Morupule Thermal Power Station is a coal-fired power station in Botswana. It is responsible for an estimated 80 percent of the country's domestic power generation.[1]

Location

The power station is located near the town of Palapye, in the Central District, approximately 270 kilometres (168 mi), by road, north-east of Gaborone, Botswana's capital city.[2] The geographical coordinates of Morupule Thermal Power Station are 22°31'12.0"S, 27°02'12.0"E (Latitude:-22.520000; Latitude:27.036667).[3]

Overview

Morupule A

Morupule A Power Station comprises four air-cooled 33 megawatts coal-fired units, with coal supplied from the adjacent Morupule Colliery, owned by Debswana. Total generation capacity is 132 megawatts. Construction on the existing station started in 1982 and was completed in 1989.[4]

In 2016, the government of Botswana sourced funds to renovate and restore Morupule A. The contract was won by Doosan Heavy Industries & Construction at a contract price of BWP:2.5 billion (US$204 million in 2016 money). The upgrade was expected to last until 2018. On completion of the upgrade Morupule A is expected to function at 80 percent plant availability for another 15 years (until 2033).[5]

Morupule B

Botswana Power Corporation (BPC) was considering an expansion of the Morupule Power Station since 2006. BPC eventually decided on 600 megawatts, consisting of four 150 megawatts units.[1] At the time this project was concep

The power station is located near the town of Palapye, in the Central District, approximately 270 kilometres (168 mi), by road, north-east of Gaborone, Botswana's capital city.[2] The geographical coordinates of Morupule Thermal Power Station are 22°31'12.0"S, 27°02'12.0"E (Latitude:-22.520000; Latitude:27.036667).[3]

Overview

Morupule A

Morupule A Power Station comprises four air-cooled 33 megawatts coal-fired units, with coal supplied from the adjacent Morupule Colliery, owned by Debswana. Total generation capacity is 132 megawatts. Construction on the existing station started in 1982 and was completed in 1989.[4]

In 2016, the government of Botswana sourced funds to renovate and restore Morupule A. The contract was won by Doosan Heavy Industries & Construction at a contract price of BWP:2.5 billion (US$204 million in 2016 money). The upgrade was expected to last until 2018. On completion of the upgrade Morupule A is expected to function at 80 percent plant availability for another 15 years (until 2033).[5]

Morupule B

Mor

Morupule A and Morupule B are both owned 100 percent by the Botswana Power Corporation (BPC).[1][6]