Navi Mumbai Monorail
   HOME

TheInfoList



OR:

The Navi Mumbai Metro is a
rapid transit Rapid transit or mass rapid transit (MRT), also known as heavy rail or metro, is a type of high-capacity public transport generally found in urban areas. A rapid transit system that primarily or traditionally runs below the surface may be ...
system under construction in the
India India, officially the Republic of India (Hindi: ), is a country in South Asia. It is the seventh-largest country by area, the second-most populous country, and the most populous democracy in the world. Bounded by the Indian Ocean on the so ...
n city of
Navi Mumbai Navi Mumbai (), is a planned city situated on the west coast of the Indian subcontinent, located in the Konkan division of Maharashtra state, on the mainland of India. Navi Mumbai is part of the Mumbai Metropolitan Region (MMR). The city i ...
, Maharashtra. The planning and construction of the Navi Mumbai Metro is being overseen by the
City and Industrial Development Corporation The City and Industrial Development Corporation of Maharashtra (CIDCO) is an Indian city planning agency and richest government authority in India which is formed and controlled by the Government of Maharashtra. CIDCO was formed on 17 March 197 ...
(CIDCO). The system is planned to consist of five rail lines covering a total distance of . The foundation stone for the project was laid on 1 May 2011; following construction delays, the metro's first line was projected to open in 2020. However, due to the ongoing
COVID-19 pandemic The COVID-19 pandemic, also known as the coronavirus pandemic, is an ongoing global pandemic of coronavirus disease 2019 (COVID-19) caused by severe acute respiratory syndrome coronavirus 2 (SARS-CoV-2). The novel virus was first identi ...
, which caused lockdowns, curfews, and lack of labour, which resulted in several delays in construction, the deadline is pushed to 2022 for completion of the first line (Line 1) of Navi Mumbai Metro. The metro's technological infrastructure and rolling stock are being provided by
Ansaldo STS Hitachi Rail STS SpA (from ''Hitachi Rail Signalling and Transportation Systems'') or Hitachi Rail STS (previously Ansaldo STS) is a transportation company owned by Hitachi with a global presence in the field of railway signalling and integrated t ...
, Tata Projects and CSR Zhuzhou.


History

The Navi Mumbai Metro projects received formal approval on 29 April 2010, and a public hearing on 21 May 2010 reported no major objections to the plan. CIDCO was named as the implementing agency of the Belapur–Pendhar–Kalamboli–Khandeshwar line, under the Indian Tramway Act 1886, by the Government of Maharashtra on 30 September 2010. The metro's foundation stone was laid on 1 May 2011 by Chief Minister
Prithviraj Chavan Prithviraj Chavan () (born 17 March 1946) is an Indian politician who was the 17th Chief Minister of Maharashtra, a state in Western India. Chavan is a graduate of the Birla Institute of Technology and Science, Pilani and University of Cali ...
, and general foundation work on the system's first phase commenced in October 2011. In March 2012, CIDCO released the metro's complete master plan, including a proposed connection to the
Mumbai Metro The Mumbai Metro is a rapid transit (MRT) system serving the city of Mumbai and the wider Mumbai Metropolitan Region in Maharashtra, India.Mumbai Metropolitan Region Development Authority is responsible authority for maintaining the metro system ...
. In February 2017, RITES submitted an interim detailed project report (DPR) for Lines II, III and IV of the Navi Mumbai Metro. In February 2013, thousands of villagers in the Navi Mumbai area protested against CIDCO's inaction on local housing developments and its failure to provide restitution for locals affected by infrastructure projects. The protesters pledged to "shut down the CIDCO head office and all development projects in the region. These will include the metro project and any progress on the airport project".


Network

The Navi Mumbai Metro is planned to consist of five lines, totaling in length. , Line 1 of the metro is under construction, with operation projected to commence in 2022.


Line 1

All the phases of Line 1 will be constructed and funded by CIDCO. Lines 2 and 3 will be funded by the
Navi Mumbai Municipal Corporation The Navi Mumbai Municipal Corporation (NMMC) is the municipal organisation of Navi Mumbai, Maharashtra. On 17 December 1991 NMMC was constituted. NMMC came in to existence on January 1, 1992. Headquarters NMMC is considered one of the most ...
and
Mumbai Metropolitan Region Development Authority Mumbai Metropolitan Region Development Authority (MMRDA) is a body of the Government of Maharashtra that is responsible for preparation oRegional Plan for MMRand the infrastructure development of the Mumbai Metropolitan Region. The MMRDA was se ...
respectively. The total cost of Line 1 is estimated to be .


Construction

The Line 1 consists of 20 stations. The proposed route will link
CBD Belapur The Central Business District of Belapur (C.B.D Belapur) is a node of Navi Mumbai. The Navi Mumbai Municipal Corporation is headquartered in Belapur. The Reserve Bank of India maintains a branch office at CBD Belapur. This area is one of the ...
,
Kharghar Kharghar is a node of Navi Mumbai and it is a suburb under Panvel Municipal Corporation. It is situated at the northernmost tip of Raigad district. It was developed by the City and Industrial Development Corporation (CIDCO). Kharghar is now admi ...
, Taloja, Taloja MIDC,
Kalamboli Kalamboli is one of the nodes of Navi Mumbai. It is a transportation hub, being situated at the junction of the Sion-Panvel Highway, NH 48, Panvel By-Pass, NH 66 and Mumbai-Pune Expressway and is among the biggest iron and steel delivery center ...
,
Kamothe Kamothe is a node of Navi Mumbai which is developed and maintained by CIDCO. Kamothe is located on the Sion Panvel Highway. It is the third node after Panvel and Kalamboli towards Mumbai. Location The site of Kamothe adjoins the Central Bu ...
and the Khandeshwar railway station, terminating at the proposed
Navi Mumbai International Airport Navi Mumbai International Airport, officially D. B. Patil International Airport, is an international airport being constructed in Navi Mumbai, Maharashtra, India. It will serve in parallel as an alternative with Mumbai's existing Chhatrapati S ...
. In mid-2012, CIDCO awarded the contract for the construction of the 11.1 km section from Belapur to Pendhar to a consortium of Sanjose (Spain), Mahavira Road and Infrastructure (Navi Mumbai), and Supreme Infrastructure (Mumbai). The original deadline to complete the project was in 2016. This was later extended to mid-2017, and then mid-2018. By January 2017, only 60% of the work on the stations had been completed. Finding the progress of work to be unsatisfactory, CIDCO sent a notice terminating the contract to the consortium on 11 January 2017. On 1 March 2017, CIDCO floated new tenders to construct 11 stations along the Belapur-Pendhar section. The previous contractors had completed 60% of the work on the stations. The new contract with worth . Line 1 is planned to be developed in 3 phases:


Infrastructure

An international consortium of companies including
Ansaldo STS Hitachi Rail STS SpA (from ''Hitachi Rail Signalling and Transportation Systems'') or Hitachi Rail STS (previously Ansaldo STS) is a transportation company owned by Hitachi with a global presence in the field of railway signalling and integrated t ...
, Tata Projects and CSR Zhuzhou will provide the electrical and mechanical systems for the first phase of Line 1. Ansaldo will conduct systems integration and supply train control systems, telecoms, fare collection systems and equipment storage. The metro's standard gauge network would be electrified at 25 kV AC, with power provided via an
overhead catenary An overhead line or overhead wire is an electrical cable that is used to transmit electrical energy to electric locomotives, trolleybuses or trams. It is known variously as: * Overhead catenary * Overhead contact system (OCS) * Overhead equipmen ...
.


Rolling stock

In 2014, the Chinese company CSR Zhuzhou signed a contract with CIDCO to supply rolling stock for the first phase of the metro's Line 1. The three-car trainsets would be long and wide, with a passenger capacity of around 1,100 and a maximum speed of approximately . The trains would feature stainless steel bodies, air-conditioning and LED lighting.


Status Updates

* Dec 2018: Work of elevated corridor almost complete, 50% work on signalling is done and 68% station related work in done. * Mar 2019: Two sets of much-awaited 3- coach metro train for Navi Mumbai Metro arrived at Mumbai Port from China. * Aug 2019: Metro trial run between Panchanand to Pendhar of Line-1 to start from 5 September. Line 1 is expected to be fully operational by mid-2020. * Sep 2019: Between Panchanand and Pendhar metro line of 11 km, 83% work done on station, some track laying done. Trial run started on 3 km of track which is ready. Stations to be ready by December 2019. Full trial run on 11 km of track to start in January 2020. *Sep 2020: Due to
COVID-19 pandemic The COVID-19 pandemic, also known as the coronavirus pandemic, is an ongoing global pandemic of coronavirus disease 2019 (COVID-19) caused by severe acute respiratory syndrome coronavirus 2 (SARS-CoV-2). The novel virus was first identi ...
, which caused lockdowns, curfews and lack of labour in construction,
City and Industrial Development Corporation The City and Industrial Development Corporation of Maharashtra (CIDCO) is an Indian city planning agency and richest government authority in India which is formed and controlled by the Government of Maharashtra. CIDCO was formed on 17 March 197 ...
(CIDCO) pushes deadline for completion of Navi Mumbai Metro Project to 2024. *Sep 2020: Construction work resumed. *Jan 2021: Mahametro to complete Navi Mumbai Metro's Line 1. *Apr 2021: Tenders invited for Navi Mumbai Metro construction of balanced works for Line 1. *May 2021: City and Industrial Development Corporation (CIDCO) successfully completes first trial run of Navi Mumbai Metro from
Kharghar Kharghar is a node of Navi Mumbai and it is a suburb under Panvel Municipal Corporation. It is situated at the northernmost tip of Raigad district. It was developed by the City and Industrial Development Corporation (CIDCO). Kharghar is now admi ...
Metro Station to Taloja Depot. *Jun 2021: Bids invited for
access control system In the fields of physical security and information security, access control (AC) is the selective restriction of access to a place or other resource, while access management describes the process. The act of ''accessing'' may mean consuming ...
at 11 elevated stations of Navi Mumbai Metro's Line 1. *Jul 2021: MahaMetro to operate and maintain Navi Mumbai Metro's Line 1. *Aug 2021: Trial run of Navi Mumbai Metro's entire Line 1 from Central Park Metro Station to Pendhar metro station will be conducted by Research Design and Standard Organization (RDSO) on 28 August. *Aug 2021: Research Design and Standard Organization (RDSO) successfully conducts trial run of Navi Mumbai Metro from central park Metro Station to Pendhar Metro Station, and begins Oscillation Trial and Emergency Braking Distance (EBD) trial of the metro, which is to be conducted in two phases, in which the purpose is to test the dynamic behaviour of the rolling stock in different conditions, with regard to safety, stability and quality rides. These two trials will continue until mid-September, as of 31 August. *Sep 2021: Research Design and Standard Organization (RDSO) successfully conducts Oscillation Trial and Emergency Braking Distance (EBD) trial of the metro. City and Industrial Development Corporation (CIDCO) confirms partial opening of the metro by December. *Oct 2021: The stretch of Line-1 of Navi Mumbai Metro from Pendhar to Central Park in Kharghar will be opened by December. *Nov 2021: Navi Mumbai Metro gets Interim Speed Certificate from RDSO for Line-1. *Jan 2022: Safety trials for Line-1 will be conducted on 17–18 January by the Commission of Railway Safety (CMRS). After the trials, the CMRS will give a safety certificate, after which Line-1 will begin commercial operations. *Mar 2022: The final inspection by the CMRS team started on the 7 and 8 March.


Gallery

Some images of the under-construction Belapur Terminal Station. File:NaviMumbaiMetro Belapur Terminal Construction Photo 3.jpg File:NaviMumbaiMetro Belapur Terminal Construction Photo 2.jpg File:NaviMumbaiMetro Belapur Terminal Construction Photo 1.jpg File:NaviMumbaiMetro Belapur Terminal Construction Photo 4.jpg File:NaviMumbaiMetro-Logo.png


See also

* Urban rail transit in India **
Mumbai Metro The Mumbai Metro is a rapid transit (MRT) system serving the city of Mumbai and the wider Mumbai Metropolitan Region in Maharashtra, India.Mumbai Metropolitan Region Development Authority is responsible authority for maintaining the metro system ...
**
Pune Metro Pune Metro is a  mass rapid transit system serving the city of Pune, India. The system comprises 3 lines with a combined length of 54.58 km, of which 12 km on two lines are operational as of March 2022. The 16.59-km Purple line from PCMC B ...
** Nagpur Metro ** Greater Nashik Metro * List of metro systems *
Public transport in Mumbai Public transport in Mumbai involves the transport of millions of its citizens by train, road, and water. As of 2015, 52% of commuters use public transport. Mumbai has the largest organized bus transport network among major Indian cities. Mumb ...


References

{{authority control Transport in Navi Mumbai Airport rail links in India Standard gauge railways in India