Manitoba Hydro
   HOME

TheInfoList



OR:

The Manitoba Hydro-Electric Board, operating as Manitoba Hydro, is the electric power and natural gas
utility As a topic of economics, utility is used to model worth or value. Its usage has evolved significantly over time. The term was introduced initially as a measure of pleasure or happiness as part of the theory of utilitarianism by moral philosophe ...
in the province of
Manitoba Manitoba ( ) is a Provinces and territories of Canada, province of Canada at the Centre of Canada, longitudinal centre of the country. It is Canada's Population of Canada by province and territory, fifth-most populous province, with a population o ...
, Canada. Founded in 1961, it is a provincial
Crown Corporation A state-owned enterprise (SOE) is a government entity which is established or nationalised by the ''national government'' or ''provincial government'' by an executive order or an act of legislation in order to earn profit for the government ...
, governed by the Manitoba Hydro-Electric Board and the Manitoba Hydro Act. Today the company operates 15 interconnected generating stations. It has more than 527,000 electric power customers and more than 263,000
natural gas Natural gas (also called fossil gas or simply gas) is a naturally occurring mixture of gaseous hydrocarbons consisting primarily of methane in addition to various smaller amounts of other higher alkanes. Low levels of trace gases like carbon d ...
customers. Since most of the electrical energy is provided by hydroelectric power, the utility has low electricity rates. Stations in Northern Manitoba are connected by a
HVDC A high-voltage direct current (HVDC) electric power transmission system (also called a power superhighway or an electrical superhighway) uses direct current (DC) for electric power transmission, in contrast with the more common alternating curre ...
system, the Nelson River Bipole, to customers in the south. The internal staff are members of the
Canadian Union of Public Employees The Canadian Union of Public Employees (CUPE; french: Syndicat canadien de la fonction publique, links=no; french: SCFP, link=, label=none) is a Canadian trade union serving the public sector – although it has in recent years organized work ...
Local 998 while the outside workers are members of the International Brotherhood of Electrical Workers Local 2034. Manitoba Hydro headquarters in the
downtown Winnipeg Downtown Winnipeg is an area of Winnipeg located near the confluence of the Red and Assiniboine rivers. It is the oldest urban area in Winnipeg, and is home to the city's commercial core, city hall, the seat of Manitoba's provincial government, ...
Manitoba Hydro Place officially opened in 2009.


Abbreviated history


1873–1960: electric power before Manitoba Hydro

The first recorded attempt to extract useful work from a Manitoba river was in 1829 at a flour mill (known as Grant's Mill) located on Sturgeon Creek in what is now Winnipeg. This was not successful and the milling equipment was later operated by a
windmill A windmill is a structure that converts wind power into rotational energy using vanes called sails or blades, specifically to mill grain (gristmills), but the term is also extended to windpumps, wind turbines, and other applications, in some ...
. The first public electric lighting installation in Manitoba was demonstrated at the Davis House hotel on Main Street,
Winnipeg Winnipeg () is the capital and largest city of the province of Manitoba in Canada. It is centred on the confluence of the Red and Assiniboine rivers, near the longitudinal centre of North America. , Winnipeg had a city population of 749 ...
, March 12, 1873. In 1880, the Manitoba Electric and Gas Light Company was incorporated to provide public lighting and power, and a year later absorbed the Winnipeg Gas Company. In 1893, the Winnipeg Electric Street Railway Company was formed, and initially purchased power from Manitoba Electric and Gas, but by 1898, it had built its own 1000-
horsepower Horsepower (hp) is a unit of measurement of power, or the rate at which work is done, usually in reference to the output of engines or motors. There are many different standards and types of horsepower. Two common definitions used today are t ...
(750 kW) generating plant and purchased Manitoba Electric and Gas. The first hydroelectric plant in Manitoba operated north of Brandon from 1901 to 1924. Private investors built a earth-fill dam across the Minnedosa River (now known as the Little Saskatchewan River) about a kilometer from its junction with the
Assiniboine River The Assiniboine River (''; french: Rivière Assiniboine'') is a river that runs through the prairies of Western Canada in Saskatchewan and Manitoba. It is a tributary of the Red River. The Assiniboine is a typical meandering river with a sin ...
. The plant only operated part of the year, with the load carried in the winter months by steam generators. An 11-kV wood-pole transmission line connected the station with the town of Brandon, Manitoba. The dam washed out in 1948 but remains are still visible. A second plant was built by private investors near Minnedosa in 1912 but low water levels meant that it only operated intermittently. In 1920 the plant was replaced by a diesel station owned by the Manitoba Power Commission. The dam still exists today at Minnedosa Lake. By 1906, Winnipeg Electric Street Railway had constructed a hydroelectric plant on the Winnipeg River near Pinawa, and of 60-kV transmission line. This plant operated year-round until 1951, when it was shut down to allow improved water flow to other Winnipeg River stations. Its remains are still preserved as a provincial park. Since the investor-owned Winnipeg Electric Street Railway was charging twenty cents per kilowatt-hour, the City of Winnipeg founded its own utility in 1906,Karl Froschauer,''White Gold: Hydroelectric Power in Canada'', UBC Press, 1999 , Chapter 6 and developed a generating station at Pointe du Bois on the Winnipeg River (which still operates). In reaction to this, Winnipeg Electric Street Railway dropped prices to ten cents per kilowatt-hour, but the City-owned utility (Winnipeg Hydro) set a price of 3.5 cents per kilowatt-hour which held for many decades. In 1916, the Province established the Manitoba Power Commission with the object of bringing electric power to communities outside of Winnipeg.
Winnipeg Hydro Winnipeg Hydro is a former provider of electrical power for the city of Winnipeg, Manitoba, Canada. Winnipeg Hydro was established in 1906 as City Hydro. It was purchased by Manitoba Hydro in 2002. History Private electrical generators ...
, Winnipeg Electric Street Railway Company and the Manitoba Hydro Commission all built extensive hydroelectric generating facilities on the Winnipeg River during the period 1916 through 1928. The
Great Depression The Great Depression (19291939) was an economic shock that impacted most countries across the world. It was a period of economic depression that became evident after a major fall in stock prices in the United States. The economic contagio ...
starting in 1929 put an end to rapid growth until after
World War II World War II or the Second World War, often abbreviated as WWII or WW2, was a world war that lasted from 1939 to 1945. It involved the World War II by country, vast majority of the world's countries—including all of the great power ...
. The City of Winnipeg utility built coal-fired steam generators in 1924 on Amy Street, which were also used for
district heating District heating (also known as heat networks or teleheating) is a system for distributing heat generated in a centralized location through a system of insulated pipes for residential and commercial heating requirements such as space heating ...
of downtown buildings. During World War Two, electric boilers at Amy Street used surplus hydroelectric power to economize on coal consumption. The City utility also implemented load management on electric water heaters, which allowed them to be turned off during the day and during peak load periods. In 1949 the Province set up a new utility, the Manitoba Hydro Electric Board (MHEB). In 1953 the MHEB acquired the assets of the Winnipeg Electric Street Railway. The MHEB was tasked with bringing electric power to the rural parts of Manitoba, a task which took until around 1956 to substantially complete. By 1955 there were three utilities in the province: * Manitoba Power Commission (Provincial Government) * Manitoba Hydro Electric Board (Provincial Government) * Winnipeg Hydro Electric System (City of Winnipeg government). Two thermal (coal-fired) stations were built at Brandon and Selkirk starting in 1958. These units were intended to operate during low-water years, and burned
lignite Lignite, often referred to as brown coal, is a soft, brown, combustible, sedimentary rock formed from naturally compressed peat. It has a carbon content around 25–35%, and is considered the lowest rank of coal due to its relatively low heat ...
coal Coal is a combustible black or brownish-black sedimentary rock, formed as rock strata called coal seams. Coal is mostly carbon with variable amounts of other elements, chiefly hydrogen, sulfur, oxygen, and nitrogen. Coal is formed when ...
. In 1957, the first transmission line between Manitoba and North-West Ontario was installed. In 1960, a 138-kV connection to Saskatchewan Power Corporation was completed, and it was later uprated to 230 kV.


1961 to date: the Manitoba Hydro era

The Manitoba Power Commission and Manitoba Hydro Electric Board merged in 1961 to form Manitoba Hydro. One of the earlier wholesale accounts to be transferred to Manitoba Hydro in 1956 was the village of Emerson, which had been served up to that point by a cross-border tie to the Otter Tail Power system at
Noyes Noyes is an English surname of patronymic origin, deriving from the given name Noah. Notable people with the surname include: * Albertina Noyes (born 1949), American figure skater * Alfred Noyes (1880–1958), English poet * Arthur Amos Noyes (18 ...
. The last of the private mine-owned utility systems at Flin Flon was purchased by Manitoba Hydro in 1973. The early 1970s also marked the installation of tie lines between Manitoba Hydro and utilities in Ontario, Saskatchewan and Minnesota. The interconnection with the American utilities (Otter Tail Power,
Northern States Power Northern States Power Company () was a publicly traded S&P 500 electric and natural gas utility holding company based in Minneapolis, Minnesota, that is now a subsidiary of Xcel Energy (). History The company's founder, Henry Marison Byllesby, ha ...
, and Minkota Power Cooperative) were used to obtain firm power of 90 MW for the winter of 1970; and since that time these interconnections have also been used for export of energy. In the period 1974 to 1976, Manitoba Hydro was still studying
nuclear power Nuclear power is the use of nuclear reactions to produce electricity. Nuclear power can be obtained from nuclear fission, nuclear decay and nuclear fusion reactions. Presently, the vast majority of electricity from nuclear power is produced b ...
, but it concluded that all hydraulic resources should be developed first before construction of any nuclear facility. Although a research nuclear reactor existed at the Pinawa AECL research facility, no nuclear generating capacity has ever been constructed in Manitoba. In July 1999, Manitoba Hydro purchased the natural gas distribution company Centra Gas Manitoba. In September 2002, Manitoba Hydro purchased
Winnipeg Hydro Winnipeg Hydro is a former provider of electrical power for the city of Winnipeg, Manitoba, Canada. Winnipeg Hydro was established in 1906 as City Hydro. It was purchased by Manitoba Hydro in 2002. History Private electrical generators ...
, which formerly provided electric power in the
downtown ''Downtown'' is a term primarily used in North America by English speakers to refer to a city's sometimes commercial, cultural and often the historical, political and geographic heart. It is often synonymous with its central business district ...
area of
Winnipeg Winnipeg () is the capital and largest city of the province of Manitoba in Canada. It is centred on the confluence of the Red and Assiniboine rivers, near the longitudinal centre of North America. , Winnipeg had a city population of 749 ...
.


Nelson River development

The water power potential of the Nelson River was described as early as 1911, when over 6 million
horsepower Horsepower (hp) is a unit of measurement of power, or the rate at which work is done, usually in reference to the output of engines or motors. There are many different standards and types of horsepower. Two common definitions used today are t ...
of potential generation capacity was identified at 11 sites – at a time when the developed hydropower in the rest of Canada was around 1 million horsepower. Between 1955 and 1960, studies were carried out to determine what resources would be available for future hydraulic generation. The stations at Kelsey, Kettle, Long Spruce and Limestone were built on the lower Nelson River to support both Manitoba load growth and export plans. Limestone, the largest generating station in Manitoba, is located on the Lower Nelson only 90 km from
Hudson Bay Hudson Bay ( crj, text=ᐐᓂᐯᒄ, translit=Wînipekw; crl, text=ᐐᓂᐹᒄ, translit=Wînipâkw; iu, text=ᑲᖏᖅᓱᐊᓗᒃ ᐃᓗᐊ, translit=Kangiqsualuk ilua or iu, text=ᑕᓯᐅᔭᕐᔪᐊᖅ, translit=Tasiujarjuaq; french: b ...
. Long-term firm power sales contracts were signed with Northern States Power. Control dams have turned
Lake Winnipeg Lake Winnipeg (french: Lac Winnipeg, oj, ᐑᓂᐸᑲᒥᐠᓴᑯ˙ᑯᐣ, italics=no, Weenipagamiksaguygun) is a very large, relatively shallow lake in North America, in the province of Manitoba, Canada. Its southern end is about north of ...
, the 12th largest lake in the world, into a 25,000 km2 reservoir for the Nelson River generation system. The great distance between generating sites on the Nelson River and load centers in southern Manitoba required the use of
HVDC A high-voltage direct current (HVDC) electric power transmission system (also called a power superhighway or an electrical superhighway) uses direct current (DC) for electric power transmission, in contrast with the more common alternating curre ...
transmission lines to bring the energy to market. When these lines were commissioned, they were the longest and highest-voltage direct current lines in the world. The Dorsey converter station is 26 km north-west of the center of Winnipeg.


Wind development

Starting in 2005, a
wind farm A wind farm or wind park, also called a wind power station or wind power plant, is a group of wind turbines in the same location used to produce electricity. Wind farms vary in size from a small number of turbines to several hundred wind turb ...
was built near St. Leon, Manitoba. Power generated by this privately constructed plant is purchased by Manitoba Hydro for distribution on its network. The capacity of this installation is 99.9 MW, comprising 63
wind turbine A wind turbine is a device that converts the kinetic energy of wind into electrical energy. Hundreds of thousands of large turbines, in installations known as wind farms, now generate over 650 gigawatts of power, with 60 GW added each year. ...
s of 1.65 MW each. This is the first privately owned grid-connected generation to be constructed in Manitoba in nearly fifty years. Energy produced by this facility is subsidized by the Canadian Government's
Wind Power Production Incentive The Wind Power Production Incentive, or WPPI, was a program of the Canadian Government that promoted the generation of electricity from wind power in Canada to reduce the amount of greenhouse gas that would otherwise enter the atmosphere from burn ...
, though over the life of the project tax revenue will exceed the value of the initial subsidy. The 138 megawatt
St. Joseph Wind Farm St. Joseph Wind Farm (french: Parc éolien de Saint-Joseph) is a wind energy power plant in southern Manitoba, Canada. It has 60 turbines with a total rating of 138 megawatts. First proposed in 2007, the turbines started operation in earl ...
began operation in 2011. Multiple wind farm sites with capacities between 50 and 200 MW have been studied for Manitoba. The Manitoba
OASIS In ecology, an oasis (; ) is a fertile area of a desert or semi-desert environment'ksar''with its surrounding feeding source, the palm grove, within a relational and circulatory nomadic system.” The location of oases has been of critical imp ...
node has generator interconnection evaluation studies for wind farms at Elie, Lena, Darlingford, Boissevain, Killarney, and Minnedosa. Additional probable wind farm sites of up to 200 MW are in the generation queue on the OASIS for St. Leon, St. Laurent, Letellier, Waskada, Alexander, Lizard Lake, Lk. Manitoba Narrows and other locations.


Winnipeg Hydro

Winnipeg Hydro is a former provider of electrical power for the city of
Winnipeg Winnipeg () is the capital and largest city of the province of Manitoba in Canada. It is centred on the confluence of the Red and Assiniboine rivers, near the longitudinal centre of North America. , Winnipeg had a city population of 749 ...
,
Manitoba Manitoba ( ) is a Provinces and territories of Canada, province of Canada at the Centre of Canada, longitudinal centre of the country. It is Canada's Population of Canada by province and territory, fifth-most populous province, with a population o ...
. Winnipeg Hydro was established in 1906 and was purchased by Manitoba Hydro in 2002. In 1906, voters approved a $3.25 million expenditure for development of a hydroelectric plan at Pointe du Bois. Immediately following the decision to build the Pointe du Bois plant, the price of electricity charged by the private sector in Winnipeg dropped from 20 cents per kilowatt-hour to 10 cents and subsequently to 7 1/2 cents. After completion of the plant in 1911, Winnipeg Hydro set its rate at 3 1/3 cents per kilowatt-hour. This rate remained unchanged until 1973. Customers of Winnipeg Hydro enjoyed among the lowest electricity rates in North America. In September 2002, Winnipeg Hydro officially closed its doors embarking on a new era as part of Manitoba Hydro.


Manitoba Hydro Act

The ''Manitoba Hydro Act'' governs Manitoba Hydro. The purpose of the Manitoba Hydro Act was to provide for efficient, economical supply of electric power for the needs of the province. The first version of the act was effective March 31, 1961 and it has been revised since that date. Notably, the Act now carries a provision prohibiting privatization of Manitoba Hydro without a public referendum. Since 1970, a Minister responsible for the Manitoba Hydro Act has sat on Executive Council of Manitoba. This position is not a full departmental portfolio in the Manitoba executive council, and it is generally held by ministers who also hold other cabinet responsibilities.


Generating stations

Typical peaking only Generating station total ratings are approximate. Water flow conditions and station service load may account for some of the difference between rated station output and total unit nameplate rating. In a typical year the hydroelectric plants produce more than ninety-five percent of the energy sold.


Transmission


AC system

Manitoba Hydro operates an extensive network of more than 9000 km of ac transmission lines. Transmission voltages in use include: *66 kV *115 kV *138 kV *230 kV *500 kV Distribution voltages include 4160 V especially in urban Winnipeg, 12.47 kV and 25 kV, usually on overhead conductors but often in buried cables. Total length of distribution lines is over 80,000 km. Transmission lines built in Manitoba must withstand a wide temperature range, ice, and occasional high winds. In 1997, a
tornado A tornado is a violently rotating column of air that is in contact with both the surface of the Earth and a cumulonimbus cloud or, in rare cases, the base of a cumulus cloud. It is often referred to as a twister, whirlwind or cyclone, alt ...
blew down 19 transmission towers of the HVDC system north of Winnipeg, reducing transmission capacity from the North to a small fraction of system capacity. During the several days required for utility employees to repair this line, power was imported from the United States over the 500 kV interconnection. As a consequence, though some major industrial customers were requested to curtail energy use, disruption for most customers remained small.


DC system

A large portion of the energy generated on the Nelson river is transmitted south on the HVDC Nelson River Bipole system. The two transmission lines BIPOLE I and BIPOLE II, each nearly 900 km long, operate at ± 450 kV and ± 500 kV DC, with converter stations at Gillam and
Sundance A Sun Dance is a Native American ceremony. Sun dance or Sundance may also refer to: Places ;Canada * Sundance, Calgary, Alberta, a neighbourhood * Sundance, Manitoba, a ghost town ;United States * Sundance, New Mexico, a census-designated pla ...
, and the inverter station, Dorsey, near Rosser. The combined capacity of the two HVDC lines is 3420 MW, or about 68% of the total generation capacity in the province. A third HVDC line, BIPOLE III was completed July 4, 2018. At a cost of $4.7B, it carries 2000 MW capacity over 3076 towers and 1384 km. Two new converter stations were built at Keewatinohk on the Nelson River and at Riel east of Winnipeg. A different route from northern Manitoba was chosen for BIPOLE III in order to provide safety and redundancy in case BIPOLE I and II which run side by side for much of the route and end at the same converter station were simultaneously damaged.


Exports

Manitoba Hydro has transmission lines connecting with
Saskatchewan Saskatchewan ( ; ) is a Provinces and territories of Canada, province in Western Canada, western Canada, bordered on the west by Alberta, on the north by the Northwest Territories, on the east by Manitoba, to the northeast by Nunavut, and on t ...
,
Ontario Ontario ( ; ) is one of the thirteen provinces and territories of Canada.Ontario is located in the geographic eastern half of Canada, but it has historically and politically been considered to be part of Central Canada. Located in Central Ca ...
,
North Dakota North Dakota () is a U.S. state in the Upper Midwest, named after the indigenous Dakota Sioux. North Dakota is bordered by the Canadian provinces of Saskatchewan and Manitoba to the north and by the U.S. states of Minnesota to the east, ...
and
Minnesota Minnesota () is a state in the upper midwestern region of the United States. It is the 12th largest U.S. state in area and the 22nd most populous, with over 5.75 million residents. Minnesota is home to western prairies, now given over t ...
. Ties to the Canadian provinces are of low capacity but a substantial portion of Manitoba Hydro's annual generation can be exported over the tie to Minnesota. In 2003, a new line was completed to the United States (the Harvey-Glenboro 230kV line), allowing a firm export capacity of 700 megawatts. In 2005 Manitoba Hydro announced increased interchange up to 500 MW with Ontario, after construction of additional transmission facilities. Manitoba Hydro's largest interconnection is the Dorsey-Forbes-Chisago 500,000 volt (AC) line that begins at the Dorsey substation located in Rosser near Winnipeg and travels south into the
United States The United States of America (U.S.A. or USA), commonly known as the United States (U.S. or US) or America, is a country Continental United States, primarily located in North America. It consists of 50 U.S. state, states, a Washington, D.C., ...
and takes a southeasterly direction to the Forbes Substation northwest of
Duluth, Minnesota , settlement_type = City , nicknames = Twin Ports (with Superior, Wisconsin, Superior), Zenith City , motto = , image_skyline = , image_caption = Clockwise from top: Downtown Dul ...
and from there goes south to the Chisago substation located just north of
St. Paul, Minnesota Saint Paul (abbreviated St. Paul) is the capital of the U.S. state of Minnesota and the county seat of Ramsey County. Situated on high bluffs overlooking a bend in the Mississippi River, Saint Paul is a regional business hub and the center o ...
. Manitoba Hydro also participates in "border accommodation" transfers, where it provides power to isolated extraprovincial end-use loads such as those of the
Northwest Angle The Northwest Angle, known simply as the Angle by locals, and coextensive with Angle Township, is a pene-exclave of northern Lake of the Woods County, Minnesota. Except for surveying errors, it is the only place in the contiguous United Stat ...
in Minnesota. Manitoba Hydro is a member of the MRO
Midwest Reliability Organization The Midwest Reliability Organization (MRO) began operations on January 1, 2005, as the successor to the Mid-continent Area Power Pool (MAPP), which was formed in 1965. MRO is one of six regional entities under North American Electric Reliability ...
, a region of the North American Electrical Reliability Council NERC and successor to MAPP (Mid-continent Area Power Pool) since June 15, 2004. Manitoba Hydro continues its membership in MAPP, which retains its function as a generation reserves sharing pool. Export of electrical energy has been regulated since 1907 in Canada. Since 1959, the
National Energy Board The National Energy Board was an independent economic regulatory agency created in 1959 by the Government of Canada to oversee "international and inter-provincial aspects of the oil, gas and electric utility industries". Its head office was located ...
licences exports, based on the criteria that the exports are surplus to domestic need and that the price charged is reasonable and in the Canadian public interest. Similarly, exporters of power from the United States into Canada require a United States Export Authorization.


Natural gas customers

Manitoba Hydro has about 238,000 residential, and 24,700 commercial and industrial customers. In fiscal 2008 total gas revenues were $580 million
CAD Computer-aided design (CAD) is the use of computers (or ) to aid in the creation, modification, analysis, or optimization of a design. This software is used to increase the productivity of the designer, improve the quality of design, improve co ...
on 2,165 million cubic metres of gas. Residential consumers account for about 48% of Manitoba gas consumption.


Recent and current projects

Manitoba Hydro has a capital spending program intended to maintain and extend capacity for Manitoba customers, for environmental protection, and to allow export of energy surplus to Manitoba needs to stabilize rates. Some of these projects include: * ''Power Smart'': Manitoba Hydro has operated a Power Smart program since 1991. This project identifies energy conservation and efficiency opportunities for residential, commercial and industrial customers. Measures such as high-efficiency
electric motor An electric motor is an electrical machine that converts electrical energy into mechanical energy. Most electric motors operate through the interaction between the motor's magnetic field and electric current in a wire winding to generate for ...
s and improved
lighting Lighting or illumination is the deliberate use of light to achieve practical or aesthetic effects. Lighting includes the use of both artificial light sources like lamps and light fixtures, as well as natural illumination by capturing daylig ...
have offset 292 MW of peak load growth and up to 631 million kW·h per year of energy consumption. In 2005 Manitoba Hydro announced goals of doubling Power Smart capacity savings to 842 MW and 2.6 terawatt-hours by 2018. * ''INROCS (Interlake Nelson River Optical Cable System)'' is the replacement of the former
microwave Microwave is a form of electromagnetic radiation with wavelengths ranging from about one meter to one millimeter corresponding to frequencies between 300 MHz and 300 GHz respectively. Different sources define different frequency ra ...
links for control of northern generation and transmission with a buried
fiber optic An optical fiber, or optical fibre in Commonwealth English, is a flexible, transparent fiber made by drawing glass (silica) or plastic to a diameter slightly thicker than that of a human hair. Optical fibers are used most often as a means t ...
cable system. More than 1140 km of cable were buried between the system control center in Winnipeg, to the present northernmost stations near Gillam. * ''Brandon Combustion Turbines'': In 2003, Manitoba Hydro commissioned two simple-cycle
gas turbine A gas turbine, also called a combustion turbine, is a type of continuous flow internal combustion engine. The main parts common to all gas turbine engines form the power-producing part (known as the gas generator or core) and are, in the directio ...
generating units at the existing plant in Brandon. These
natural gas Natural gas (also called fossil gas or simply gas) is a naturally occurring mixture of gaseous hydrocarbons consisting primarily of methane in addition to various smaller amounts of other higher alkanes. Low levels of trace gases like carbon d ...
-fuelled units are intended to provide peaking power and supplemental capacity in case of low water levels. * ''Selkirk Natural Gas Conversion'': In 2003, the fuel supply of the Selkirk steam boilers was converted to natural gas. While this is a more expensive fuel than the coal previously used at this plant, it allows the life of the station to be extended without the capital cost required to clean coal emissions up to current standards. * ''Wind Energy Survey'': While Manitoba Hydro is in the process of completing a wind energy survey at five locations, private developers have completed wind farms at St. Leon and St. Joseph, and will sell all power generated to Manitoba Hydro. Manitoba Hydro has not announced an in-service date for additional utility-owned wind generation. * ''New Hydraulic Generation (Keeyask, Conawapa, Notigi) and HVDC Transmission

'': Studies are continuing to permit eventual construction of new generating projects along the
Nelson River The Nelson River is a river of north-central North America, in the Canadian province of Manitoba. The river drains Lake Winnipeg and runs before it ends in Hudson Bay. Its full length (including the Saskatchewan River and Bow River) is , i ...
. The Keeyask station (formerly known as Gull) would have a capacity of approximately 695 megawatts and started construction in 2014. Expected completion of the station will be in 2019. In February 2009 the
Tataskweyak Cree Nation The Tataskweyak Cree Nation ( cr, ᑕᑕᐢᑿᔭᕽ, tataskwayak) (Formerly known as ''Split Lake Cree First Nation'' in English) is a First Nations band government whose primary community is located at Split Lake, Manitoba, on the Nelson River ...
community voted in favor of participation in the project. The 1380 megawatt Conawapa project was initiated but postponed indefinitely in 1992 when
Ontario Hydro Ontario Hydro, established in 1906 as the Hydro-Electric Power Commission of Ontario, was a publicly owned electricity utility in the Province of Ontario. It was formed to build transmission lines to supply municipal utilities with electricity g ...
elected not to purchase firm energy from Manitoba. Planning activities for Conawapa were suspended in 2014 and no environmental hearings are currently scheduled. The potential generating station at Notigi would produce approximately 100 megawatts, and would create no new flooding, but no in-service date has been set for this project, and no plans are in progress to build the station at this time. * ''Pointe du Bois'' replacement: In 2007 Manitoba Hydro announced plans to replace the 90-year-old Point du Bois plant with a new $800 million (Canadian) generating project at the same site, with greater output, reliability, and efficiency. * In September 2009, the company completed its headquarters building, the
Manitoba Hydro Tower Manitoba Hydro Place (MHP) is an office tower serving as the headquarters building of Manitoba Hydro, the electric power and natural gas utility in the province of Manitoba, Canada. Located at 360 Portage Avenue in downtown Winnipeg and connected ...
on
Portage Avenue Portage or portaging (Canada: ; ) is the practice of carrying water craft or cargo over land, either around an obstacle in a river, or between two bodies of water. A path where items are regularly carried between bodies of water is also called a ...
. About 1650 Hydro employees work in this building. It is the 4th tallest building in the city at 112.5 metres to the top of
solar chimney :''This article refers to a device for ventilation. For the power generation technology, see Solar updraft tower.'' A solar chimney often referred to as a thermal chimney is a way of improving the natural ventilation of buildings by using convect ...
with a total of 22 stories and floor space. The building is intended to be one of the most energy-efficient building of its size in North America, and to consume 60% less energy than the national building code requirements.


Wuskwatim generating station

Wuskwatim generating station is on the
Burntwood River The Burntwood River is a river in northeast Manitoba, Canada between the Churchill River and the Nelson River. Outsiders may know it as the river that passes through Thompson, Manitoba. It is over long and flows mostly east to join the Nelson Ri ...
near
Thompson Thompson may refer to: People * Thompson (surname) * Thompson M. Scoon (1888–1953), New York politician Places Australia *Thompson Beach, South Australia, a locality Bulgaria * Thompson, Bulgaria, a village in Sofia Province Canada * ...
. The general civil works contract was awarded in 2008, and first power from the project occurred in June 2012. The plant was officially opened on July 5, 2012, while construction of the remaining two units continued. This 200 MW station has three hydraulic turbine generator units, causes less than one half square kilometre of new flooding, and has only a small reservoir. This project had the most extensive environmental review of any generating project in Manitoba. Participation of the
Nisichawayasihk Cree Nation The Nisichawayasihk Cree Nation (NCN; cr, ᓂᓯᒐᐚᔭᓯᕽ, nisicawâyasihk; formerly the Nelson House First Nation) is a Cree First Nations community centered in Nelson House, Manitoba, Canada. Its main reserve is Nelson House 170. Nelson ...
(NCN) First Nation was passed by a June 2006 referendum by NCN members. This partnership between NCN and Manitoba Hydro will allow advancement of the in-service date to 2012 and opportunities for additional export revenue. Otherwise the domestic load growth would not require this new capacity until several years later. Excavation and primary concrete for the dam, powerhouse and spillway was mainly completed by June 2009. The spillway gate hoist housing had been erected and the river closure and diversion occurred in July 2009. Construction required an access road and construction camp site, and a construction power substation, along with services such as water supply and sewage lagoons for the camp. A new 230 kV gas-insulated substation was constructed adjacent to the dam site, which will distribute power from the Wuskwatim generators to the transmission network. A
cofferdam A cofferdam is an enclosure built within a body of water to allow the enclosed area to be pumped out. This pumping creates a dry working environment so that the work can be carried out safely. Cofferdams are commonly used for construction or re ...
was constructed for excavation of the tailrace and spillway channel, and subsequently removed. Secondary concrete and turbine installation continued through the summer and fall of 2010. The construction camp population varies according to activity level but as of July 2010 there were 635 workers in the construction camp.


Potential future projects

More than 5000 MW of hydroelectric potential could be developed in Manitoba, which includes 1380 MW at the Conawapa site, 695 MW at the Keeyask site, and 1000 MW at the Gillam Island site, all on the lower Nelson river. Other sites have been assessed but are not currently under study for development. All of these developments would require a large increase in electric power exports, since Manitoba load growth will not require this capacity for a generation or more. All of these projects require additional
HVDC A high-voltage direct current (HVDC) electric power transmission system (also called a power superhighway or an electrical superhighway) uses direct current (DC) for electric power transmission, in contrast with the more common alternating curre ...
transmission capacity from the North to the South. One such project, Bipole III, has been discussed with communities on the east side of
Lake Winnipeg Lake Winnipeg (french: Lac Winnipeg, oj, ᐑᓂᐸᑲᒥᐠᓴᑯ˙ᑯᐣ, italics=no, Weenipagamiksaguygun) is a very large, relatively shallow lake in North America, in the province of Manitoba, Canada. Its southern end is about north of ...
, but this area is
ecological Ecology () is the study of the relationships between living organisms, including humans, and their physical environment. Ecology considers organisms at the individual, population, community, ecosystem, and biosphere level. Ecology overlaps wi ...
ly and
culturally sensitive Cultural sensitivity, also referred to as cross-cultural sensitivity or cultural awareness, is the knowledge, awareness, and acceptance of other cultures and others' cultural identities. It is related to cultural competence (the skills needed fo ...
and power line construction will require extensive environmental impact assessment.


Controversies and issues

Like any other large-scale activity, the operations of Manitoba Hydro have not been without controversy. * In 1976, the Churchill River diversion project was set into operation. Flow was diverted by a series of channels and control structures into the
Nelson River The Nelson River is a river of north-central North America, in the Canadian province of Manitoba. The river drains Lake Winnipeg and runs before it ends in Hudson Bay. Its full length (including the Saskatchewan River and Bow River) is , i ...
. The effects of this diversion on pre-existing water levels and the indigenous Cree and
Métis people The Métis ( ; Canadian ) are Indigenous peoples who inhabit Canada's three Prairie Provinces, as well as parts of British Columbia, the Northwest Territories, and the Northern United States. They have a shared history and culture which derives ...
continue to be felt to this day. Negotiations between the affected Northern communities and Manitoba Hydro continue, to discuss mitigation measures and compensation for loss of traditional resource areas and sites. * The water level of
Lake Winnipeg Lake Winnipeg (french: Lac Winnipeg, oj, ᐑᓂᐸᑲᒥᐠᓴᑯ˙ᑯᐣ, italics=no, Weenipagamiksaguygun) is a very large, relatively shallow lake in North America, in the province of Manitoba, Canada. Its southern end is about north of ...
is now regulated by Manitoba Hydro as part of the energy generation operations. Some property owners on the southern edge of the lake feel that the levels are now maintained at a higher average level than would be natural, and attribute erosion of their property to the lake level. Manitoba Hydro has pointed out that the regulation project also allows lake level to be lowered, such as during the 1997 floods, thereby preventing significant property damage. * Residents of the area around the Selkirk steam plant attributed various environmental damage to the continued operation of this plant, which at the time was fuelled by
coal Coal is a combustible black or brownish-black sedimentary rock, formed as rock strata called coal seams. Coal is mostly carbon with variable amounts of other elements, chiefly hydrogen, sulfur, oxygen, and nitrogen. Coal is formed when ...
. Manitoba Hydro has converted this plant to natural gas, which, while a more expensive and faster-depleting energy source than coal, burns with lower emissions of heavy metals, sulfur dioxide, and carbon dioxide. * The Province of Manitoba charges Manitoba Hydro a water rental fee proportionate to the total volume of water passed through the generating stations. Increases in this rental have provided an important stream of non-tax revenue to the Provincial government. While at first glance it may seem superfluous for the provincial government to collect such fees from a company it owns, the government argues that such fees help ensure that Manitobans receive a direct return on that portion of energy resources that is exported. More controversially, in 2002–2004 the New Democratic Party provincial government collected a direct dividend from Manitoba Hydro. This was criticized by the provincial opposition parties for various reasons but mostly as evidence that Hydro rates were unnecessarily high with the excess amounting to a hidden tax. * Manitoba Hydro has studied new HVDC transmission lines to run along the east side of Lake Winnipeg. The additional transmission capacity would be required to develop stations at Keeyask and Conawapa. This plan would offset the concentration of transmission lines in the Interlake area (west of Lake Winnipeg and east of Lake Manitoba), and would provide additional security against transmission failures due to adverse weather or other causes. However, this area has no roads and very little development. Some environmentalists argue that this vast area of
boreal forest Taiga (; rus, тайга́, p=tɐjˈɡa; relates to Mongolic and Turkic languages), generally referred to in North America as a boreal forest or snow forest, is a biome characterized by coniferous forests consisting mostly of pines, spruc ...
should not be crossed by a transmission corridor. If roads were built at the same time as the lines, these roads would allow year-round access to small First Nation communities east of the lake; some people feel this would have more adverse than beneficial effects for these communities. From an engineering perspective, there is no connection between building a new transmission line east of Lake Winnipeg, and building a road east of the lake. In May 2005, the provincial government announced that it would not consider any route along the east side of Lake Winnipeg, even though the alternative routes through the Interlake region or west of Lake Manitoba would extend the transmission lines, and increase cost. The western route was chosen by the government to protect the proposed UNESCO biosphere reserve on the east side by local First Nations reserves called
Pimachiowin Aki Pimachiowin Aki ( ) is a UNESCO World Heritage Site located in the boreal forest that covers parts of Manitoba and Ontario. The site is more than in area, and includes ancestral lands of four First Nations including Poplar River First Nation, L ...
. This decision was criticized by 19 former senior Manitoba Hydro engineers, who were in favour of the East side route. * A transmission line down the west side of the province could also have adverse environmental effects: several caribou herds use the area near The Pas, several ecological reserves occur on the west side of the province (Lake Winnipegosis Salt Flats, Birch River ), as well as UNESCO's Riding Mountain Biosphere Reserve, three provincial parks ( Duck Mountain, Clearwater and Kettle Stones), one Park Reserve (Walter Cook Caves ), one Provincial Forest (
Porcupine Hills The Porcupine Hills refer to various groups of hills and uplands located in the prairie provinces of Canada, specifically the provinces of Saskatchewan and Manitoba. They are part of the Manitoba Escarpment, which was the shoreline of the anci ...
), and two Wildlife Management Areas (Tom Lamb WMA and Saskeram WMA ).


Tritschler commission inquiry of 1979

Concerns about the economy and efficiency of Manitoba Hydro's development program led the provincial government to form a commission of inquiry in 1977. Project cost overruns, and expanded capital spending during a time of declining electricity demand raised serious doubts about the timing of the Lake Winnipeg Regulation project and the development of projects along the Nelson River. The ''Tritschler Commission'' (named for Justice George Eric Tritschler (1901–1993) ) delivered its final report in December 1979, which made 51 recommendations on Manitoba Hydro governance, planning, financing and operations.http://www.energymanitoba.org/wusk_archives/documents/Tritschler2002_BHSummary.pdf Tritschler summary, retrieved 2011 01 21


Comparison of Manitoba Hydro to other utilities

Manitoba Hydro is unusual in North America because it is the sole commercial provider of electrical power in the province of Manitoba. It is a Crown corporation closely regulated by the Provincial government. This status arose because of the history of electrification in the Province, where early private commercial developers required a large initial return on investment owing to the high risks of the projects. This limited the economic benefits that electrification would bring. Manitoba Hydro is required by its regulating legislation to give priority to public benefit over profit. Another unusual feature of Manitoba Hydro is that it is a completely integrated electrical utility, with generation, transmission, and distribution operations. This means that Manitoba Hydro can consider the total system cost and benefits of any new development, rather than, for example, building generation capacity that relies on a second party for transmission. An example of this approach was seen at the Clean Environment Commission public hearings for the recent Wuskwatim Generation Project and the Wuskwatim Transmission Project, in which environmental reviews for both the generating station and associated transmission facilities were carried out at the same time. Manitoba Hydro's mandate to serve dictates that it builds enough transmission and generating firm capacity to serve the Manitoba home market first. However, in a typical year, more energy is available than the firm capacity. This can be economically exported from the Province. Since this energy is typically sold on short-term contracts or even on a
spot market The spot market or cash market is a public financial market in which financial instruments or commodities are traded for immediate delivery. It contrasts with a futures market, in which delivery is due at a later date. In a spot market, settle ...
, the returns on these sales increase Manitoba Hydro's retained earnings, allowing domestic rates to be stable and low. Since Manitoba Hydro is a
Crown Corporation A state-owned enterprise (SOE) is a government entity which is established or nationalised by the ''national government'' or ''provincial government'' by an executive order or an act of legislation in order to earn profit for the government ...
paying no dividends and not obligated to provide a return on investment to shareholders, energy costs to industrial and residential consumers are lower than they would otherwise be. These lower costs help offset some of the higher costs of doing business in a region far from large markets. As a Provincial Crown Corporation, investment decisions by Manitoba Hydro are heavily influenced by political and economic goals of the provincial government. For example, in the 1986 Manitoba provincial election, the incumbent New Democratic Party government announced accelerated construction of the Limestone project, with promises of increased employment as a result. Limestone GS was estimated to create 6000 person-years of direct employment, 11,000 of indirect employment over the construction period of eight years. As part of the contract for the ten turbine-generator units,
Canadian General Electric GE Canada (or General Electric Canada) is the wholly-owned Canadian unit of General Electric, manufacturing various consumer and industrial electrical products all over Canada. GE Canada was preceded by the company Canadian General Electric (CG ...
agreed to invest $10,000,000 CAD in Manitoba business operations, and to obtain at least 15 per cent of installation labour locally.


Current activities

For the fiscal year ending March 31, 2015, Manitoba Hydro serves a peak Manitoba electrical load of more than 4460 megawatts, down 4.9% from the previous year's peak (2013 year end for comparison in parentheses)(4500 megawatts). Electrical supply to Manitoba customers was 21.6 terawatt-hours in fiscal 2015 (21.5 2013), with total revenue due to electricity of $1.808 billion ($1.733 billion) CAD. Extraprovincial sales were at 10.28 terawatthours ( 9.1 terawatthours), with normal water flows. The company also delivered 2.07 billion cubic metres (2.05 billion) cubic metres of natural gas in 2015, which contributed $573 million CAD to revenues.Manitoba Hydro 65th Annual Report 2014–2015Manitoba Hydro 62nd Annual Report 2012–2013 Manitoba Hydro had 6410 employees at the end of the 2015 fiscal year (6493 in 2013). Capital assets were valued at nearly $13.9 billion CAD. In fiscal 2015 the total generation was 35.0 terawatt-hours (33.2 in fiscal 2013). In 2001 generation was nearly 32.7 terawatt-hours, allowing net export of 12 TW·h to customers in the United States, Ontario and Saskatchewan. A terawatt-hour is the average annual consumption of 70,000 Manitoba residences, 14,100 kW·h per year each. The peak load was 4,535 MW. In fiscal 2015 Manitoba Hydro obtained 0.16% of its total generated electrical energy from fossil fuel at the Brandon and Selkirk thermal generating stations, and 2.38% from wind energy purchased from the St. Leon and St. Joseph wind power projects. About 0.24% of energy distributed in the province was imported. A subsidiary company, Manitoba Hydro International, provides electric power consulting services. Manitoba Hydro also operates a high-voltage DC laboratory. Meridium Power, a subsidiary company, markets a line of written-pole AC
electric motor An electric motor is an electrical machine that converts electrical energy into mechanical energy. Most electric motors operate through the interaction between the motor's magnetic field and electric current in a wire winding to generate for ...
s suitable for heavy loads on single-phase systems and for power quality improvement. W.I.R.E. Services supplies services to transmission line operators for re-rating and verification of transmission line capacity.


See also

* Crown corporation * Electric power *
Environmental concerns with electricity generation Electric power systems consist of generation plants of different energy sources, transmission networks, and distribution lines. Each of these components can have environmental impacts at multiple stages of their development and use including in ...
*
Hydroelectricity Hydroelectricity, or hydroelectric power, is electricity generated from hydropower (water power). Hydropower supplies one sixth of the world's electricity, almost 4500 TWh in 2020, which is more than all other renewable sources combined an ...
*
List of Canadian electric utilities This is a list of the electric utilities in Canada. List of electric utilities by size List of electric utilities by province or territory This is a list of Canadian public and private electric utilities, by province. Electric Trans ...
*
Nelson River Hydroelectric Project The Nelson River Hydroelectric Project refers to the construction of a series of dams and hydroelectric power plants on the Nelson River in Northern Manitoba, Canada. The project began to take shape in the late 1950s, with the planning and construc ...
* Manitoba Electrical Museum *
Electricity sector in Canada The electricity sector in Canada has played a significant role in the economic and political life of the country since the late 19th century. The sector is organized along provincial and territorial lines. In a majority of provinces, large gove ...
* List of hydroelectric power station failures


References


Further reading

*L. A. Bateman, "The Manitoba Utility Story – Day 1 to Year 1974", paper in Canadian Electricity Association, "Proceedings of the Eighty-Fourth Annual Meeting 1974", Banff Springs Hotel, Banff, Alberta *L. A. Bateman, "A History of Electric Power Development in Manitoba" printed in the Winter 2005 edition of "IEEE Canadian Review"
Manitoba Historical Society History of the Electrical Industry in Manitoba
*Manitoba Hydro Annual Report 2003 *http://www.hydro.mb.ca Manitoba Hydro Corporate Web Site *Manitoba Clean Environment Commission Web Site
The Manitoba Hydro Act H190, CCSM
*http://www.hvdc.ca High Voltage DC Laboratory
Ecological impacts of Manitoba Hydro operations on Hudson Bay, includes a map of Manitoba Hydro generation facilities
*Alan Wyatt, Electric Power: Challenges and Choices'', Book Press Ltd., Toronto, (1986)
Annual report for the year ended March 31, 2005
; Manitoba Hydro publications * * *


External links


Manitoba Electrical Museum

Manitoba Hydro annual reports

Manitoba Hydro Bipole 3 Information
{{Authority control Companies based in Winnipeg Crown corporations of Manitoba Hydroelectric power companies of Canada Natural gas companies of Canada Electric power companies of Canada Wind power in Canada Energy in Manitoba 1961 establishments in Manitoba