Pingtung Line
   HOME

TheInfoList



OR:

The Pingtung Line () is part of the West Coast line of
Taiwan Railway Taiwan Railway (TR) is a state-owned conventional railway in Taiwan. It is operated by the Taiwan Railway Corporation under the supervision of the Ministry of Transportation and Communications (Republic of China), Ministry of Transportation and ...
. It is long, of which is
double track A double-track railway usually involves running one track in each direction, compared to a single-track railway where trains in both directions share the same track. Overview In the earliest days of railways in the United Kingdom, most li ...
. The section between Nanzhou and Linbian railway stations will be upgraded from a single-track railway to a
double-track railway A double-track railway usually involves running one track in each direction, compared to a single-track railway where trains in both directions share the same track. Overview In the earliest days of railways in the United Kingdom, most lin ...
in December 2019 while the section between Chaozhou and Nanzhou, and the section between Linbian and Fangliao is expected to remain in single-track. Taiwanese government stated in 2007 that it reserved the possibility to upgrade the entire section to dual-track railway when the number of travelers through Pingtung Line reaches a certain level


History

The line was completed in 1941. The section between
Kaohsiung Kaohsiung, officially Kaohsiung City, is a special municipality located in southern Taiwan. It ranges from the coastal urban center to the rural Yushan Range with an area of . Kaohsiung City has a population of approximately 2.73 million p ...
and Pingtung was electrified on July 10, 1996. The section between Pingtung and Chaozhou was electrified on August 23, 2015, when the elevated tracks between the two stations opened.


Chaozhou–Fangliao upgrades

Immediately following the completion of the elevated tracks between Pingtung and Chaozhou, the TRA began planning for the electrification of the last section of the line between Chaozhou and Fangliao. The plan was approved by the
Ministry of the Interior An interior ministry or ministry of the interior (also called ministry of home affairs or ministry of internal affairs) is a government department that is responsible for domestic policy, public security and law enforcement. In some states, the ...
on June 3, 2013, and construction began on November 16, 2014. Aside from electrifying the tracks, the following upgrades were carried out simultaneously: * Extending and raising platforms at all stations to cater to low-floor trains * Adding a second track between Nanzhou and Linbian * Adding a second platform at Zhen'an and Jiadong The infrastructure was completed in October 2019, and beginning on November 8, test runs using electric trains were carried out on the line. The electrified tracks officially entered service on December 23, 2019.


Stations


See also

* West Coast line (Taiwan)


References

{{Pingtung Line 1941 establishments in Taiwan Railway lines opened in 1941 TRA routes Rail transportation in Kaohsiung Southern Taiwan