More Hall Annex
   HOME

TheInfoList



OR:

The More Hall Annex, formerly the Nuclear Reactor Building, was a building on the campus of the
University of Washington The University of Washington (UW, simply Washington, or informally U-Dub) is a public research university in Seattle, Washington. Founded in 1861, Washington is one of the oldest universities on the West Coast; it was established in Seattl ...
(UW) in
Seattle Seattle ( ) is a seaport city on the West Coast of the United States. It is the seat of King County, Washington. With a 2020 population of 737,015, it is the largest city in both the state of Washington and the Pacific Northwest regio ...
, Washington, United States, that once housed a functional
nuclear research reactor Research reactors are nuclear fission-based nuclear reactors that serve primarily as a neutron source. They are also called non-power reactors, in contrast to power reactors that are used for electricity production, heat generation, or mariti ...
. It was inaugurated in 1961 and shut down in 1988, operating at a peak of 100 kilowatts thermal (kWt), and was officially decommissioned in 2007. The reactor was housed in a reinforced concrete building designed in the Brutalist architectural style by UW faculty members. They designed the reactor room with large windows that allowed observation from the outside, in an attempt to demonstrate the safety of nuclear energy. The Nuclear Reactor Building was added to the
National Register of Historic Places The National Register of Historic Places (NRHP) is the United States federal government's official list of districts, sites, buildings, structures and objects deemed worthy of preservation for their historical significance or "great artistic ...
in 2009, after a campaign led by an architecture student in response to the proposed demolition of the building. A later demolition plan prompted a lawsuit from preservation groups, which ended with a court ruling exempting the building from the city's landmarks-preservation ordinance. While this decision was eventually overturned, the university demolished the building in July 2016 and replaced it with a new
computer science Computer science is the study of computation, automation, and information. Computer science spans theoretical disciplines (such as algorithms, theory of computation, information theory, and automation) to practical disciplines (includi ...
building that opened in February 2019.


Design and functions

The building housed an
Argonaut class reactor The Argonaut class reactor is a design of small nuclear research reactor. Many have been built throughout the world, over a wide range of power levels. Its functions are to teach nuclear reactor theory, nuclear physics Nuclear physics is the fie ...
with an initial output of 10 kilowatts thermal (kWt), later increased to 100 kWt in 1967. It used
uranium-235 Uranium-235 (235U or U-235) is an isotope of uranium making up about 0.72% of natural uranium. Unlike the predominant isotope uranium-238, it is fissile, i.e., it can sustain a nuclear chain reaction. It is the only fissile isotope that exi ...
as fuel and was cooled by water. The reactor's chamber, placed on the lower floor of the facility, was high, long, and wide. During its 27-year lifespan, the reactor operated for the equivalent of 140 days, running for some days at half power and for as little as 10 minutes. The More Hall Annex was a two-story, reinforced concrete structure designed in the Brutalist style, similar to other buildings on the university campus built during the post-war era. It occupied a footprint of from north to south and from east to west, with a total of of interior space. The building was designed by a consortium of UW faculty members, known as The Architect Artist Group (TAAG), with input from nuclear engineering department chair Albert L. Babb. Babb requested a building that would "show the world what nuclear power looked like", desiring a prominent structure on the campus that would serve as a crown jewel for the department. The large glass walls enabled public viewing of the reactor room's interior, showcasing the activity inside. The first floor, partly covered by the outdoor
plaza A town square (or square, plaza, public square, city square, urban square, or ''piazza'') is an open public space, commonly found in the heart of a traditional town but not necessarily a true geometric square, used for community gatherings. ...
, housed the reactor, laboratory, crystal
spectrometer A spectrometer () is a scientific instrument used to separate and measure spectral components of a physical phenomenon. Spectrometer is a broad term often used to describe instruments that measure a continuous variable of a phenomenon where the ...
, counting room with a
nuclear densometer Nuclear densitometry is a technique used in civil construction and the petroleum industry, as well as for mining and archaeology purposes, to measure the density and inner structure of the test material. The processes uses a nuclear density gauge, ...
, classrooms, restrooms, and offices. The second floor contained the control room, an observatory, and a lecture room overlooking the reactor; it was open to the outdoor plaza on three sides, with large glass windows allowing for public observation of experiments. The reactor was placed on the lower side of the building, downhill of the plaza, to allow the ground to absorb accidental radiation leaks. The structure's roof rested on a series of perpendicular beams that also supported a three-
ton Ton is the name of any one of several units of measure. It has a long history and has acquired several meanings and uses. Mainly it describes units of weight. Confusion can arise because ''ton'' can mean * the long ton, which is 2,240 pounds ...
( kg) crane used to lift the reactor shield between experiments.


History

During the late 1950s and 1960s, the Atomic Energy Commission (AEC) provided universities and colleges with grants to acquire small nuclear reactors for research programs. The
University of Washington The University of Washington (UW, simply Washington, or informally U-Dub) is a public research university in Seattle, Washington. Founded in 1861, Washington is one of the oldest universities on the West Coast; it was established in Seattl ...
began nuclear engineering classes as part of the College of Engineering in 1953 and formed a Department of Nuclear Engineering in 1956, accepting engineers from
Boeing The Boeing Company () is an American multinational corporation that designs, manufactures, and sells airplanes, rotorcraft, rockets, satellites, telecommunications equipment, and missiles worldwide. The company also provides leasing and p ...
and the nearby
Hanford Site The Hanford Site is a decommissioned nuclear production complex operated by the United States federal government on the Columbia River in Benton County in the U.S. state of Washington. The site has been known by many names, including SiteW a ...
as its first students. The Nuclear Engineering department used training reactors at Bagley Hall and later proposed that the university acquire a nuclear reactor to be installed on campus. In 1957, the AEC approved $100,000 in funding (equivalent to $ in dollars) for the University of Washington to install a permanent nuclear reactor on the campus, the first of its kind in the United States. The proposed 10 kW reactor was approved by the university's Board of Regents in April 1959, to be housed in a two-story reinforced concrete building with offices, workshops, a control room, and class and seminar spaces. The building was designed by TAAG architects Wendell Lovett, Gene Zema and Daniel Streissguth, all members of the UW faculty. In December, the regents awarded the construction contract to Jentoft & Forbes, paying $308,082 (equivalent to $ in dollars) for the project. A site at the eastern edge of the campus was chosen for its proximity to various academic engineering buildings and its visibility to the public. The AEC granted an operating license for the reactor to the university in April 1961, and the reactor began operating with a self-sustained nuclear reaction on April 10. It was officially dedicated on June 1, in a ceremony attended by Argonne National Laboratory director
Norman Hilberry Norman Hilberry (March 11, 1899 – March 28, 1986) was an American physicist, best known as the director of the Argonne National Laboratory from 1956 to 1961. In December 1942 he was the man who stood ready with an axe to cut the scram line duri ...
, a physicist who worked on Chicago Pile-1, the world's first nuclear reactor to achieve criticality. During the 1962 World's Fair, hosted by the city at the
Seattle Center Seattle Center is an arts, educational, tourism and entertainment center in Seattle, Washington, United States. Spanning an area of 74 acres (30 ha), it was originally built for the 1962 World's Fair. Its landmark feature is the tall Space Needle ...
, the reactor became the subject of group tours from professional organizations. Throughout the 1960s, the reactor was used for medical research by the university's School of Medicine and local hospitals, with a staff of six full-time employees and four part-time staff (most of whom were students who worked for the U.S. Navy's nuclear programs). In 1966, the university and local law enforcement agencies proposed converting the reactor into a part-time laboratory for forensic science. By 1975, the reactor had only used of its of uranium-235 fuel.


1972 plutonium spill

On June 13, 1972, during an experiment that used a
plutonium Plutonium is a radioactive chemical element with the symbol Pu and atomic number 94. It is an actinide metal of silvery-gray appearance that tarnishes when exposed to air, and forms a dull coating when oxidized. The element normally exhibi ...
sample, three lab workers were exposed to radiation after a capsule holding the sample spilled, requiring a full investigation of the nuclear reactor. One of the workers, graduate student W. Robert Sloan, was exposed to of plutonium dust and drove to a laboratory in Richland to be tested for radiation, but was found to have not been significantly contaminated. The spill was later linked to vibrations in the capsule holding the sample, and workers credited good design and careful handling in avoiding a larger incident. A visiting class of schoolchildren from
Montana Montana () is a state in the Mountain West division of the Western United States. It is bordered by Idaho to the west, North Dakota and South Dakota to the east, Wyoming to the south, and the Canadian provinces of Alberta, British Columb ...
, observing the reactor from the outside, were unaffected by the accident. After an inspection by teams from the Hanford Site, the lab was cleaned and wiped down while periodic radiation checks were performed. Contaminated materials were sanitized with a liquid
freon Freon ( ) is a registered trademark of the Chemours Company and generic descriptor for a number of halocarbon products. They are stable, nonflammable, low toxicity gases or liquids which have generally been used as refrigerants and as aerosol prope ...
solution and disposed of; the clean-up cost a total of $30,000 in emergency funds (equivalent to $ in dollars). The university was cited by the AEC for violations of its reactor-operating license in connection with the incident, but none in direct connection to the immediate cause. The incident resulted in an investigation by the Nuclear Reactor Advisory Committee into its review processes for reactor experiments, after the AEC determined there was inadequate review of the UW experiment. The staff members were praised by the AEC for protecting the public by sealing the materials and evacuating the building for six hours.


Shutdown and decommissioning

In the late 1970s, development of
nuclear power in the United States Nuclear power in the United States is provided by 92 commercial reactors with a net capacity of 94.7 gigawatts (GW), with 61 pressurized water reactors and 31 boiling water reactors. In 2019, they produced a total of 809.41 terawatt-hours of e ...
slowed to a halt, as new plants were cancelled or put on hold. The 1983 financial collapse of the
Washington Public Power Supply System Energy Northwest (formerly Washington Public Power Supply System) is a public power joint operating agency in the northwest United States, formed in 1957 by Washington state law to produce at-cost power for Northwest utilities. Headquartered in ...
, a government agency planning to build five large nuclear power plants throughout the state, and the
Three Mile Island accident The Three Mile Island accident was a partial meltdown of the Three Mile Island, Unit 2 (TMI-2) reactor in Pennsylvania, United States. It began at 4 a.m. on March 28, 1979. It is the most significant accident in U.S. commercial nuclea ...
of 1979 both contributed to a decline in interest in the university's nuclear program. Student use of the reactor was replaced by commercial use to produce nuclear isotopes for medical use. By 1988, the enrollment in UW's nuclear engineering program had shrunk to 23 students, and the program was cancelled entirely in 1992. The reactor was shut down on June 30, 1988, following a Nuclear Regulatory Commission (NRC) mandate to convert research reactors to lower-grade fuel, or shut them down entirely, after fears of possible terrorist access. The remaining of enriched uranium fuel rods were transported to
Idaho Idaho ( ) is a state in the Pacific Northwest region of the Western United States. To the north, it shares a small portion of the Canada–United States border with the province of British Columbia. It borders the states of Montana and Wyomi ...
for processing and disposal. The building provided offices and storage space for various UW departments, including the College of Engineering's robotics laboratory. The University of Washington applied to the NRC to dismantle the reactor on August 2, 1994. In the wake of the September 11, 2001 attacks, the Nuclear Reactor Building was renamed to the More Hall Annex to deter burglary, after a request from the NRC. Formal decommissioning of the site, including a $4 million cleanup (equivalent to $ in dollars), began in April 2006, amid student protests over the contractor hired for the work. The NRC formally terminated the university's license to operate the reactor in May 2007.


Preservation attempts

Prior to the removal of the reactor in October 2008, the university proposed demolishing the structure and redeveloping the site for other uses. The plan was stopped after the reactor building was placed on the
Washington Heritage Register The Washington Heritage Register is an official list of sites and properties found throughout Washington state, United States. The Washington Heritage Register is administered by the Washington State Department of Archaeology and Historic Preserva ...
, the state's list of historic buildings, a designation that was contested by the University of Washington. Preservationists suggested re-using the building as a museum dedicated to the state's nuclear history and continuing research. The structure was added to the
National Register of Historic Places The National Register of Historic Places (NRHP) is the United States federal government's official list of districts, sites, buildings, structures and objects deemed worthy of preservation for their historical significance or "great artistic ...
in 2009, based on an application submitted by Abby Inpanbutr (née Martin), a UW architecture student, in spring 2008. The university again proposed demolition of the structure in 2015, to clear the space for a new
computer science Computer science is the study of computation, automation, and information. Computer science spans theoretical disciplines (such as algorithms, theory of computation, information theory, and automation) to practical disciplines (includi ...
building adjacent to the existing Paul G. Allen School of Computer Science & Engineering. In May 2015, the More Hall Annex was named one of Washington's "most endangered historic properties" by the Washington Trust for Historic Preservation, which cited its place as an early Brutalist work to justify its preservation. The university released a draft supplemental environmental impact statement (SEIS) for the project in October 2015, recommending the demolition of the More Hall Annex in their preferred alternative. In response to the SEIS, building conservation group Docomomo WEWA nominated the More Hall Annex for city landmark status on December 2. The University of Washington filed a lawsuit against the City of Seattle and Docomomo on December 18 over the landmark nomination and whether the city could enforce its landmark preservation laws on state-owned property. The
King County Superior Court The Superior Court of Washington for King County (more commonly, the King County Superior Court) is the largest trial court in Washington state. It is based at the King County Courthouse, 516 Third Avenue, in downtown Seattle, Washington. It als ...
ruled in April that the university was exempt from the city's landmarks-preservation ordinance and could go ahead with demolition of the More Hall Annex. While the city and preservationists appealed the decision, they allowed the demolition of the More Hall Annex to proceed by not seeking a
stay Stay may refer to: Places * Stay, Kentucky, an unincorporated community in the US Law * Stay of execution, a ruling to temporarily suspend the enforcement of a court judgment * Stay of proceedings, a ruling halting further legal process in a tri ...
that would leave them responsible for
damages At common law, damages are a remedy in the form of a monetary award to be paid to a claimant as compensation for loss or injury. To warrant the award, the claimant must show that a breach of duty has caused foreseeable loss. To be recognised at ...
compensation. The decision was appealed to the
Washington Supreme Court The Washington Supreme Court is the highest court in the judiciary of the U.S. state of Washington. The court is composed of a chief justice and eight associate justices. Members of the court are elected to six-year terms. Justices must retir ...
, which ruled in the city's favor and rejected the university's claimed exemption from the city landmarks preservation ordinance.


Demolition

On February 11, 2016, the UW Board of Regents approved a site plan that would demolish the More Hall Annex to allow for the construction of the new computer science center, to open in 2019. An attempt to incorporate elements of the nuclear reactor into the new computer science building was rejected because of the impact of potential
seismic retrofit Seismic retrofitting is the modification of existing structures to make them more resistant to seismic activity, ground motion, or soil failure due to earthquakes. With better understanding of seismic demand on structures and with our recent exp ...
s that would be required to meet modern standards. The computer science department instead plans to make a
virtual tour A virtual tour is a simulation of an existing location, usually composed of a sequence of videos, still images or 360-degree images. It may also use other multimedia elements such as sound effects, music, narration, text and floor map. It is dis ...
of the building available online in a digital archive. After the decision by the King County Superior Court to exempt the building from city preservation ordinances, the university applied for a demolition permit in May 2016. Demolition of the More Hall Annex began on July 19, and preservationists held a mock funeral for the building with Daniel Streissguth, one of the project's original architects.


Replacement

The More Hall Annex was replaced by the Bill & Melinda Gates Center for Computer Science & Engineering, which houses part of the university's computer science program. The building includes a 250-person lecture hall, classrooms, and lab spaces for robotics and other technologies. In January 2017, the Board of Regents approved its construction, which began later in the year. The building was
topped out In building construction, topping out (sometimes referred to as topping off) is a builders' rite traditionally held when the last beam (or its equivalent) is placed atop a structure during its construction. Nowadays, the ceremony is often parlaye ...
in December 2017, roughly marking the halfway point in construction. The Bill & Melinda Gates Center was opened to students on February 28, 2019.


References


External links

{{commons category, University of Washington Nuclear Reactor Building
Building profile
at Docomomo WEWA
Historic footage of reactor, 1963
from UW Libraries
Save the Reactor
a historic preservation campaign for the building
YouTube video tour
from PreserveWA 1961 establishments in Washington (state) 1988 disestablishments in Washington (state) Brutalist architecture in Washington (state) Buildings and structures completed in 1961 Buildings and structures demolished in 2016 Demolished buildings and structures in Washington (state) Nuclear reactors in Washington (state) Argonaut class reactor University of Washington campus