Mohave Power Station (known also as Mohave Generating Station, or MOGS) was a 1580 megawatt electric (MWe)
coal Coal is a combustible black or brownish-black sedimentary rock, formed as rock strata called coal seams. Coal is mostly carbon with variable amounts of other elements, chiefly hydrogen, sulfur, oxygen, and nitrogen. Coal is formed when ...
-fired
power plant A power station, also referred to as a power plant and sometimes generating station or generating plant, is an industrial facility for the generation of electric power. Power stations are generally connected to an electrical grid. Many ...
that was located in Laughlin,
Nevada Nevada ( ; ) is a U.S. state, state in the Western United States, Western region of the United States. It is bordered by Oregon to the northwest, Idaho to the northeast, California to the west, Arizona to the southeast, and Utah to the east. N ...
.
Southern California Edison Southern California Edison (or SCE Corp), the largest subsidiary of Edison International, is the primary electricity supply company for much of Southern California. It provides 15 million people with electricity across a service territory of ap ...
is the majority owner of the plant and was its operator. The plant entered commercial operation in 1971. A steam line that ran near the plant's control room and cafeteria ruptured on June 9, 1985, fatally scalding six and injuring ten more. In 2005, the plant was shut down and was later dismantled.


Design

The plant was composed of two units capable of generating 790 MWe each. During normal operation, output varied between 350 and 750 MWe; the
baseload The base load (also baseload) is the minimum level of demand on an electrical grid over a span of time, for example, one week. This demand can be met by unvarying power plants, dispatchable generation, or by a collection of smaller intermittent e ...
plant operated with a
capacity factor The net capacity factor is the unitless ratio of actual electrical energy output over a given period of time to the theoretical maximum electrical energy output over that period. The theoretical maximum energy output of a given installation is def ...
of 71.5% between 1990 and 1998. Combustion Engineering supplied the boilers and GE supplied the turbine-generators. Bechtel was the architect-engineer, responsible for engineering, procurement and construction. The Mohave Generating Station was built on a site in the
Mojave Desert The Mojave Desert ( ; mov, Hayikwiir Mat'aar; es, Desierto de Mojave) is a desert in the rain shadow of the Sierra Nevada mountains in the Southwestern United States. It is named for the indigenous Mojave people. It is located primarily ...
adjacent to the
Colorado River The Colorado River ( es, Río Colorado) is one of the principal rivers (along with the Rio Grande) in the Southwestern United States and northern Mexico. The river drains an expansive, arid watershed that encompasses parts of seven U.S. s ...
in Laughlin,
Clark County, Nevada Clark County is located in the U.S. state of Nevada. As of the 2020 census, the population was 2,265,461. Most of the county population resides in the Las Vegas Census County Divisions, which hold 1,771,945 people as of the 2010 Census, acros ...
. It had
supercritical boiler A supercritical steam generator is a type of boiler that operates at supercritical pressure, frequently used in the production of electric power. In contrast to a subcritical boiler in which bubbles can form, a supercritical steam generator o ...
s and cross-compound
steam turbines A steam turbine is a machine that extracts thermal energy from pressurized steam and uses it to do mechanical work on a rotating output shaft. Its modern manifestation was invented by Charles Parsons in 1884. Fabrication of a modern steam turbin ...
. The plant was owned by a utility consortium of operator Southern California Edison Co (56%),
LADWP The Los Angeles Department of Water and Power (LADWP) is the largest municipal utility in the United States with 8,100 megawatts of electric generating capacity (2021-2022) and delivering an average of 435 million gallons of water per day to more ...
(10%),
Nevada Power Nevada Power Company (NPC) was a Las Vegas-based company that produced, distributed, and sold electricity in the southern part of the state of Nevada. In 2005, it had over 700,000 electric customers in parts of three Nevada counties — a serv ...
(14%), and
Salt River Project The Salt River Project (SRP) is the umbrella name for two separate entities: the Salt River Project Agricultural Improvement and Power District, an agency of the state of Arizona that serves as an electrical utility for the Phoenix metropolitan a ...
(20%). Mohave was the only power plant in the United States that used coal delivered by coal-slurry pipeline, composed of approximately half coal and half water. The 18 inch (460 mm) diameter Black Mesa Pipeline ran to the plant from the
Peabody Energy Peabody Energy is a coal mining and energy company headquartered in St. Louis, Missouri. Its primary business consists of the mining, sale, and distribution of coal, which is purchased for use in electricity generation and steelmaking. Peabody ...
Black Mesa Mine The Kayenta mine was a surface coal mine operated by Peabody Western Coal Company (a subsidiary of Peabody Energy) on the Navajo Nation in northern Arizona from 1973 to 2019. About 400 acres were mined and reclaimed each year, providing about ...
in Kayenta, AZ, and could deliver per hour. The coal slurry was stored in four storage tanks or eight Marcona ponds. Each storage tank held up to , the equivalent of of dry coal; the conical Marcona ponds were each in diameter and deep, for a capacity of or of coal. Eight full ponds was the equivalent of a 40-day supply of coal for the plant. The slurry transport water was separated from the coal through a series of centrifuges, which removed approximately 75% of the water, the damp coal then passed through pulverizers for drying and grinding. The plant had a total of 20 pulverizers, each of which could process of coal per hour. The separated water was stored in clariflocculators to allow remaining coal fines to settle; the water was then recycled for cooling tower water makeup; this and all other waste water was reused, making Mohave a zero-discharge facility. At full capacity, the plant consumed of coal per day. Ash was collected from the bottom of the steam generating units (bottom and economizer ash) and captured via electrostatic precipitation from the plant's stack (fly ash); 70% of the plant's total ash was fly ash, and almost all of the fly ash was sold to be used as a concrete additive. Approximately of bottom ash and of sludge were placed in an onsite landfill each year; the disposal site, named Ash Canyon, was approximately in area. A in diameter natural-gas pipeline also ran to the plant from a gas facility near
Topock, Arizona Topock ( Mojave: Tuupak) (pronounced ''/'Toe-pock'/'' by locals) is a small unincorporated community and census-designated place (CDP) in Mohave County, Arizona, United States. As of the 2020 census, the population within the CDP was 2. Topock a ...
to supply the required heat to start the plant, although the pipeline was too small to operate the plant exclusively on natural gas. Electricity was transmitted via two 500kV lines to substations in southern Nevada and southern California.


History


Commissioning

The plant's two identical units went into initial operation in 1971.


Early failures

The plant's turbine-generators suffered two early failures before 1975. Both of these failures resulted in failures of the turbine-generators, and both failures occurred during unseasonably cold weather. The cold weather proved to be the essential clue. One of the joint owners (LADWP) was assigned to determine the cause of these failures, through use of computer simulations. The power station and its connected 500 kV transmission systems (one to California, the other to Nevada) were subjected to extensive simulations, which ultimately led to identification of the root cause of the failures. When initially installed, the then-new concept of "series compensation" (sets of capacitors connected in series at the sending- and receiving-ends of the transmission lines) were installed, with the expectation that this "series compensation" would reduce or even eliminate the losses inherent with long distance power transmission lines. What was not then known, but was later identified during the simulations, which were performed in the System Development Division of LADWP, was the series resistance of the
ACSR Aluminium conductor steel-reinforced cable (ACSR) is a type of high-capacity, high-strength stranded conductor typically used in overhead power lines. The outer strands are high-purity aluminium, chosen for its good conductivity, low weight, lo ...
transmission lines, when under near freezing conditions, combined with the "series compensation", which was designed to counteract the series impedance of the lines, could, under certain conditions of generation and load, and low ambient temperatures, place an effective negative impedance on the generators, thereby causing a mechanical response by the turbine-generators that resulted in their destruction. This behavior had not been anticipated, and as it had not been anticipated, it could hardly have been simulated prior to the installation and commissioning of the power station. In general, such simulations focused on steady-state system behavior, not subsystem transient behavior. These two failures caused a renewed interest in "dynamic" simulation. Only "static" (that is, steady-state) simulation had been done previously.
General Electric General Electric Company (GE) is an American multinational conglomerate founded in 1892, and incorporated in New York state and headquartered in Boston. The company operated in sectors including healthcare, aviation, power, renewable ene ...
, the manufacturer of the turbine-generators, refused to repair or replace subsequent damage—after all it had already replaced two failed turbine-generators due to reasons which were then unknown, and were subsequently proved not to be its fault—so new operational procedures were implemented to prevent subsequent failures. These procedures were successful, and there were no more turbine-generator failures. But, these new procedures would not address what later happened, due to other causes, including improper operation of the steam generator's "reheat" system, which is a usual, and necessary part of a "compound" turbine-generator system (a high-pressure 3600 rpm turbine section compounded with a lower-pressure 1800 rpm turbine section, both of which were supplied by the same steam generator, but using separate reheat "loops").


1985 pipe failure disaster

At 3:25 pm on June 9, 1985, a hot reheat line, carrying steam at , burst open. The reheat line circulates exhaust steam from the high pressure turbine back through the boiler stack, where it is reheated before entering the low pressure turbine. A steam cloud blew down a door leading to the control room of the station, fatally scalding six workers: Michael Bowman, John Dolan, Ernest Hernandez, Terry Leroy, Danny Norman, and Howard Turner. Ten others were injured. A preliminary report cited a faulty weld as the immediate cause. Approximately 35 employees were on-site at the time; of those, 20 were in the control room. The station was out of service for six months while all the steam piping was replaced. A report on the accident was completed in May 1991, but was not released until Christmas Day because of Edison's objections that it would compromise civil suits. Although several factors contributed to the pipe's failure, the report said Edison's actions—or lack of actions—were "primary and critical factors in causing the accident": * Edison knowingly operated the system at temperatures above design specification for long periods of time, and operators were unable to control the temperatures within the system as a result of a "design flaw." * Even so, the pipe, part of a steam reheat system, was not routinely maintained or inspected, though the pipe shifted and distorted because of exposure to abnormal stresses, the report said. * Edison's management made high production a priority over safety. In 1979, Edison disciplined a supervisor for ordering an unauthorized inspection of unrelated pipe welds. "The fear SCE management has instilled in its employees is counterproductive to safety and increases the chances that additional incidents as serious as this one may occur in the future," the report said. The report found no evidence that the accident was caused by a specific action on the day of the pipe failure. The report recommended sweeping changes to Edison's policies, including annual reports to the PUC on the utility's safety training, inspection and maintenance programs. In addition, the report argues that, because the accident was avoidable, the costs should be borne by Edison's shareholders, not its rate-paying customers.


Shutdown

The plant was shut down on December 31, 2005, with the possibility it may not reopen. With the shutdown of the plant, the mine supplying the coal was also closed as well. The land where the mine was located is owned by the
Navajo The Navajo (; British English: Navaho; nv, Diné or ') are a Native Americans in the United States, Native American people of the Southwestern United States. With more than 399,494 enrolled tribal members , the Navajo Nation is the largest fe ...
and
Hopi The Hopi are a Native American ethnic group who primarily live on the Hopi Reservation in northeastern Arizona, United States. As of the 2010 census, there are 19,338 Hopi in the country. The Hopi Tribe is a sovereign nation within the United ...
tribes. This closure had a major negative impact on the Hopi. The plant was shut to comply with a consent agreement reached to settle a 1998 CAA lawsuit brought by several environmental groups. The plant had been targeted as a major source of pollution in the Grand Canyon and other locations to the east. Furthermore, the Hopi and Navajo signed an agreement preventing the use of water from the local aquifer to make up slurry. Various plans were presented, including selling the plant and retrofitting it to burn natural gas, although the latter would have required construction of a second high pressure gas line from Topock, to the south. Another option would have been to install exhaust scrubbers, which would have cost $1 billion. In May 2007, SCE discontinued efforts to restart or sell the plant.


Dismantling

On June 10, 2009, Southern California Edison announced that the Mohave Generating Station would be decommissioned and all generating equipment would be removed from the site. Later, SCE announced that all administrative buildings on site would also be razed. The only structure remaining on the property will be the 500 kV switchyard, which will continue to serve as a switching location for the regional bulk power system as well as provide electricity to a nearby Nevada Power substation supplying the Laughlin area. Dismantling got underway in October 2009 and is expected to take 2 years and cost $30 million. About 300 staff lost their jobs when the plant was closed. On March 11, 2011, the exhaust stack, a longtime landmark of the Laughlin/Bullhead City area, was felled by explosives. In October 2016, the entire site was listed for sale.


Owners

*
Southern California Edison Southern California Edison (or SCE Corp), the largest subsidiary of Edison International, is the primary electricity supply company for much of Southern California. It provides 15 million people with electricity across a service territory of ap ...
(56%) *
Salt River Project The Salt River Project (SRP) is the umbrella name for two separate entities: the Salt River Project Agricultural Improvement and Power District, an agency of the state of Arizona that serves as an electrical utility for the Phoenix metropolitan a ...
(20%) * Nevada Power Company (14%) *
Los Angeles Department of Water and Power The Los Angeles Department of Water and Power (LADWP) is the largest municipal utility in the United States with 8,100 megawatts of electric generating capacity (2021-2022) and delivering an average of 435 million gallons of water per day to more ...
(10%)


References

{{Energy resource facilities in Nevada 1971 establishments in Nevada 2005 disestablishments in Nevada Coal-fired power stations in Nevada Buildings and structures in Laughlin, Nevada Former coal-fired power stations in the United States Southern California Edison Energy infrastructure completed in 1971 Former power stations in Nevada