Medupi Power Station is a dry-cooled coal-fired power station built by
Eskom Eskom Hld SOC Ltd or Eskom is a South African electricity public utility. It was established in 1923 as the Electricity Supply Commission (ESCOM) and was also known by its Afrikaans name Elektrisiteitsvoorsieningskommissie (EVKOM). Eskom repre ...
near
Lephalale Lephalale (formerly Ellisras) is a coal mining town in the Limpopo province of South Africa immediately east of the Waterberg Coalfield. The town was established as Ellisras in 1960 and named after Patrick Ellis and Piet Erasmus who settled on a ...
in
Limpopo Limpopo is the northernmost province of South Africa. It is named after the Limpopo River, which forms the province's western and northern borders. The capital and largest city in the province is Polokwane, while the provincial legislature is ...
province,
South Africa South Africa, officially the Republic of South Africa (RSA), is the Southern Africa, southernmost country in Africa. It is bounded to the south by of coastline that stretch along the Atlantic Ocean, South Atlantic and Indian Oceans; to the ...
. The name chosen for the station, Medupi, is a Sepedi word which means "gentle rain". With an installed capacity of 4,764 MW, when fully operational it should be the 8th largest coal-fired power station in the world.


Original concept

Medupi was conceived as Project Alpha in 2007, with only three units planned to total 2,400 MW and estimated cost of R32 billion. The design was changed at a late stage in 2007 and doubled in size to 4,764 MW. The boilers were envisaged to be supercritical in type, which would make them 38% more effective than other Eskom power stations. A dry cooled system was also intended to use less water than other coal-fired power stations in the fleet. Initial project costing was estimated at R69 billion but that was updated to approximately R80 billion by 2007.
Parsons Brinckerhoff WSP USA, formerly WSP, Parsons Brinckerhoff and Parsons Brinckerhoff, is a multinational engineering and design firm with approximately 14,000 employees. WSP stands for Williams Sale Partnership. The firm operates in the fields of strategic con ...
was appointed as the project engineer to oversee all construction.


Power output


Design

The power station has six boilers each powering 794 MW turbines, producing 4,764 MW in total. When completed, Medupi became the largest dry-cooled coal-fired power station in the world.


Awards

Medupi's GE Steam Power Systems was awarded a Global Project Excellence Gold Award at the 2016 IPMA Project Excellence Awards.


Main equipment suppliers

Alstom provided the steam turbines, whilst Hitachi provided the super critical boilers.


Coal supply

Medupi is supplied with coal from
Exxaro Exxaro Resources Limited (Exxaro, the company or the group) is a South Africa-based diversified resources company with a robust coal business and acquisitive growth prospects in minerals and energy solutions. Exxaro is among the top five coal ...
's
Grootegeluk coal mine The Grootegeluk Coal Mine is an open cast coal mine within the Waterberg Coalfield of the Limpopo province of South Africa. It is operated by Exxaro. The mine is from Lephalale, and employs 2,000 people. Discovery In 1920, coal was found in ...
, located north of the site. Eskom placed a contract with Exxaro to supply 14.6 MT of coal per year for 40 years.


Power generation


Construction timeline

Completion of the first two units was expected by 2012 but various delays impacted progress. The first 794 MW unit was commissioned and handed over to Eskom Generation on 23 August 2015. Units 5 to 1 was completed at approximately nine-month intervals thereafter. * 18 July 2008, first structural concrete poured. * 21 November 2008, first three air-cooled condenser columns completed. * August 2009, Unit 6 boiler lift shaft completed. * 9 February 2010, first structural steel erected at Unit 6 boiler. * 12 August 2010, Chimney South concrete slide completed to a height of 220m. * November 2010, Chimney North concrete slide completed to a height of 220m. * May 2011: Chimney South first flue cans lined with
borosilicate Borosilicate glass is a type of glass with silica and boron trioxide as the main glass-forming constituents. Borosilicate glasses are known for having very low coefficients of thermal expansion (≈3 × 10−6 K−1 at 20 °C), ma ...
glass installed. * October 2011, upgrade of D1675 access road completed. * 8 September 2011, 10 000 ton coal silo completed. * 21 November 2011, auxiliary boiler completed. * 10 February 2012, direct-current supplies energised. * 27 November 2012, first 24-hour performance test of 5,4 km overland coal conveyor. * September 2013, Unit 4 generator motor threaded into stator. * September 2013, wet run of submerged scraper conveyor conducted, readying boilers for first fire. * November 2014 overland ash conveyor commissioned. * 18 February 2015, then Public Enterprises Minister,
Lynne Brown Lynne Brown (born 26 September 1961) is a South African politician who is a former Minister of Public Enterprises and former Premier of the Western Cape Province. She was born in Cape Town and grew up in Mitchells Plain. She was appointed Premie ...
, announced first unit, no 6 turbine was running at optimal speed of 3000 revolutions per minute. * 22 February 2016, no 5 turbine undergoes load testing. Commercial operation began on 3 April 2017. * 2016, Primary Coal stockyard and conveyor commissioned. * December 2016, Ngwedi substation transformer commissioned (part of Medupi Power Station Integration Project). * 28 November 2017, Unit 4 was commissioned. * 6 June 2018, announced that Unit 3 had entered commercial operation. * 9 October 2018, announced that Unit 2 had been synchronised. By November 2019, this unit had reached full commercial operation. * 27 August 2019, final unit achieved synchronisation. * Peripheral works such as overflow coal yards has a expected completion date of 2021. * October 2020, No-obligation request for information bid issued to gain insight into flue gas desulphurisation (FGD) technologies currently available and to assess their potential suitability for deployment. * 31 July 2021, Eskom announced that the plant had achieved commercial operation status.


Related projects


Bulk water

In order to meet the growing demand for power generation and mining activities in the Lephalale area, two main bulk raw water transfer systems were also required. This comprised a 4.5 MW pump station and 46 km pipeline extracting from the
Mokolo Dam Mokolo Dam (previously known as the Hans Strijdom Dam) is a rock-fill type dam located on the Mokolo River, near Lephalale, Limpopo, South Africa. It was established in 1980. The Malmanies River and the Bulspruit River, two tributaries of the Mok ...
. Phase 1 of this project was commissioned in 2015.


Transmission connection

174 Kilometres of high voltage transmission lines was required from Medupi to the Borutho substation near
Mokopane Mokopane, also known as Potgietersrus, is a town in the Limpopo province of South Africa. The town name was changed to Mokopane in 2003 in honour of a local Ma Nrebele leader, King Mghombane Gheghana , who ruled the area before being conquered ...
. Construction occurred between November 2015 till the end of 2017.


Delays and defects

The dates for full commercial operation were shifted numerous times mostly due to labour disputes such as: *In September 2012, workers were sent home after vehicles and equipment were damaged. *In July 2013, a group of about 1000 workers turned violent damaging vehicles. *In July 2014, the National Union of Metal Workers halted work for weeks. *In March 2015, an eight week illegal strike escalated into violence, damage and intimidation. Delays were also due to technical issues such as steam piping pressure, weld rechecks on the boilers, ash system blockage and damages to mill crushers.


Unit 4 generator explosion

On 9 August 2021, in the second week after Eskom announced that Medupi had attained commercial operation, Medupi Unit 4 was extensively damaged in a hydrogen explosion which caused a loss of 700 MW in generating capacity. The cost of repair was estimated at up to R2 billion, or up to R40 billion over two years.


Cost escalation

The initial expected cost of R80 billion (2007 Rands), was revised to R154 billion (2013 Rands). By 2019, the cost of Medupi was independently estimated at R234 billion (2019 Rands). Some of the primary reasons for the cost escalation was the importing of components affected by a fluctuating Rand exchange rate, redesigns and rework as well as labour disputes and standing time. Due to cost escalations the
African Development Bank The African Development Bank Group (AfDB) or (BAD) is a multilateral development finance institution headquartered in Abidjan, Ivory Coast, since September 2014. The AfDB is a financial provider to African governments and private companies ...
has stated that they do not expect the power plant to produce a positive financial return over the course of its lifetime.


Critics

The building of this power station attracted various criticisms.


Interference

Critics alleged that the government endorsed the project due to the ruling party, the
African National Congress The African National Congress (ANC) is a social-democratic political party in South Africa. A liberation movement known for its opposition to apartheid, it has governed the country since 1994, when the first post-apartheid election install ...
holding a 25% share of a package and stood to make a profit of close to 1 billion Rand.


Coal

Backers of the project argued that new generation coal plants was needed. Other critics argued that effective management of coal supplies was needed to existing stations.


Cost

The
African Development Bank The African Development Bank Group (AfDB) or (BAD) is a multilateral development finance institution headquartered in Abidjan, Ivory Coast, since September 2014. The AfDB is a financial provider to African governments and private companies ...
lent $500 million for the project in 2008. In 2010, the
World Bank The World Bank is an international financial institution that provides loans and grants to the governments of low- and middle-income countries for the purpose of pursuing capital projects. The World Bank is the collective name for the Inte ...
agreed to lend South Africa $3.75 billion to assist with several energy projects, with $3.05 billion allocated for completion.


Emissions

The approval of the World Bank loan drew criticism for supporting increased global emissions of greenhouse gases.


Inquiry

By 2018, the government's Public Enterprises Minister
Pravin Gordhan Pravin Jamnadas Gordhan (born 12 April 1949) is a politician and anti-apartheid activist who has held various ministerial posts in the Cabinet of South Africa. He served as Minister of Finance from 2009 until 2014 and again from 2015 until 2017 ...
announced a forensic probe into the delays and cost overruns on the completion of Kusile and Medupi Power Stations.


National grid context

The Medupi and Kusile power stations were constructed to increase the electricity generation capacity of South Africa. Insufficient electricity generation had resulted in the ongoing South African energy crisis starting in 2007. This has resulted in years of rolling blackouts. As of 11 February 2019, Eskom reinstated load-shedding due to ongoing strain on the national grid from failing older power stations. The blackouts were as severe as those of 2015, removing up to 4,000 MW of demand from the national grid, and negatively impacted the economy. In December 2019, unusually heavy flooding and rain triggered failures at the Medupi plant and forced Eskom to cut 6,000 MW from the national power grid, the biggest power cuts in South Africa in a decade.


See also

*
List of coal power stations The following page lists all coal-fired power stations (including lignite-fired) that are or larger current net capacity, which are currently operational or under construction. If a station also has units which do not burn coal, only coal-fired ca ...
*
List of largest power stations in the world This article lists the largest power stations in the world, the ten overall and the five of each type, in terms of current installed electrical capacity. Non-renewable power stations are those that run on coal, fuel oils, nuclear fuel, natural g ...
*
List of power stations in South Africa A ''list'' is any set of items in a row. List or lists may also refer to: People * List (surname) Organizations * List College, an undergraduate division of the Jewish Theological Seminary of America * SC Germania List, German rugby unio ...


References

{{Power in South Africa , state=collapsed Coal-fired power stations in South Africa Proposed coal-fired power stations Proposed power stations in South Africa Economy of Limpopo