New Zealand Ministry of Works
   HOME

TheInfoList



OR:

The
New Zealand New Zealand ( mi, Aotearoa ) is an island country in the southwestern Pacific Ocean. It consists of two main landmasses—the North Island () and the South Island ()—and over 700 smaller islands. It is the sixth-largest island coun ...
Ministry of Works and Development, formerly the Department of Public Works and often referred to as the Public Works Department or PWD, was founded in 1876 and disestablished and privatised in 1988. The Ministry had its own
Cabinet Cabinet or The Cabinet may refer to: Furniture * Cabinetry, a box-shaped piece of furniture with doors and/or drawers * Display cabinet, a piece of furniture with one or more transparent glass sheets or transparent polycarbonate sheets * Filin ...
-level responsible minister, the Minister of Works or Minister of Public Works. Historically, the state has played an important part in developing the New Zealand economy. For many years the Public Works Department (which became the Ministry of Works in 1948 and the Ministry of Works and Development in 1974) undertook most major construction work in New Zealand, including roads, railways and power stations. After the reform of the state sector, beginning in 1984, the ministry disappeared and its remnants now have to compete for government work. The Ministry of Works and Development was disestablished in 1988 and a Residual Management Unit continued to oversee the Ministry's operations and assets until formally ending in 1993. It was abolished via the Ministry of Works and Development Abolition Act 1988.


Structure and operations

The Head Office of the Ministry was in the Vogel Building in Wellington, named after former Premier Sir
Julius Vogel Sir Julius Vogel (24 February 1835 – 12 March 1899) was the eighth premier of New Zealand. His administration is best remembered for the issuing of bonds to fund railway construction and other public works. He was the first Jewish prime mi ...
, who helped create the Public Works Department during his term in office, through the Immigration and Public Works Act 1870. This building held the ''Vogel Computer'', one of the largest in New Zealand and used by several government departments for engineering work. The Ministry moved to the Vogel Building in about 1966 from the Old Government Building on Lambton Quay. During the
Great Depression The Great Depression (19291939) was an economic shock that impacted most countries across the world. It was a period of economic depression that became evident after a major fall in stock prices in the United States. The economic contagio ...
the department was relied on by the government to provide unemployment relief, constructing infrastructure mostly using human labour at reduced salaries. The First Labour Government resumed the department's original function as the development arm of the state although from May 1936 (when a new three year public works programme was announced) whence relief work for the unemployed not only continued but all relief workers were placed on the standard £4 a week rate of pay. The ministry was renamed the Ministry of Works on 16 March 1943 under the Ministry of Works Act. This was to reflect the extended wartime functions, when the Minister explained it was, "to ensure that, whilst the building and constructional potential of the country is limited by war and immediate post-war conditions, it is assembled and utilized in the most efficient manner from the point of view of the national interest". In 1944 the ministry was involved in the "great furniture scandal" when asked to order items of furniture for the new Legation in Moscow, to be headed by Charles Boswell. The list of items to be shipped from New Zealand to Moscow (via Tehran and Central Asia) included 40 armchairs, 10 couches, a billiard table, and palm stands. Apparently made after looking at furniture in Government House and ministerial houses, the order could have seated almost the entire House of Representatives; it was cancelled by Prime Minister Peter Fraser. During the latter years of the Ministry there were seven District Offices (Auckland, Hamilton, Wanganui, Napier, Wellington, Christchurch and Dunedin) each headed by a District Commissioner of Works. In each District there were a number of Residency Offices (headed by a Resident Engineer) and each had a number of Depots. The primary purpose of this 6000 strong workforce was the maintenance of the existing and planning and construction of replacement sections of the State Highway network. In addition there were Project Offices set up for a particular purpose, such as to build a power project, airport, tunnel or irrigation scheme.


Dissolution

While the policy functions were either disestablished or passed on to other Government departments, the commercial operations were set up as Works and Development Services Corporation (a state-owned enterprise) and the computing bureau and the buildings maintenance units were sold. The corporation had two main subsidiaries, Works Consultancy Services and Works Civil Construction. These were sold in 1996 and became Opus International Consultants and
Works Infrastructure Downer EDI Works Limited (previously Public Works department, Ministry of Works and Works Infrastructure Limited and often simply Works) is a New Zealand based engineering and construction company owned by the Downer Group. History It was acquire ...
respectively, and the corporation was disestablished.


Major projects


Military equipment

*
Bob Semple tank The Bob Semple tank (sometimes referred to as Big Bob) was a light tank designed by New Zealand Minister of Works Bob Semple during World War II. Originating out of the need to build military hardware from available materials, the tank was built ...
(1941)


Military installations

* Ohakea and
Whenuapai Whenuapai is a suburb and aerodrome located in northwestern Auckland, in the North Island of New Zealand. It is located on the northwestern shore of the Waitematā Harbour, 15 kilometres to the northwest of Auckland's city centre. It is one of t ...
aircraft hangars (1939) *
Stony Batter Stony Batter is a historic defence installation at the north-eastern end of Waiheke Island, Auckland, New Zealand. It is sited within a 50-acre (200,000 m2) scenic reserve of the same name, owned by the New Zealand Department of Conservation (DOC ...
(1944) *
Wrights Hill Fortress Wrights Hill Fortress is a counter bombardment coastal artillery battery in the Karori suburb of Wellington, New Zealand. It was built between 1942 and 1944 and is predominantly underground, with numerous tunnels linking the war shelters, gun em ...
(1943)


Electricity


Projects

* Waitaki Dam (Completed 1935) * Roxburgh Dam * Tekapo A (Completed 1951) * Benmore Power Station (1965) *
Aviemore Dam The Aviemore Dam is a dam on the Waitaki River in New Zealand. The dam is a composite dam, with an embankment section, and a concrete section. Built in the 1960s (and completed in 1968) it impounds Lake Aviemore. Aviemore Dam is owned and opera ...
(1968) * Tekapo B *
Ohau A Ohau A is a power station operated by Meridian Energy in the South Island of New Zealand. It is located on the artificial Ohau canal. The dam is fed by water from Lake Ohau and Lake Pukaki and spills into the artificial Lake Ruataniwha.Meridian ...
, B and C. *
Lake Ruataniwha Lake Ruataniwha is an artificial lake in the Mackenzie Basin in the South Island of New Zealand. It was formed in 1977–1981 as part of the Waitaki hydroelectric project. It lies on the traditional boundary of the Canterbury and Otago provinces, ...
*
Clyde Dam The Clyde Dam, New Zealand's third-largest hydroelectric dam, is built on the Clutha River / Mata-Au near the town of Clyde, New Zealand, Clyde. It is owned and operated by Contact Energy. History There was considerable controversy when the dam w ...
(Completed 1989) * Te Anau and Manapouri Lake Control Structures (1971-1974) In the North Island, the Tongariro Power Scheme was completed between 1964 and 1983.


Railways


History

Under the Public Works Act 1876, the Department of Public Works was responsible for the operation of New Zealand's railway network from 1876 until 1880, when operations were transferred to the
New Zealand Railways Department The New Zealand Railways Department, NZR or NZGR (New Zealand Government Railways) and often known as the "Railways", was a government department charged with owning and maintaining New Zealand's railway infrastructure and operating the railway ...
. This transfer did not end the PWD's railway operations, as it still operated railway lines when under construction, sometimes providing revenue services prior to the official transfer of the line to the Railways Department. The PWD owned its own locomotives and rolling stock, some second-hand from the Railways Department, and it operated some small railway lines that were never transferred to the Railways Department. One example is a 6.4 km
branch line A branch line is a phrase used in railway terminology to denote a secondary railway line which branches off a more important through route, usually a main line. A very short branch line may be called a spur line. Industrial spur An industr ...
built in 1928 from near the terminus of the Railways Department's Kurow Branch to a hydro-electric dam project on the
Waitaki River The Waitaki River is a large braided river that drains the Mackenzie Basin and runs some south-east to enter the Pacific Ocean between Timaru and Oamaru on the east coast of the South Island of New Zealand. It starts at the confluence of the ...
. This branch was not solely used to service the dam project; the PWD used its own rolling stock to provide a service for school children who attended school in
Kurow Kurow is a small town in the Waitaki District, New Zealand. It is located on the south bank of the Waitaki River, northwest of Oamaru. Description The name is an Anglicised form of the Māori name of the nearby mountain, Te Kohurau. In the ...
, and occasionally special Railways Department trains operated on the line with PWD motive power, including a 1931 sightseeing excursion to view the under-construction dam. This line was removed in April 1937 as the PWD no longer required it.


Projects

*
North Island Main Trunk The North Island Main Trunk (NIMT) is the main railway line in the North Island of New Zealand, connecting the capital city Wellington with the country's largest city, Auckland. The line is long, built to the New Zealand rail gauge of and se ...
railway (completed 1908) **
Raurimu Spiral The Raurimu Spiral is a single-track railway spiral, starting with a horseshoe curve, overcoming a height difference, in the central North Island of New Zealand, on the North Island Main Trunk railway (NIMT) between Wellington and Auckland. I ...
(1898) *
Otira Tunnel The Otira Tunnel is a railway tunnel on the Midland Line in the South Island of New Zealand, between Otira and Arthur's Pass. It runs under the Southern Alps from Arthur's Pass to Otira – a length of over . The gradient is mainly 1 in 33, an ...
(completed 1923) *
East Coast Main Trunk Railway The East Coast Main Trunk (ECMT) is a railway line in the North Island of New Zealand, originally running between Hamilton and Taneatua via Tauranga, connecting the Waikato with the Bay of Plenty. The ECMT now runs between Hamilton and Kawerau ...
(completed 1928) * Westfield deviation (completed 1929) * Auckland railway station (1930) *
Stratford–Okahukura Line The Stratford–Okahukura Line (SOL) is a secondary railway line in the North Island of New Zealand, between the Marton - New Plymouth Line (MNPL) and the North Island Main Trunk (NIMT) Railway, with 15 intermediate stations. It is long thr ...
(completed 1932) * Tawa Flat deviation (completed 1935) * Kaimai Railway Tunnel (completed 1978) *
Wellington Urban Motorway The Wellington Urban Motorway, part of SH 1, is the major road into and out of Wellington, New Zealand. It is 7 km long, ranges from three to seven lanes wide, and extends from the base of the Ngauranga Gorge into the Wellington CBD. Fr ...
(from 1965 to 1975) Project was stopped at Ghuznee Street, by the Government of the day. Completion is now being talked about, 45 years on.


See also

*
Minister of Works (New Zealand) The Minister of Works in New Zealand was a former cabinet member appointed by the Prime Minister to be in charge of the Ministry of Works and Development The New Zealand Ministry of Works and Development, formerly the Department of Public W ...
* The Vogel Era *
Opus International Group Opus Group Berhad is the corporate holding company of several companies operating under Opus brand name in several countries: *Opus International (M) Berhad * Opus International Consultants Limited New Zealand *Opus International Consultants (Aus ...
*
Works Infrastructure Downer EDI Works Limited (previously Public Works department, Ministry of Works and Works Infrastructure Limited and often simply Works) is a New Zealand based engineering and construction company owned by the Downer Group. History It was acquire ...
*
Downer EDI Works Downer EDI Works Limited (previously Public Works department, Ministry of Works and Works Infrastructure Limited and often simply Works) is a New Zealand based engineering and construction company owned by the Downer Group. History It was acquire ...


Notes


References

*'' By Design: A brief history of the Public Works Department Ministry of Works 1870-1970'' by Rosslyn J. Noonan (1975, Crown Copyright) {{DEFAULTSORT:Works, Ministry of Ministry of Works Former government agencies of New Zealand 1870 establishments in New Zealand 1993 disestablishments in New Zealand