and stakeholders from Cambridge, Kitchener, and Waterloo. Construction began in August 2014 and service was expected to begin in late 2017; however, because of delays in the manufacture and delivery of
rolling stock The term rolling stock in the rail transport industry refers to railway vehicles, including both powered and unpowered vehicles: for example, locomotives, freight and passenger cars (or coaches), and non-revenue cars. Passenger vehicles ca ...
, the introduction of the light rail service was significantly delayed. The total cost of the system was estimated at $818 million, but in December 2017, the overruns were estimated to total approximately $50 million. The Province was expected to provide $25 million of that amount.


Etymology

According to the Region of Waterloo, the Ion network is named after
the atom The Atom is a name shared by five superheroes appearing in American comic books published by DC Comics. The original Golden Age Atom, Al Pratt, was created by writer Bill O'Connor and artist Ben Flinton and first appeared in All-American Pub ...
, which it describes as being “always in motion”.


History

In 2004, the Regional Municipality began an Individual Environmental Assessment to study the feasibility of constructing a
rapid transit Rapid transit or mass rapid transit (MRT), also known as heavy rail or metro, is a type of high-capacity public transport generally found in urban areas. A rapid transit system that primarily or traditionally runs below the surface may be ...
line to provide higher-order public transit service to the Region and to encourage more compact urban growth along the corridor. The EA took a broader approach to studying possible routes and stations for the rapid transit line, examining several options such as utilizing existing tracks/roads and constructing new facilities. In keeping with legislation, the Environmental Assessment also examined ten possible transport technologies, including
monorails A monorail (from " mono", meaning "one", and "rail") is a railway in which the track consists of a single rail or a beam. Colloquially, the term "monorail" is often used to describe any form of elevated rail or people mover. More accurately ...
and subways. The EA as planned consisted of three phases: Phase 1: Determine a preferred transportation strategy from options such as road expansion, improved conventional transit, and rapid transit. Phase 1 was completed in July 2006. Phase 2: : Step 1: Determine a preferred route design (grade separated, dedicated on-road, dedicated off-road, etc.) and technology. The EA examined ten different technologies including light rail, bus rapid transit, monorail, and subway. Step 1, completed in February 2007, determined that light rail transit and bus rapid transit were best suited to meet the needs of the Regional Growth Management Strategy. : Step 2: Determined a short list of preferred routes and technologies for seven segments of a rapid transit system (completed in 2008). : Step 3: Proposed an overall preferred rapid transit system (completed June 2009) Phase 3: Design an implementation plan for the rapid transit system. In June 2008, the Province of Ontario announced a new expedited Transit Project Assessment Process (Ontario Regulation 231/08). In August 2008, the Region notified the Ministry of the Environment (MOE) to advise that it would transition from the Individual Environmental Assessment to the expedited process. For that reason, Phase 3 of the Individual EA would not be completed. On June 24, 2009, Regional Council approved the initiative and continued discussions with Provincial and Federal governments to obtain funding for the $790-million project. Light Rail Transit (LRT) was short-listed as the technology for the new rapid transit system. The Region decided on a staged approach, building light rail from Conestoga Mall to
Fairview Park Mall CF Fairview Park (commonly known as Fairview Park Mall) is a large shopping mall of 120 stores in Kitchener, Ontario, Canada, owned and managed by Cadillac Fairview.
, passing through Uptown Waterloo and Downtown Kitchener on the way. Adapted Bus Rapid Transit (aBRT) would be built from Fairview Park Mall to Ainslie Street terminal in Cambridge utilizing shoulder bypass lanes along Highways 8 and 401 during heavy traffic where speeds are often 40 km/h or less. As of June 2019, there is still no specific timeline for replacing the aBRT service to Cambridge with light rail.


Approved light rail system

On June 24, 2009, Regional Council approved LRT as the technology for rapid transit in Waterloo Region. Regional Council also approved a recommendation to implement the system in stages because ridership, development potential and capital and operating costs vary along the route. The light rail system was approved by Regional Council with a vote of 15–1. Cambridge mayor Doug Craig cast the dissenting vote. Other Cambridge-area representatives joined Craig in voting against subsequent motions on the service's staging, feeling that running only buses to that city does them a disservice. The Province of Ontario had promised to fund up to two thirds of the cost of the construction of a light rail or bus rapid transit system in Waterloo Region. However, in the summer of 2010, actual funding commitments from higher levels of government for the combined LRT and aBRT system were announced: $300 million from the province of Ontario, and $265 million (or up to 1/3 of the full cost) from the federal government. The provincial figure was disappointing to supporters, as the provincial government had previously promised to pay 2/3 of the cost. Regional council debated funding the remaining $200–300 million required for the project to go ahead as planned. During public consultation for the project, concerns related to the light rail proposal focused on its relative service infrequency when compared with rapid transit systems in other cities (though it would still outperform the Region’s best bus services in its overall service capacity, and the frequency of many routes); the projected service frequency will be approximately 7.5 minutes. In addition, a light rail line would be limited by the narrow main streets of key downtown areas. A feasible proposal raised by the Region for dealing with this challenge would be to have light rail vehicles (LRVs) share space with traffic within core areas, somewhat resembling the traditional streetcar networks of many European cities, and of nearby Toronto. A bus rapid transit line would also face the challenge of the cramped core areas, and thus would also likely share space with traffic in core areas. In late 2011, planning was well underway and preparations were being made. In October, a property on Dutton Drive in Waterloo, bordering the rail-line corridor where the LRT is planned to be installed, was purchased to serve as a maintenance and storage yard for the system's LRVs. The site, which was purchased for $6 million, will contain three buildings: the largest is and will house the operations centre and a repair shop; one will include a washing system; and the third is a wayside maintenance building that will house the repair truck fleet.


Vehicles

On July 10, 2013, it was reported that a deal was finalized with
Metrolinx Metrolinx is a Crown agency of the Government of Ontario that manages and integrates road and public transport in the Greater Toronto and Hamilton Area (GTHA), which comprises much of Ontario's Golden Horseshoe region. Headquartered at Union ...
to join its contract with
Bombardier Transportation Bombardier Transportation was a Canadian-German rolling stock and rail transport manufacturer, headquartered in Berlin, Germany. It was one of the world's largest companies in the rail vehicle and equipment manufacturing and servicing industry ...
for the purchase of 14
Flexity Freedom The Alstom Flexity Freedom is a low-floor, articulated light rail vehicle developed by Bombardier Transportation (and later Alstom) for the North American market. It is marketed as part of the Bombardier Flexity family which includes other mod ...
LRVs to form the system's initial fleet, with an option to purchase up to 14 more as the need arises. A further report on July 12, 2013, stated that the region would be purchasing 14 LRVs, with an option to buy 16 more. The 14 vehicles are estimated to cost $92.4 million, an average of $6.6 million per vehicle. The cost breakdown is: * vehicles – $61.1 million * spare parts – $6.5 million * tools and equipment, taxes, currency exchange – $7 million * contingencies – $11 million in contingencies. Each 30-metre-long, 30-tonne vehicle has 56 seats and a standing capacity of 144 passengers. The body is constructed of five sections, in an accordion-like configuration to allow for sharp turns. It can be driven from either end. The top speed is 88 km/h but the average travel speed is unlikely to exceed 50 km/h. The vehicles are numbered with a three-digit unit number in the 5xx series beginning with 501. This fleet number is displayed prominently on the end modules of each vehicle followed by a single letter to denote which end module the fleet number is on (e.g. 503A, 507B). The vehicles are being used for testing at the maintenance facility and all 19 km of the completed track.


Vehicle delivery and testing

Production of the new vehicles was expected to begin in 2015 with the first to be delivered no later than August 2016 and all vehicles were to be received by the end of 2016. On April 13, 2016, it was reported that Bombardier had informed the transit authority that delivery of the vehicles would be delayed. The region entered a joint agreement with Metrolinx and Bombardier in July 2013 for 14 LRVs, as well as an option to buy up to 14 more. Under the original agreement, the first vehicle was to be delivered no later than August 2016, and the final vehicle by December 2016. On May 20, 2016, Bombardier announced that to avoid further delays it would shift construction of the vehicles for the Ion system from its Thunder Bay plant to another plant in
Kingston, Ontario Kingston is a city in Ontario, Canada. It is located on the north-eastern end of Lake Ontario, at the beginning of the St. Lawrence River and at the mouth of the Cataraqui River (south end of the Rideau Canal). The city is midway between Tor ...
. The first vehicle, number 501 (its ends are labelled 501A and 501B), arrived in Waterloo Region on February 24, 2017. However, it was not ready for testing as its operating software was incomplete. By mid-March 2017, the second to fifth vehicles were seen by a CTV reporter as under construction in the Kingston plant. Testing of vehicle 501 was scheduled to commence in May 2017 on the line between Northfield Drive and Silver Lake. In early April 2017, the Region expected to receive a second LRV in June or July, but that was postponed to late August or early September. By the beginning of October 2017, the second LRV had arrived. The schedule then called for delivery of another each 15 days, for a total of 14 by year end. The year end target was missed. On November 7, 2017, unpowered vehicle testing began on the tracks between Northfield Drive and Erb Street. An LRV was towed to check track clearances including along station platforms and to ensure continuous
pantograph A pantograph (, from their original use for copying writing) is a mechanical linkage connected in a manner based on parallelograms so that the movement of one pen, in tracing an image, produces identical movements in a second pen. If a line dr ...
contact with the overhead electrical wiring. On December 19, 2017, GrandLinq had its first successful test of a Flexity Freedom running under its own power at the Ion maintenance facility. The two-hour test was done at the speed of and "apparently went quite well", according to Coun. Tom Galloway. In 2018, testing beyond the maintenance facility was scheduled to start. By this date, Waterloo Region had three LRVs on site, which is the minimum number required to do an adequate test of the system. A CBC report on December 21, 2017, indicated that the fourth vehicle was expected to be delivered before year-end. Six others were in final production and four were still in the assembly process. After the fourth vehicle was received in January, the first one was returned to Kingston for some additional work. At that time, five others were being tested by Bombardier. According to the schedule, the fourteenth and last LRV was expected to be delivered in February 2018 with full LRT service expected to start in spring 2018; however, this later became a June final delivery, with service start in December, then later to June 21, 2019. The final LRVs were delivered on December 6, 2018. At a Regional council meeting on May 8, 2019, it was announced that the service would launch the following month, on June 21, 2019; service across all of Grand River Transit, both LRT and bus, was to be free of charge for 11 days, until Canada Day. In August 2020, it was confirmed that part of a compensation package from Bombardier to settle shipping delays would be a fifteenth unit, provided free of charge, for the Ion fleet. It was delivered early March 2021.


Facilities

The Ion fleet is stored and maintained at the Ion Operations, Maintenance and Storage Facility (OMSF) located on Dutton Drive in Waterloo. The design of each of the stops was focused on an 'anchor wall', a square panel subdivided into smaller tiles of glass, ceramic or stone; each station has a unique wall design based on the surrounding architecture, landmarks and social character.


Operations

Ion light rail vehicles are in service between 5am and midnight daily with a frequency of every 10 minutes from 6am to 10pm on weekdays and 15 minutes at other times. The route is properly known as 301 ION Light Rail. The maximum operating speed of Ion light rail vehicles is along city streets and along railway rights of way. However, in areas where there is high pedestrian traffic, the operating speed will be as low as . The trip from Conestoga Mall to Fairview Park Mall is scheduled take about 46 minutes for an average speed of about . As a comparison, the average speed of Toronto's light rail
Line 5 Eglinton Line 5 Eglinton (also known as the Eglinton Crosstown or the Crosstown) is a light rail line that is under construction in Toronto, Ontario, Canada. Owned by Metrolinx and operated by the Toronto Transit Commission (TTC), the line will be part of ...
will be and the average speed of subway
Line 2 Bloor–Danforth Line 2 Bloor–Danforth is a subway line in the Toronto subway system, operated by the Toronto Transit Commission (TTC). It has 31 stations and is in length. It opened on February 26, 1966, and extensions at both ends were completed in 1968 an ...
is . Note that while Ion operates completely on the surface, Line 5 is half underground, and Line 2 is completely road-separated. At street intersections, Ion light rail vehicles do not use the traditional automotive green-yellow-red traffic signals for road traffic, but rather the traditional two-aspect transit signals that show a vertical white bar for "go" and a horizontal white bar for "stop". Ion light rail vehicles have
transit signal priority Bus priority or transit signal priority (TSP) is a name for various techniques to improve service and reduce delay for mass transit vehicles at intersections (or junctions) controlled by traffic signals. TSP techniques are most commonly associat ...
at intersections. Where a street crosses the Ion tracks located either along a railway right of way or along the side of a cross road, the crossing is protected by traditional railway crossing signals: drop gates, flashing red lights and a bell. Crossings so protected are (from north to south) at Northfield Drive, Bearinger Road, Columbia Street, University Avenue, Seagram Drive and Erb Street in Waterloo, and at Ottawa Street, Mill Street, Hayward Avenue, Block Line Road, Courtland Avenue and Wilson Avenue in Kitchener.


Freight trains

Canadian National Railway The Canadian National Railway Company (french: Compagnie des chemins de fer nationaux du Canada) is a Canadian Class I freight railway headquartered in Montreal, Quebec, which serves Canada and the Midwestern and Southern United States. CN i ...
freight trains use the shared portion of the Waterloo Spur between 11pm and 5am. After crossing King Street, the northbound freight train joins the northbound Ion track at Caroline Street, cross over to the southbound Ion track just north of Erb Street and then continue north on the southbound track until just south of Northfield Drive. This train typically heads north just after 11pm while Ion service is still running. Northbound Ion LRVs wait at Waterloo Public Square and southbound Ion LRVs wait at Northfield for the freight train to pass. The southbound return trip takes the reverse path and must return before Ion service starts at 5 am or they will have to wait until the next evening. This trip usually occurs Monday and Thursday nights but as with most freight schedules it can sometimes vary. Since freight cars are wider than the LRVs, there are
gauntlet track Gauntlet track or interlaced track (also gantlet track) is an arrangement in which railway tracks run parallel on a single track bed and are interlaced (i.e., overlapped) in such a way that only one pair of rails can be used at any time. Since th ...
s at the southbound track of Ion stations along the Waterloo Spur to keep freight trains from striking the station platforms. To further protect station platforms and also to protect the Ion
catenary In physics and geometry, a catenary (, ) is the curve that an idealized hanging chain or cable assumes under its own weight when supported only at its ends in a uniform gravitational field. The catenary curve has a U-like shape, superfici ...
system, there is a safety system to detect oversized freight cars and automatically stop the train using
derail A derail or derailer is a device used to prevent fouling (blocking or compromising) of a rail track (or collision with anything present on the track, such as a person, or a train) by unauthorized movements of trains or unattended rolling stock. ...
ers. The detectors are located at Willow Street and just north of Northfield Drive.


Route

The route approved by Regional Council travels in a mix of on-road and off-road (in various existing rights-of-way) configurations. On December 2, 2017, the ''Kitchener-Waterloo Record'' reported the local economy had already been stimulated through the construction of new buildings near the route, in both Kitchener–Waterloo and Cambridge.


Phase 1

* On-road from Conestoga stop in Waterloo, the route follows King Street then west on Northfield Drive, using its existing bridge to cross the
Conestoga Parkway The Conestoga Parkway, officially the Kitchener–Waterloo Expressway, is a controlled-access highway in the Canadian province of Ontario, located entirely within the Regional Municipality of Waterloo. The route travels east and then north thr ...
, to the Region-owned rail spur line at Northfield stop. * Off-road, it then follows the Region-owned rail spur line (also known as the Waterloo Spur) from Northfield Drive, passing the Research and Technology,
University of Waterloo The University of Waterloo (UWaterloo, UW, or Waterloo) is a public research university with a main campus in Waterloo, Ontario, Canada. The main campus is on of land adjacent to "Uptown" Waterloo and Waterloo Park. The university also operates ...
and Laurier - Waterloo Park stops to Uptown Waterloo, replacing the existing tracks. This line is used by the
Waterloo Central Railway The Waterloo Central Railway (WCR) is a non-profit heritage railway owned and operated by the Southern Ontario Locomotive Restoration Society (SOLRS). In May 2007, SOLRS received joint approval from the Region of Waterloo and the City of Waterloo ...
and CN, and remains open to freight traffic outside of transit service hours. * On-road in Uptown Waterloo, it splits into a one-way system going north on King Street (location of the Waterloo Public Square stop) and south on Caroline Street (Willis Way stop), and along Allen Street to rejoin as a two-way system along King Street past Allen and Grand River Hospital stops. In Downtown Kitchener, the route splits at the stop (home to the future Transit Hub) into a one-way system going north on Duke and Frederick Streets (including
Kitchener City Hall Kitchener City Hall is the seat of municipal government of Kitchener, Ontario, Canada. It has gone through many iterations through the 20th century, culminating in the current building, which opened in 1993. History The original location of ...
and Frederick stops) and south on Charles Street (Victoria Park and Queen), and back to a two-way system on Charles Street at Benton Street. From downtown Kitchener, the route follows Charles Street past Kitchener Market and Borden stops, then turns southwesternly taking a one-way system using Ottawa Street northbound and Borden Street southbound to Mill stop. * Off-road, it then travels two-way along the CN rail right-of-way (alongside existing tracks to allow full freight access), under the Conestoga Parkway in a dedicated tunnel, beside Hayward Avenue, beside Courtland Avenue (past Block Line stop) and through the hydro corridor adjacent to Fairway Road, to Fairway stop.


Phase 2

* Off-road From Fairview Park Mall the route then parallels the CPR rail line under Highway 8, over the Grand River, past Sportsworld station, under Highway 401, over the Speed River, to Eagle Street in Preston at Preston station. * On-road on Eagle Street to Hespeler/Eagle station, then along Hespeler Road past Cambridge Centre and Can-Amera stations to Delta station, and on Water Street into Downtown Cambridge to the Ainslie Terminal station. On-road sections keep the LRVs in dedicated lanes that do not mix with general traffic. In February 2017, after limitations in the original route design came to light, a new preliminary preferred route plan was published. This would no longer use the CPR line south of Fairway; instead, it would travel to the east of it, along the River Rd extension and across Hwy 8; along King St into the Sportsworld area and under Hwy 401; along Shantz Hill Rd into Preston, and crossing the Speed River on a dedicated bridge. The subsequent plan, rejected by Cambridge City Council in July 2017, indicated that the track would take Eagle St toward Hespeler, but to avoid conflicts with rail corridors and reduce traffic impacts at Eagle/Pinebush, would travel along the freight spur to Hespeler Rd. As previously, Hespeler Rd would be followed toward the Delta intersection, but to avoid traffic impacts it would veer east along the rail corridor behind Norfolk Ave, then transition to an abandoned railway corridor behind Grantham and Beverly Sts, before coming into downtown Galt near the Ainslie Terminal. (At least one journalist has pointed out the similarity between this plan and the electric Grand River Railway of the early 1900s.) More detailed rendering of the route became available in October 2019, indicating elevated sections would be used to cross Fairway Road, the Grand River, Fountain Street and the Speed River, and the CP Rail line by Eagle Street.


Staging

The Region approved a staged implementation plan for its rapid transit system: Stage 1 – Implementation of LRT north of Fairview Park Mall and adapted Bus Rapid Transit south of Fairview Park Mall, including: * LRT from Conestoga Mall in Waterloo to Fairview Park Mall in Kitchener; * Adapted Bus Rapid Transit (aBRT) from Fairview Park Mall in Kitchener to Ainslie Street Terminal in downtown Cambridge * Re-aligned Grand River Transit (GRT) bus service to provide an expanded level of service to the rapid transit stations along primary feeder corridors; * Express bus service, modelled after the current
iXpress Grand River Transit (GRT) is the public transport operator for the Regional Municipality of Waterloo, Ontario, Canada. It operates daily bus services in the region, primarily in the cities of Kitchener, Waterloo, and Cambridge, alongside the IO ...
service, to high ridership centres throughout the Region (i.e.,
Wilfrid Laurier University Wilfrid Laurier University (commonly referred to as WLU or simply Laurier) is a public university in Ontario, Canada, with campuses in Waterloo, Brantford and Milton. The newer Brantford and Milton campuses are not considered satellite campuses ...
,
Conestoga College Conestoga College Institute of Technology and Advanced Learning is a public college located in Kitchener, Ontario, Canada. Established in 1967, Conestoga serves approximately 23,000 registered students through campuses and training centres in ...
, etc.); * Connections to intercity transit such as
GO Transit GO Transit is a regional public transit system serving the Greater Golden Horseshoe region of Ontario, Canada. With its hub at Union Station in Toronto, GO Transit's green-and-white trains and buses serve a population of more than seven millio ...
,
Greyhound The English Greyhound, or simply the Greyhound, is a breed of dog, a sighthound which has been bred for coursing, greyhound racing and hunting. Since the rise in large-scale adoption of retired racing Greyhounds, the breed has seen a resurgenc ...
, and
Via Rail Via Rail Canada Inc. (), operating as Via Rail or Via, is a Canadian Crown corporation that is mandated to operate intercity passenger rail service in Canada. It receives an annual subsidy from Transport Canada to offset the cost of operating ...
. The stage 1 route is long. Stage 2 – Completion of a light rail transit system from Fairview Park in Kitchener to Ainslie Street in Cambridge. Commencement of Stage 2 to follow completion of Stage 1 as closely as possible.


Bids

Out of the seven groups that showed an interest in the project, by December 18, 2013, three consortiums had submitted bids to design, build, finance, operate and maintain the Ion system: * GrandLinq which includes Plenary Group Canada; Meridiam Infrastructure Waterloo;
Aecon Aecon Group Inc. is a construction company in Canada, providing services to private and public sector clients across its three core segments of Infrastructure, Industrial, and Concessions. Aecon produces construction materials including asphal ...
;
Kiewit {{Infobox settlement , official_name = Kiewit , other_name = , native_name = , nickname = , settlement_type = Village , motto = , image_skyline = Hasselt - Sint-La ...
; Mass Electric Construction Canada;
Keolis Keolis is a multinational transportation company that operates public transport systems. The company manages bus, rapid transit, tram, coach networks, rental bikes, car parks, water taxi, cable car, trolleybus and funicular services. ...
; STV Canada Construction; AECOM and
CIBC World Markets CIBC World Markets Inc. is the investment banking subsidiary of the Canadian Imperial Bank of Commerce. The firm operates as an investment bank both in the domestic and international equity and debt capital markets. The firm provides a variety ...
. *Kitchener Waterloo Cambridge Transit Partners which included Gracorp Capital Advisors; Connor, Clark & Lunn GVest Traditional; Infrastructure Partnership;
Parsons Parsons may refer to: Places In the United States: * Parsons, Kansas, a city * Parsons, Missouri, an unincorporated community * Parsons, Tennessee, a city * Parsons, West Virginia, a town * Camp Parsons, a Boy Scout camp in the state of Washingt ...
; Graham Infrastructure; IBI Group; E & E Seegmiller; Guild Electric; Alternate Concepts and
Investec Investec is an Anglo-South African international banking and wealth management group. It provides a range of financial products and services to a client base in Europe, Southern Africa, and Asia-Pacific. Investec is dual-listed on the London S ...
North America. *Tricity Transit System which included
SNC-Lavalin SNC-Lavalin Group Inc. is a Canadian company based in Montreal that provides engineering, procurement, and construction (EPC) services to various industries, including mining and metallurgy, oil and gas, environment and water, infrastructure, a ...
;
EllisDon EllisDon is an employee-owned construction services company that was founded and incorporated in 1951 in London, Ontario, Canada, by brothers Don and David Ellis Smith. The company is headquartered in Mississauga, Ontario, Canada. History ...
; Fengate Capital Management;
URS Urs (from ''‘Urs'') or ''Urus'' (literal meaning wedding), is the death anniversary of a Sufi saint, usually held at the saint's dargah (shrine or tomb). In most Sufi orders such as Naqshbandiyyah, Suhrawardiyya, Chishtiyya, Qadiriyya, etc ...
Canadian Operations; and
Hatch Mott MacDonald Hatch Mott MacDonald (HMM) was a consulting engineering firm serving public and private clients in North America. HMM's capabilities included planning, project development, studies and analysis, design, procurement, and construction engineering an ...
. The winning bid was selected at a committee meeting on March 4, 2014. GrandLinq is the preferred bidder. The final approval of the GrandLinq bid came at a full council meeting on March 19, and financial close was made May 9.


Construction

* Utility relocation and other associated work began in late 2013. Construction officially started with a groundbreaking event on August 21, 2014. * The first sections of the route scheduled for work were Borden Avenue in Kitchener, and Caroline Street in Waterloo. In early 2015, work shifted to Charles Street and King Street in Kitchener, and within the railway corridors. In March, under a stretch of King Street, GrandLinq reported finding wooden rail ties from the
streetcar line A tram (called a streetcar or trolley in North America) is a rail vehicle that travels on tramway tracks on public urban streets; some include segments on segregated right-of-way. The tramlines or networks operated as public transport are ...
, abandoned in the 1950s, unearthed during excavation. * By late 2015, many stretches of track were installed and some stations had their concrete pads poured. * By the end of 2016, system construction was 90% complete, including full completion of the maintenance facility and all underground utility work. * In late February 2017,
Bombardier Transportation Bombardier Transportation was a Canadian-German rolling stock and rail transport manufacturer, headquartered in Berlin, Germany. It was one of the world's largest companies in the rail vehicle and equipment manufacturing and servicing industry ...
had delivered a single sample-only LRV for testing. The Region reiterated that Stage 1 rail service would start in "early" 2018. * At that time, plans for Stage 2 were still in the very early stage. Public consultation was to start soon, but in mid 2017, that process was postponed to 2018. Some routes and stops had been agreed upon in 2011, but the final plan was scheduled for completion in mid 2017.


Shuttle Services

Because Stage 2 was still years away in March 2017, Grand River Transit was providing rapid transit between Fairview Park Mall and the Ainslie Street Transit Terminal (in the "downtown Galt" area) using iXpress buses. Adapted versions would become available in the near future for the Ion bus. Other stops are at Hespeler Road at the Delta, Can-Amera, Cambridge Centre, Pinebush, and Sportsworld. The rapid transit vehicles use bus-only lanes at Pinebush, Munch and Coronation to minimize slowdowns at times of heavy traffic. Following the launch of light rail stage 1, the Ion bus provides a direct link to that system. This bus route is properly known as 302 Ion Bus. That service, termed "adapted bus rapid transit" runs in shared traffic lanes for most of the route, and fares are collected on board. It therefore does not meet the BRT Standard definition of bus rapid transit. No firm estimates had been published as to the possible start of (Stage 2) light rail service to Cambridge but a report in early July 2017 suggested that construction would not begin until 2025.


Design

The stations have been built to be the length of two LRVs; however, as only single vehicles are anticipated to be required initially, the major station facilities were only built for a single vehicle length at start. This consists of a cantilevered glass canopy over a mostly open waiting area; enclosures were built at most stations to provide some shelter. Each station is also recognizable by a 'feature wall', a square installation near the end of the platform that carries a distinct colour scheme and pattern. The wall face is a series of large tiles in glass, ceramic or stone; at some stations, all tiles are the same, while others feature a unique pattern. Each wall features illuminated Ion and GRT logos, as well as the station's name set in Clearview. A second wall and canopy can be installed at the opposite end of each platform, and are planned to be erected when two light rail vehicle cars become the norm. There are ten public art installations within the Ion corridor with artworks at Conestoga, Research and Technology, Grand River Hospital, Kitchener Market,
Mill Mill may refer to: Science and technology * * Mill (grinding) * Milling (machining) * Millwork * Textile mill * Steel mill, a factory for the manufacture of steel * List of types of mill * Mill, the arithmetic unit of the Analytical Engine early ...
, Block Line and Fairway. A further piece, ''Fabric of Place'' by Lilly Otasevic consisting of a panel with imaging representing the fabric of the community, is used as a barrier along the Ion track in Waterloo behind the Albert McCormick Community Centre, on Parkside Drive. Waterloo Region budgeted $875,000 for the artworks. File:Laurier–Waterloo Park Station Oct 2017.jpg, Laurier–Waterloo Park Station, in October 2017, showing the canopy structure and stone-tile feature wall File:Waterloo ION gauntlet track.jpg, Gauntlet track at station where regular freight trains pass as well File:Fabric of Place.jpg, ''Fabric of Place''


Stations


Politics

The project has attracted vocal support and opposition.


Support

In May 2009, a Facebook group named "I Support Light Rail Transit in the Region of Waterloo" was created, and boasted over 1,600 members. Shortly after its creation, the group creator and other LRT supporters formed the "Tri-Cities Transport Action Group" (TriTAG). According to its website, TriTAG supports LRT as a needed method of shaping development, meeting future capacity needs, protecting the environment, and providing the most economical solution for transportation in the Region. Six months after founding, TriTAG launched an email campaign to allow supporters of LRT to email their MPs, MPPs, and other government officials such as the federal and provincial Ministers of Transportation. Within a few days, thousands of emails had been sent. For the 2010 Regional Budget, TriTAG and its supporters presented to the Regional Budget Committee regarding various areas of transportation funding. While the focus was not on LRT, the delegates spoke about the importance of proper transportation infrastructure (pedestrian, cycling, transit) on a successful LRT system. TriTAG has continued their support of the project into the bid stage in 2014; a notable contribution is a video outlining the landmarks and amenities that the route will access. Proponents have asserted that the region's plans for rapid transit will be an essential component of planning and rationally controlling the Region's growth. A report in late 2017 indicated that the new Ion system was responsible in part for a predicted building boom in the core of Kitchener, much of it located near LRT stations. An estimated $1.2 billion in building permits for 20 new developments was expected by March 2018, adding 1,000 apartments and 1,800 condominium units. According to the City, the anticipated development was a "mixture of high-density residential buildings with ground-floor retail, and office buildings with ground-floor retail". Half of the projects would be extensive in size. A report in the
Waterloo Region Record The ''Waterloo Region Record'' (formerly ''The Record'') is the daily newspaper covering Waterloo Region, Ontario, Canada, including the cities of Kitchener, Waterloo and Cambridge, as well as the surrounding area. Since December 1998, the ''Re ...
of December 29, 2017 indicated that "since Ion was approved in 2009, the region has issued $2.4 billion in building permits within the LRT corridor." Rod Regier, Commissioner of Planning, Development and Legislative Services for Waterloo Region, commented on the increase in building permits. "My back-of-the-envelope estimate is that the private sector developers have invested almost double the full cost of the Ion itself in the transit corridor. That for me is really astonishing," he said.


Opposition

A group opposed to the rapid transit proposal, called "Taxpayers for Sensible Transit" (T4ST), was formed in June 2009. According to its website, T4ST opposes LRT as being a proposal too big and too expensive for the region, which will hurt businesses and the local economy. Taxpayers for Sensible Transit did not present a position regarding transportation and transit funding for the 2010 Regional Budget. In September 2013 Doug Craig, the mayor of
Cambridge Cambridge ( ) is a university city and the county town in Cambridgeshire, England. It is located on the River Cam approximately north of London. As of the 2021 United Kingdom census, the population of Cambridge was 145,700. Cambridge bec ...
, called for examining the cost of cancelling the light rail line. He justified this examination due to doubts by Toronto politicians over its light rail line. On November 19, 2013, it was reported that Craig was working to "extricate" Cambridge from any obligation to pay for the line connecting it to Kitchener, while, at the same time, trying to argue for connecting Cambridge to Toronto, via a GO line. The first candidate to announce his run for Mayor of the City of Waterloo in the 2014 election, local media personality Dave MacDonald, was running on a primarily anti-LRT platform. In March 2014, just as the Region was preparing to give final approval to the construction contract, a group titled "Coalition Stop Waterloo LRT" filed a legal injunction against the project, claiming it did not meet planning guidelines and should be stopped. A court decision on March 18 dismissed the motion, but did not rule out further legal review. It later emerged that the only citizen directly associated with the filing coalition was local businessman Jay Aissa.
Ann Tucker Anne, alternatively spelled Ann, is a form of the Latin female given name Anna. This in turn is a representation of the Hebrew Hannah, which means 'favour' or 'grace'. Related names include Annie. Anne is sometimes used as a male name in the ...
of the
Ontario Superior Court The Superior Court of Justice (French: ''Cour supérieure de justice'') is a superior court in Ontario. The Court sits in 52 locations across the province, including 17 Family Court locations, and consists of over 300 federally appointed judges. ...
dismissed the suit on March 19, 2014. In July, Aissa announced that he was dropping further legal challenges, and instead would take a political option to oppose the project, running against incumbent Regional chairman Ken Seiling. Seiling was re-elected Chairman with 58.4% of the vote.Ken Seiling remains Waterloo Region chair, winning by comfortable margin
/ref> After publication of the February 2017 route plan, some citizens of Cambridge, particularly in the Preston area, were strongly objecting to the route, especially the section planned for Shantz hill and certain residential areas. City Council particularly objected to the Shantz Hill Road to Hespeler Road section and passed a motion in early July 2017 instructing staff to advise the Region of this and to request that alternatives be explored.


See also

* Urban rail transit in Canada *
Rail transport in Ontario Ontario ( ; ) is one of the thirteen provinces and territories of Canada.Ontario is located in the geographic eastern half of Canada, but it has historically and politically been considered to be part of Central Canada. Located in Central Ca ...
*
Public transport in Canada In the month of November 2015 ridership of Canadian large urban transit was 142.7 million passenger trips. The following is a list of public transit authorities in Canada Canada is a country in North America. Its ten provinces and thre ...


References


External links

* (Official YouTube channel) ** Published on April 2, 2020. ** Published on February 11, 2016. ** Published on June 1, 2016. ** Published on October 19, 2016. ** Published on Apr 4, 2017. Simplified overview of ION operations. ** Published on April 5, 2017. New signs for motorists near LRT tracks; white bar traffic lights for ION LRVs. ** Published on July 25, 2017. ** Published on November 27, 2018. * Published by the Region of Waterloo on November 1, 2017 – featuring Ion train 504 in motion on the Bombardier Kingston test track plus views of trains 503, 506, 508 and 509.
Official construction websiteRegion of Waterloo - Rapid Transit HomeRegion of Waterloo - Central Transit Corridor ProjectRegion of Waterloo - Map of Ion & iXpress routes
* Published on February 27, 2017 by a railfan. {{WaterlooRegion , state=collapsed Grand River Transit Light rail in Canada Electric railways in Canada Passenger railways in Ontario 750 V DC railway electrification Public–private partnership projects in Canada Railway lines opened in 2019 Passenger rail transport in Waterloo, Ontario Passenger rail transport in Kitchener, Ontario 2019 establishments in Ontario Standard gauge railways in Canada